CABE TO DIRNSA FROM NPIC

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04558A001600020007-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 10, 2008
Sequence Number: 
7
Case Number: 
Publication Date: 
October 7, 1966
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP78B04558A001600020007-6.pdf90.73 KB
Body: 
Approved For Release 2008/03/10: CIA-RDP78BO4558AO01600020007-6 t 25X1 0UT60043 CNO P 072322Z FM NPIC TO DIRNSA 1966 ?CT 7 23 44Z 1 0 ;1 CT 1966 OPCEN STATE /R C I CINCLANTFLT CINCPACFLT CINCUSNAVEUR CINCLANT CINCPAC LANTINTCEN FICPAC COMNAVFORJAPAN COMSECONDFLT YDHAVQC /CI NCEUR YSHKLRC/USARPAC AFSSO PACAF AFSSO ACIC AFSSO FTD AFSSO AFSC AFSSO BSD AFSSO ESD AFSSO SSD AFSSO USAF AFSSO USAFE INFO FICEUR ZEM T 0 P S E C R E T RE USAFE 1X-0219/66 NOTAL Advance copy CITE NPIC 8706. L. - -- Approved For Release 2008/03/10: CIA-RDP78BO4558AO01600020007-6 Approved For Release 2008/03/10: CIA-RDP78BO4558AO01600020007-6 NPIC CONFIRMS THE IDENTIFICATION OF A PROBABLE LONG RANGE SAM LAUNCH COMPLEX UNDER CONSTRUCTION NEAR VOLGOGRAD, USSR. NPIC COORDINATES OBTAINED FROM USATC - SERIES 200, SHEET 0235- 21HL, 4TH EDITION MARCH 1964 PLACE THE COMPLEX AT 48-22NO44-19E, 22.5 NM SSW OF VOLGOGRAD. THIS COMPLEX CONSISTS OF THREE LAUNCH SITES, DESIGNATED A, B, & C, A TRACKING/GUIDANCE FACILITY, A SUPPORT AREA AND A PROBABLE MISSILE ASSEMBLY/CHECKOUT FACILITY. EACH LAUNCH SITE IS COMPOSED OF SIX LAUNCH POSITIONS AND A CONTROL CENTER. LAUNCH SITES A AND C HAVE WEDGE-SHAPED DRIVE-THROUGH LAUNCH POSITIONS. SITE B CONSISTS OF RECTANGULAR, DRIVE-THROUGH LAUNCH POSITIONS. THE CONTROL CENTERS AT B AND C APPARENTLY CONSIST OF FOUR PARALLEL REVETMENT WALLS. SITE A CONTROL CENTER APPEARS TO BE OF A SLIGHTLY DIFFERENT BUT UNDETERMINABLE DESIGN. THr AZIMUTH OF A LINE FROM THE TRACKING/GUIDANCE FACILITY CENTRAL CONTROL THROUGH SITE B CONTROL CENTER IS 150 DEGREES. THE TRACKING/GUIDANCE FACILITY IS COMPOSED OF THREE RADAR POSITIONS IN VARYING STAGES OF CONSTRUCTION AND A CENTRAL CONTROL. THE SUPPORT AREA CONSISTS OF APPROXIMATELY SIX BUILDINGS. A PROBABLE MISSILE ASSEMBLY/CHECKOUT FACILITY IS UNDER CONSTRUCTION ADJACENT TO THE NORTH SIDE OF THE SUPPORT AREA. A PROBABLE EARLY WARNING RADAR SITE IS UNDER CONSTRUCTION 2.5 NM NW OF THE COMPLEX. 1 Approved For Release 2008/03/10: CIA-RDP78BO4558AO01600020007-6 Approved For Release 2008/03/10: CIA-RDP78BO4558AO01600020007-6 0 GP-1 USATC - SERIES 200, SHEET 0235-211-HL, 4TH -EDITION MARCH 1964 -END OF MESSAGE- - Approved For Release 2008/03/10: CIA-RDP78BO4558AO01600020007-6