A RECOMMENDATION FOR THE LOCATION OF THE(Sanitized) DUAL STEREO COMPARATOR(Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A000200030106-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 12, 2002
Sequence Number: 
106
Case Number: 
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A000200030106-0.pdf233.41 KB
Body: 
Ap,~ovec~r Release ~~ :CIA-~78B~47A000200030106-0 SS/L-260-67 MEMORANDUM FOR Chief, Support Staff SUBJECT A Recommendation for the Location ofithe~ 1 A meeting was held December 4 to discuss the rid cons and make recommendations for the location of the ual 25X1 25X1A 2 5X1A 25X1A ogis ics ch. 25X1A RECD OL ? and 25X1 A chaired the meeting. 25X1A 2. opened the meeting by stating that a decision 2 5X1A had to be reached as to whether the dual comparator could or could 2 5X1A not be located in the old clean lab of TID on the second floor, if 2 5X1A not why not and which alternate location in the building would meet 2 5X1A the site requirements for the installata~on. This openin statement was based on the latest information available from the ~ 2 5X1A Company and our consultant engineer regarding the instrument as to size dimension), total weight, vibrations contained ~ 2 5X1 the length of time for site preparations, operational 2 5X1A down time to the remaining portion of the TID operation during the construction, construction of site preparations on the second floor, and thh low weight capacity of the elevators 2 5X1A which prohibits the raising of excessive weights to upper oor levels. stated a rumor that- more than one instrument 2 5X1A 3' 25X1 A may be instal e. was originated by himself on the probability that DIA may wis to procure such an instrument to be housed in the building, and that he could not foresee NPIC procuring more than one instrument for their own use within the 2 5X1A next four to five years. 25X1 . TID stated that they ha met with rior o t it was is wire that the h d instrument "" " " a t attending this meeting an Declass Review by NIMA/DOD 25X1 4 Approved For Release 200 g I L. 68011' i dowaG~~~ A000200030106-0 declassltlcatlon __-_ A~pr-oveeF~ror Release 2 !2~ :CIA-I~,p786Q~47A000200030106-0 be placed on the first floor due to the heavy w i?ht 28,000 lbs.) of the instrument, w is according to made the floor loading capacity on the second floor margina stated that it would be desirous at the first floor level o prepare a site for part or all of the remaining mensuration equipment presently housed in the TID area, second floor. 5, 0 discussed at great lengths the difficulties that would be encountered in a site preparation for this instrument on the second floor. Again, the weight factor was a major problem. A vibration t s was recentl conducted in this area and the results turned over for analysis. Their findings have dictated that a three oot hi h false floor would be 0 or he e i ment. no er reason or no p .acing is equip en on t e sewn. oor would be that approxmately~400 square feet of floor space would be lost to operational use in that. this amount of space is required to house air handler and environmenfi~al equipment necessary for the operation of the instrument (This equipment will still be required on the first floor location, but in this area it can be located 6. imated the cost of a site preparation on the second floor Off the record he stated (this is an assumption) t at a first lour location could probably save the Center 0 by a substantial reduction in the size, design, and fabrication of vibration dampers and in the actual site preparation. This statement was based on his belief that the existing floor slab could be breached and piling be driven into the packed clay underneath the first floor flab to be used as footing for the pads of the instrument. This would isoT.ate the equipment from any building vibration. Prior to verifying this statement new vibration tests will have to be conducted on t~ first floor. 7. An open discussion doncerning the Centers operation of the remaining portion of the old TID clean room during construction phase (estimated five months or more) revealed that NPIC cannot afford to be without the services of the mensuration equipment for any period of time, therefore, this statement alone should negate 25X1A' 25X1A Approved For Release 200'~"IA-RDP78B04747A000200030106-0 9p~prove~or Release 2 CIA-$~P78B6~747A000200030106-0 the installation of this equipment on the second. floor. ' g. The question was asked, why were we so long in realizing that this i ment if installed on the second floor wauld present a proble ? stated that the first phase of the present contract was a design phase and until vibration tests of the area on the second floor were made and analyzed there was no way of knowing what problems would be encounthase to tthefcontract instrument design: The first phase (design p ) f' rst art of January 1968 25X1 A is due for completion the 1 p ment must e uip f e q also stated that the location for this piece o order date bl k e s e decided upon at the earliest possi ta the overrun ar t tho d wi that the final design may be reache er cent of the personnel o Tact. In addition he stated hale of our i a n des the in are eng g g p to our inability t d l u ue of some instrument. i is lost services the 25X1q locate a site for this Their services may be personnel will be lost ent depending on the 25X1 A required for some redesign phase o e very h t m location chosen. He further stated that t design a~ameters of h e p complex instrument and that to change t would be quite costly. g. As a result of this meeting, the following recommendations were made: a. It was the unamimous consensus of those present t at the gymnasium be chos as the site for the dual comparator. that will meet This is the only area t accessa ihty, the isolation 2 5X1A re uirements or ceiling. eig , of support environmental equipment with a minimum effort of demolition, rerouting of duct work, and a minimum dollar value, and still afford no disruption to the operations of TID during site preparations. b. It was recommendd.d that consideration be given to preparing space adjacent to the dual comparator on the first floor and move part or all of the mensuratian equipment of TID to that location. This suggestedfordin la clea ere and mensuration capabilities for NPIC by g secondly, more stable environment for equipment operation; this move would free space for the expansion of the com uter oper~on w is presently is marginal of or a itional equipment and environmental conditions necessary for their successful operation. Approved For Release 2002/08 P78B04747A000200030106-0 Apved Fps Release. x/08/28 : CIA-Rf~8B07A000200030106-0 Zp. For those reasons stated herein, I endorse the recommendations contained in paragraphs 9 a and b above. 25X1A Approved For Release 2002/08~~{~DP78B04747A000200030106-0 Approved F OUT CHIEF/SUPPORT STAFF r~ DEP Q-I/SUPPORT STAFF c/RAC 6N222 ~iP~8B04747 INITIALS ~~ 6N222 C/TRAINING 6N217 COOP 6N217 C/RECDS tit(~T 5S468 ._ ___,....T.?~ ~4fiA Approl d For Release 2002/08/28 :CIA-RDP78B04747A00020 i Approved For Release 2002/08/28 :CIA-RDP78B04747A000200030106-0 Approved For Release 2002/08/28 :CIA-RDP78B04747A000200030106-0