(UNTITLED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A001000060028-2
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
April 24, 2012
Sequence Number:
28
Case Number:
Publication Date:
November 1, 1963
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 75.93 KB |
Body:
CTOTINTI
Declassified in Part - Sanitized Copy Approved for Release 2012/04/24: CIA-RDP78B04747A001000060028-2
e
STATI NTL
STATI NTL
STATI NTL
STATI NTL
STATI NTL
STATI NTL
STATI NTL
STATI NTL
STATI NTL
STATI NTL
A review of the
1.
a.
b.
a. all work complete, no activity on this contract.
b. ^ holding the equipment pending shipping instructions.:
c. has 05122.95 on their books unbi led receivables.
3.
b. The services contract ran out Oct. 3G and 0
Thinks their man should continue
at March at least until the contract tests
Machine shipped to March AFB en of Sept. for
tests.
4.
5.
STATINTL
Head, Contrac s min.
contracts still on the status report.
T.O.1 Image thhanc er.
T.O.1 0 Dual Screen Projector. vb,
The machine ,,,,as shipped and installed las spring* STATINTL
= submitt ed a over run request last
June but no official word on it. They were
verbally told it was bein considered favorably,
and was up for review. [1 sent 4 follow up
letter 3 weeks ago.
HTA/5. STATINTL
Film Dryer A D/4. STATINTL
^' t incorporate
the changes which :z,c+rk :?n t'_'le iridicateci
W(33' "34 nece'J"4a;'J.
o1:1 oil i;'2 f:r. L r
Declassified in Part - Sanitized Copy Approved for Release 2012/04/24: CIA-RDP78B04747A001000060028-2
runThe will discuss thi4 with George#
of] called of Langley
said-he would extend contract if approved.
o r ~
j r +
~. Val !..7 .. C~?l ?~.
Declassified in Part - Sanitized Copy Approved for Release 2012/04/24: CIA-RDP78B04747A001000060028-2
STATINTL
STATINTL
6.
7.
? 0
Chemical Mix System. STATINTL
s and equipment packed ~nd waiting
overseas air schedule, due thisi week,,;
b. 0 field engineers and
ready also.
C. trying to arrange joint shipment
with 3 processors for going to STATINTL
same destination.
d. Since the total load is about 20,000 lbs.,
^ suggested it be loaded at L.A. rather
than San Francisco.
Installaticn of 2 HT4(3A and mix
a. All wor wt as completed a year a6o. This
was emergency work done during the Cuban
crisis, at NPIC Suitland,
b. The purchase order was issued a ter the
work was done, and paid,
c. Nothing outstanding, this contr ct is complete.
i
Declassified in Part - Sanitized Copy Approved for Release 2012/04/24: CIA-RDP78B04747A001000060028-2