AT THE REQUEST OF(SANITIZED) A SPECIAL RAPIDLY PRODUCED UNTITLED

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04558A001900140001-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
1
Document Creation Date: 
December 28, 2016
Document Release Date: 
April 28, 2008
Sequence Number: 
1
Case Number: 
Publication Date: 
December 16, 1966
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP78B04558A001900140001-6.pdf69.35 KB
Body: 
Approved For Release 2008/04/28: CIA-RDP78BO4558AO01900140001-6 0UT606-9 T 0 P S E C R E I 1164 74 3Z 9343 X66 DEC 16 17 5%Z DE.(, V2_ 5X1 'PLC 1966-, 25X1 .. AT THE REQUEST O A SPEC IAL RAPIDLY PRODUCED UNTITLED "?;---'25X1 DUPLICATE OF MISSION 4035 WAS PRODUCED TO PROVIDE SPECIAL INFORMAT.LtL0 t REQUIRED BY THEF--]STAFF. TDff -,OWING INFORMATION IS PROVIDED- -25X1 ACCORDINGLY -t A. CONSTRUCTION AT THE MOSKVA PROBABLE ABM FACILITIES CE05, E24, E31, E33 AND THE DOGHOUSE) OBSERVED ON THIS FAIR-TO- 000D INTERPRETABLE PHOTOGRAPHY IS CONSIDERED TO BE AT A NORMAL PACL_. I ,"" BASED ON OBSERVATION OF THESE FACILITIES OVER A FOUR YEAR PERIOD.---J SUCH CHANGES AS ARE OBSERVED DO NOT APPEAR TO REPRESENT ANY UNUSUAL -_ ' i DEGREE OF PROGRESS AT THE FACILITIES IN RECENT MONTHS. B. PHOTOGRAPHY OF GOOD INTERPRETABILITY OF THE SARY SHAGAN MISSILE TEST CENTER, REVEALS THAT CONSTRUCTION CONTINUES ON GALOSH NO NEW FACILITIES OR NEW CONSTRUCTION HOWEVER LAUNCH POSITION C-3 , . STARTS NOTED THROUGHOUT THE COMPLEX. THE CONSTRUCTION ACTIVITY AT C-3 IS A RESUMPTION OF "INCOMPLETE" CONSTRUCTION. IN BRIEF, THE LAUNCH POSITIONS ARE NOW BEING EMPLACED AT C-2 AND C-3 WERE BEGUN IN SUMMER 1962, AND REMAINED DORMANT UNTIL 1966 RESUMPTION OF ACTIVITY. THE TRIAD FACILITY AT COMPLEX B IS COMPLETE AND NO CHANGES HAVE OCCURRED SINCE MID-1966 WHEN THE LARGE CRANE WAS REPORTED REMOVED FROM ITS LOCATION BEHIND THE LARGE BUILDING. T 0 P S E C R E T -- END OF MESSAGE -- Approved For Release 2008/04/28: CIA-RDP78BO4558AO01900140001-6