DEAR RAY:

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001100020005-3
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
16
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 2, 2004
Sequence Number: 
5
Case Number: 
Publication Date: 
June 6, 1968
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001100020005-3.pdf352.14 KB
Body: 
STATINTL Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 Attachment to TS pAD.zcr8168 June 6, 1968 STATINTL Dear Ray: Enclosed is a detailed breakdown on man-hours and cost for our proposal no. 6927-59. (Microdensitometry Support). Some of these are essentially continuations of previous work (Task 1, Task 4, and Task 5). Tasks 2, 3, and 6 are additional efforts. The work statement submitted to you earlier covers the documentation that will be provided with the computer programs. I have enclosed a copy of it for your convenience. If you have any questions, please don't hesitate to call. Sincerely, STATINTL Scientific & Engineering Applications WWM:mis encl. 0 Declassification Review by NGA/DoD Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 Attachment to Approved For Release 2005/02/10 : CIA-RDP78BO4747AO0110d' ( -084/68 STATINTL will provide technical assistance, as required, to establish operating procedures which will produce valid STATINTL output from the 1032T trichromatic microdensitomater. This work will include an investigation to determine proper location of filters. STATINTL 2. will provide information processing routines for automatic data reduction of the microdensitometer output. These routines will facilitate technical and intelligence analyses of single and multilayer emulsion films. The documentation furnished in support of these routines will include: a. Complete listing of the deck for each FORTRAN program. b. Documentation for each FORTRAN program consisting of: 1. Block diagram of the program showing the exact flow of this data and operation preformed on it. 2. Detailed description of all input data such as; range and number of data values; purpose, definition and values of all constants; settings on the NPIC Microdensitometer that are peculiar to the program. 3. Detailed description of all output data such as: range of values; what the cause could be if the values are out of range (assuming the program is in production status; what assumption and conclusion can be drawn from the output.) 4. Detailed description of all mathematical analysis methods in the program, equations and relevant diagrams. Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 TATINTL r.,.3 STATINTL will provide test targets and test routines for establishing the validity of any scan or series of scans made on the micro dons itometer. will provide technical assistance, as required, in the gen-' 4. oral areas of photoscience, electronic engineering, computer programming and optical analysis. TATINTL 5. will investigate the application of various lens combinations to reduce focus depth effects when scanning multi-layer emulsions with various wave length of light. TATINTL 6. 1will provide analytical and experimental support in the development of image analysis and image processing techniques unique to the exploita- tion field. Particular emphasis will be placed on the deduction of fundamental object properties, e. g. , brightness contours, from the recorded image. In those cases wherein the deduction of such data is not possible, the failure of physical description will be identified and recommendations made as to future courses of action. STATINTL $TATINTL 7. will provide monthly status reports on the work accomplished and the funds expended. These reports will be submitted within two weeks after the end of the reporting period. 8. will provide a final report on the work accomplished. The rough draft of this final report will be submitted thirty days before contract termin- ation date, and the final copies will be delivered to the customer thirty days after approval of rough draft. Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 Approved For Release 2005/02/10 CIA-RDP78BO4747AO01100020005-3 5. Desc~w,~~;:: -,,y option in the program and any 0 other uses the program might have. 6. Glossary of terms. c. Complete set of test data for each program including intermediate calculations and the output. Whenever possible all input data to any program will be combined on magnetic tape in the format generated by the microdensitometer. The only exception might be when input to one program is output of another. Approved For Release 2005/02/10 : CIA-RDP78BO4747A001100020005-3 Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 0 exposure principle cannot be used in the computation of color MTF. This task has five subtasks as follows: a. Completion of the characteristic matrix program b. Scalar array computation and regression fitting to generate the equations relating image color to scalar array c. Programming of the exposure table generator and exposure selection procedure d. Testing of the final color exposure generator e. Reporting and Documentation I COLOR EXPOSURE', TABLE GEL;ERA-OR This task is the completion of the effective exposure table selection and generation. Without this capability, the effective Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 0 0 Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 TASK 1 Executive Engineer Physicist Analyst Photoscientist Programmer Photographic Technician Technical Writer Publication Clerk Illustrator Engineering Overhead (100%) TOTAL MATERIAL Computer Charges Travel G&Aat9% HOURS 20 40 10 Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 STATINTL Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3 II COLOR GRAINJULARITY STUDIES This task compares the granularity of color materials with that of black and white materials on the basis of the mathematical characteristic. The investigation takes the form of examining the noise properties of color materials using three different techniques. The following sub-tasks are required: a. Record and sample preparation b. Study of classical gaussion properties as they relate to color materials.(Selwyn's law etc.) c. Binomial Distribution Studies d. Cross and auto correlation programs e. Reporting and Documentation Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3 Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 TASK 2 4 Executive Engineer Physicist Analyst Photoscientist Programmer Photographic Technician Technical, Writer publications Clerk Illustrator TOTAL Engineering Overhead (100%) 0 MATERIAL ' Computer Charges Travel G&Aat9% Prof it TOTAL HOURS 100 270 245 145 20 40 10 Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 STATINTL Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3 0 III COLOR MODULATION TRANSFER FUNCTION This phase initiates the study of the properties of MTF of color emulsions. Its objective is to provide a means for MTF generation and an analysis and interpretation of their value and meaning of such measurements in the color situation. The study will be composed of the following five sub-tasks: a. Color target generation b. Cooley-Tukey transform methods (edges, combs) c. Standard transforms (edges, combs) d. Analysis e. Reporting & Documentation Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3 Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 STATINTL TASK 3 Executive Engineer Physicist Analyst Photosc ientist Programmer Photographis Technician Technical Writer Publication Clerk Illustrator Engineering Overhead (100%) TOTAL Q Material Computer Charges Travel G&A at 9% HOURS 100 415 390 450 20 60 20 Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3 IV DIRECTION COSIN: C>> I_ BRATIO\ This task completes work rcc;uired to implement the calibration procedure established under previous efforts. The methods are well defined and all programming is completed and in operation. The following tasks remain to be accomplished to make this an operational procedure. a. Spectrophotometric work b. Direction Cosine c. Micro-D calibration d. ,Reporting and Documentation Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3 Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3 TASK 4 Executive Engineer Physicist Analyst Photoscientist Programmer Photographic Technician Technical Writer Publication Clerk Illustrator Engineering Overhead (100%) TOTAL Material Computer Charges Travel G&Aat9% 100 60 10 340 20 40 STATINTL Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3 Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 TASK 5 Executive Engineer Physicist Analyst Photoscicntist Programmer Photographic Technician Technical Writer Publications Clerk Illustrator Engineering Overhead (100%) TOTAL Material Computer Charges Travel G&Aat9%a HOURS 50 100 170 340 250 20 60 20 STATINTL Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 VI MICIO -ANALYZER OBJECTIVES ASSESSMENT been noted in the selection of objectives for the current color Discrepancies have micro-densitometer. Achromat objectives, designed for metallographic use are not suitable' for the precise location of focus of the micro- dons itometer with respect to the orientation of the layers of a classical color tripack. This program will evaluate the chromatic abberation and focus plane characteristics of current apo-chomat and planapo-chomat objectives. Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 STATINTL 0 TASK 6 Executive Engineer Physicist Analyst Photosc ientist Programmer Photographic Technician Technical Writer Publications Clerk Illustrator HOURS 0 Engineering Overhead (100%) TOTAL Material Computer Charges Travel G&Aat9% TOTAL 500 20 30 20 Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3 Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3 COMBINED TOTAL HOURS AND COST Executive Engineer Physicist Analyst Photoscientist Programmer Photographic Technician Technical Writer Publication Clerk Illustrator 0 Engineering Overhead (100%) TOTAL Material Computer Charges Tr ,vel G&A@9%. HOURS 400 250 400 1000 1165 1685 120 270 100 Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3 STATINTL