(UNTITLED)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001000060028-2
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
April 24, 2012
Sequence Number: 
28
Case Number: 
Publication Date: 
November 1, 1963
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001000060028-2.pdf75.93 KB
Body: 
CTOTINTI Declassified in Part - Sanitized Copy Approved for Release 2012/04/24: CIA-RDP78B04747A001000060028-2 e STATI NTL STATI NTL STATI NTL STATI NTL STATI NTL STATI NTL STATI NTL STATI NTL STATI NTL STATI NTL A review of the 1. a. b. a. all work complete, no activity on this contract. b. ^ holding the equipment pending shipping instructions.: c. has 05122.95 on their books unbi led receivables. 3. b. The services contract ran out Oct. 3G and 0 Thinks their man should continue at March at least until the contract tests Machine shipped to March AFB en of Sept. for tests. 4. 5. STATINTL Head, Contrac s min. contracts still on the status report. T.O.1 Image thhanc er. T.O.1 0 Dual Screen Projector. vb, The machine ,,,,as shipped and installed las spring* STATINTL = submitt ed a over run request last June but no official word on it. They were verbally told it was bein considered favorably, and was up for review. [1 sent 4 follow up letter 3 weeks ago. HTA/5. STATINTL Film Dryer A D/4. STATINTL ^' t incorporate the changes which :z,c+rk :?n t'_'le iridicateci W(33' "34 nece'J"4a;'J. o1:1 oil i;'2 f:r. L r Declassified in Part - Sanitized Copy Approved for Release 2012/04/24: CIA-RDP78B04747A001000060028-2 runThe will discuss thi4 with George# of] called of Langley said-he would extend contract if approved. o r ~ j r + ~. Val !..7 .. C~?l ?~. Declassified in Part - Sanitized Copy Approved for Release 2012/04/24: CIA-RDP78B04747A001000060028-2 STATINTL STATINTL 6. 7. ? 0 Chemical Mix System. STATINTL s and equipment packed ~nd waiting overseas air schedule, due thisi week,,; b. 0 field engineers and ready also. C. trying to arrange joint shipment with 3 processors for going to STATINTL same destination. d. Since the total load is about 20,000 lbs., ^ suggested it be loaded at L.A. rather than San Francisco. Installaticn of 2 HT4(3A and mix a. All wor wt as completed a year a6o. This was emergency work done during the Cuban crisis, at NPIC Suitland, b. The purchase order was issued a ter the work was done, and paid, c. Nothing outstanding, this contr ct is complete. i Declassified in Part - Sanitized Copy Approved for Release 2012/04/24: CIA-RDP78B04747A001000060028-2