TASK ORDER NO. 1 CONTRACT NO. (SANITIZED)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A000100070009-1
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
September 7, 2007
Sequence Number: 
9
Case Number: 
Publication Date: 
May 29, 1962
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A000100070009-1.pdf224.09 KB
Body: 
Approved For Release 2007/09/07: CIA-RDP78B04747A000100070009-1 Declass Review, 29 May 1962 Please Reference: Central intelligence ncy 2430 E Street, N N. W W. Washir ton 25, D. C. Attention: Subject: References: Contracting Officer Task Order No. 1 a ea t1eu* lens has cone Pursuant to the requirements of the subject ContMCt, the Contractor pleted an analysis of pedorvlasnaae under Task Ordet No. I and computad esti- mates to complete. This analysis indicates that completion of performance, .xo1usive of fixed fee, will require funds in addition to those presently co3n- nu tted under this Task Order. Several factors have contributed to this t0quim' meent for additional additional funding Of prime significance to the application of a germael and administraiiv+s ate which has a eedad the a etad rtae Approved For Release 2007/09/07: CIA-RDP78B04747A000100070009-1 Approved For Release 2007/09/07: CIA-RDP78BO4747A000100070009-1 Central Intelligence Agency 2 included in the referenced -posals by the Contractor. Similarly, anticipated memorable Manufacturing and Engineering overhead rates have exooeded the bid rates. The combination of theme factors amounts to approximately which represents the major portion of We request for additional funding. The percentage rates which we anticipate recovering are explicitly defined in Enclosure 1. ? In addition, the following factors contribute to this requirement for additional funding s A. our estimates indicate manufacturing direct labor dollars will exceed the original bids by approximately additional expenditures were required as a result of mechanical problems encountered in the scanner and rotating mirror modulated light source as well as redesign and modification which were necessary. In addition, during the performance of this program it became apparent that the precision and tolerances required to fabricate portions of the image enhancement equipment dictated the use of Manufacturing Department facilities and caps- bilities in lieu of the use exclusively of model shop personnel and techniques as we had originally planned. This change in the philosophy of performance contributed to the necessity for addi- tional Manufacturing direct labor dollars. 25X1 Direct material costs are estimated to exceed the original bids by approximately This additional expenditure was required for the replacement ed in of the equipment which are discussof the mechanical c hani erttael Portions the sous paragraph. 25X1 The net effect of the above factors has resulted in a requirement for an addi- tional A Cost Analysis of actual costs Incurred during the Con- tractor's fiscal years 1960, 1961, and through 1 Apr 1962, as they relate to the estimates utilized as a basis for contracting and a rooonci istion by cost element, Is forwarded he with. as Enclosure 1 for your review. The above dollar amount is determined, in part, by the application of over- hood and general and administrative rates based upon costs recorded in our books of account. The percentage rates reflected for our :fiscal year 1960 are those which have been negotiated and determined by final audit with the Approved For Release 2007/09/07: CIA-RDP78BO4747A000100070009-1 Approved For Release 2007/09/07: CIA-RDP78B04747A000100070009-1 Central Intelligence Agency 3 25X1 29 May 1962 cognisant auditor for the Department of Defense and have been applied in settlement of all L)epartment of Defense contracts for p with g of that Period ? The contractor is presently participating Defense auditors in the negotiation and determination of final overhead and general and administrative rates reimbursement type contracts with theral for reimbursement of all cost ra Depart- ment of Defense for that period. The Percentage rates which are reflected in Enclosure I for our fiscal years 1961 and 1962, represent the Contractor's estimate of anticipated recoverable indirect costs based upon our records and books of account. The delivery schedule as defined in Supplement No. 3 to the subject Task Order remains unchanged. (i.e., Completion date for the performance of work under this Task Order is 15 August 1962.) It, is requested that an appropriate contractual amendment be issued against ide for en adjusted Task Order No. 1 to the subject Contract to Prov fiy th i e n no change estimated cost of regate total cost plus fixed fee of an a i gg n resulting event additional information may be required, please contact director of contracts, at Very truly yours, 25X1 25X1 GEirib Enclosure I - Cost Analysis Approved For Release 2007/09/07: CIA-RDP78B04747A000100070009-1 75X1 75X1 25X1"~~~ Approved For Release 2007/09/07: CIA-RDP78BO4747A000100070009-1 Next 4 Page(s) In Document Denied Approved For Release 2007/09/07: CIA-RDP78BO4747A000100070009-1 Approved For Release 2007/09/07: CIA-RDP78BO4747A000100070009-1 30 April 1962 eare qp iw ~r to + the Visit a~ # A ')IT ! .*-u to the k t notion .31=e of the 0 ci ati largely r ux!` - t -baeac. circuit' has been t rn ter *1s which ea O this iastrmmt is Pv6mmed to be c o m - e a t w h i c h t. a the vsriou e is *ill be fiwti test and evaluation conducted. Dur pia d MM Wtput *terials Viii be it to this office it , Approved For Release 2007/09/07: CIA-RDP78BO4747A000100070009-1