CONTINUING ACTIVITY AT THE SHUANG-CHENG-TZU MISSILE TEST CENTER, CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04560A001100010068-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
June 22, 1999
Sequence Number:
68
Case Number:
Publication Date:
April 1, 1963
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP78B04560A001100010068-2.pdf | 112.07 KB |
Body:
Approved For Release 2000/04/VECfiJA-RDP78B04560A001100010068-2
SHUANG-CHENG-TZU MISSILE TEST CENTER,
NPIC/R-1220/63
April 1963
PHOTOGRAPHIC INTERPRETATION REPORT
CONTINUING ACTIVITY AT THE
CHINA
NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
CIA-RDP78BO456OA0011 Q.OO10 68-2
e,., p.ad~?~ eye d.do.nR
Approved For Release 2000/04/ffCPLTI5-DP78B04560A001100010068-2
NO FOREIGN D
NPIC /R- 1220/63
CONTINUING ACTIVITY
AT THE
SHUANG-CHENG-TZU MISSILE TEST CENTER, CHINA
25X1 C
25X1 C
Further analysis of reveals that
all significant components of the Shuang-cheng-tzu issi a Test Center
(SCTMTC) located at 41-05N 100-15E and the large associated airfield
can be observed and that no new major facilities can be identified, al-
though::.obliquity? and small scale preclude a detailed analysis. Of
significance are indications of continued activity at the SCTMTC since
25X1 C
Two features are visible that were not present in At
Launch Complex A, heavy track activity is evident between the launch
area and a point 3 to 4 nautical miles due west, or in a downrange
direction from the complex. Extreme obliquity and small scale pre-
clude determination of the nature of the scarring at the terminus. Also
present is a large ground marker consisting of a cross and four corner
ticks located in the approximate center of the large "L" instrumentation
pattern. This "L" instrumentation pattern is associated with airfield
activity. 25X1 C
The rail spur, identified on which
extends southeast from the support base and terminates just short of
the sand dunes, has not been continued beyond the point where it ended
25X1C in At the terminus are a turning wye, several sidings,
two branches that curve back toward the support base, and several
buildings. The northern curved branch was present in but25X1 C
the southern curved branch has been added since that time. Several
strings of rail cars are visible along the spur, indicating continued
activity of an undetermined nature.
SECRET
Approved For Release 2000/04&17opQ IA 78B04560A001100010068-2
Approved For Release 2000/04/17 : CIA-RDP78BO456OA001100010068-2
25X1 C
Approved For Release 2000/04/17 : CIA-RDP78BO456OA001100010068-2