CONTRACT INSPECTION REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A000500220005-5
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
June 1, 2001
Sequence Number:
5
Case Number:
Publication Date:
September 9, 1965
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 81.55 KB |
Body:
^ SEC ET CONFIDENTIAL ', ^ UNCLASSI FI E )
lea9e-sau - ,. , 00 ND.
CONTRACT INSPECTION REPORT
DATE
TO:
b 196
ENGINEERING SECTION/CB/PD/OL
INSPECTION REPORT NO. (If final, so state)
1 --- -
ESTIMATED COMPLETION DATE
' V wie 1966 ---
NAME OF CONTRACTOR
TYPE OF COMMODITY OR SERVICE
ge.. ; 1,, Installation, services and Materials . Electrocolor Printer-procC3 3
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCAT D
THE CONTRACTOR IS ON SCHEDULE
FUNDS M YES ^ No IF ANSWER IS "NO" ADVISE REC
?
Y E 5 [j NO OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON
j
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF A
DITIONAL FUNDS INVOLVED.
PER CENT OF WORK COMPLETED
yy,,~,,,,~~yy x
PER CENT OF FUNDS EXPENDED (Es#i +ted)
FINAL REPORT, PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACIt
N INTERIM REPORT
.
HAS A
DURING THE PERIOD?, ^ YES ? No (If yes, give details on reverse side.)
ING THIS PERIOD? ^ YES ? e
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DUR
(If yes, indicate items, quantity, and cost on reverse side.)
INCENTIVES
IS THIS AN INCENTIVE CONTRACT 0 YES NO
NOTE:
USE REVERSE SIDE FOR COMMENTS.
IF YES. CHECK TYPE
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
^ COST PERFORMANCE DELIVERY
OVERALL PERFORMANCE OF CONTRACTOR
^ OUTSTANDING 3. ABOVE AVERAGE 5. a BELOW AVERAGE 7. ^ UNSATISFA( JRY
1
.
ELLENT 4. ^ AVERAGE 6. ^ BARELY ADEQUATE
2. ^ EXC
ADEQUATE, INDICATE REASONS ON
UNSATISFACTORY
IF OVERALL PERF
A
REVERSE SIDE. NIMA/RO
DECLASS
REVIEW
RECOMMENDED ACTION
CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING
Y PERFORMANCE
SATISFACTOR
OTHER (Specify)
^
El TERMINATE
ON IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE
EEN
IF TERMINATI
E AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE B
'
S PERFORMANC
FORM ON CONTRACTOR
RECEIVED. THESE INCLUDE, WHERE APPLICABLE, THE FOLLOWING:
DOE! NOT
ITEM
RECD
DOES NOT
ITEM
RECD
AP'LY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
,_.
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WJnAi; CONTRACTOR
1
~
11 ~?~?
l
yT
DIVISION
SIGNATU
{~~~ q~
P Gi n S
GNATURE
INSPECT
04747
FORM USE
1897 PREVIOUS
10-64 EDITION
^ UNC LASS I F I ED
01-
j CONFIDENTIAL
^ SECRET CONFIDENTIAL r ^ UNC LASS I F ED
Approved FV-AWjesA2Pffl$81(13 : CIA-RDP78
00500220005-5
INTERIM ^ FINAL
2, The "Col= ,Analyzer" is still in the "de-bugging" PhAse.
=hopes to be able to ship it in is few weeks. The l -.house
modifications to permit the use of pare,.tocuse4 mss: will be
made when the color Analyzer is installed.
o; ; r^wc.l For Riglaqsp '200110811 5 O220OO54 _
^ UNCLASSIFIED CONFIDENTIAL ^ SECRET