CABLE TO AIG NINE SEVEN SIX FROM NPIC WASH DC

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04558A001300030132-9
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 13, 2008
Sequence Number: 
132
Case Number: 
Publication Date: 
July 7, 1966
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP78B04558A001300030132-9.pdf84.38 KB
Body: 
Approved For Release 2008/03/13: CIA-RDP78B04558A001300030132-9 P 07O0'3Z FM NPIC WASH DC TO AIG NINE SEVEN SIX RUEKDA/DIA PRODCEN RUEKDA/NI C BT C 0 N F I D E N T I A CITE NPIC 7691. 0UT59028 25X1 REF A: NPIC CITE 7659 DTG 030204Z JUL 66 REF B: NPIC CITE 7544, DTG 212237Z JUN 66 CONTINUING SCAN BY NPIC OF MISSION BLUE SPRINGS 5520 7 JUL 1956 OF 2 JULY 1966 REVEALS THE FOLLOWING INFORMATION ON THE HA NOI- PING HSIANG RAIL LINE: 1. THE RAIL BY-PASS U/C (REF A) AROUND THE BAC GIANG RAIL BRIDGE AT 2116N 10600E HAS BEEN CONSTRUCTED USING STANDARD GAUGE TIES WITH METER GAUGE TRACK. THIS TYPE ACTIVITY WAS FIRST OBSERVED 4.5 NM NE OF KEP AT 2126N 10621E -7 I- File 'r' -25X1 SCC BR__ I P'LLS ~--- IPO PD _ PSD I PSD-ics25X1._ IT IMMEDIATELY PRECEEDED THE ADDITION OF A THIRD RAIL, ALLOWING UTILIZATION OF THE LINE BY BOTH METER AND STANDARD GAUGE RAIL CARS. THE CONSTRUCTION OF A BY-PASS AROUND THE BAC GIANG RAIL BRIDGE WAS PRECIPITATED BY AIR STRIKES IN 196 . 'taD L Approved For Release 2008/03/13: CIA-RDP78B04558A001300030132-9 Approved For Release 2008/03/13: CIA-RDP78B04558A001300030132-9 APRIL 1966 AND THE BY-PASS RAIL BED HAS`BEEN CONSTRUCTED TO ACCOMODATE FUTURE EXTENSION OF DUAL G"UGE TRACK SOUTH FROM KEP. INITIAL CONSTRUCTION OF THE BY-PASS RAIL BED WAS EVIDENT NUMEROUS STANDARD GAUGE TIES ARE STACKED ADJACENT TO THE RAIL LINE AT 2116N 10610E (UTM'S XJ221528, XJ218528, AND XJ217528).. PROBABLE RAILS ARE ALSO OBSERVED PILED ADJACENT TO THE RAIL LINE IN THIS AREA. THERE IS NO EVIDENCE OF EMPLACED STANDARD GAUGE TIES SW OF BAC GIANG AT 2113N 10605E. (BB) 2. TWO HALF-THRU TRUSS BRIDGE SECTIONS ARE LOCATED ON THE NORTH SIDE OF THE BAC GIANG RAIL YARD AT 2116N 10611E (UTM XJ 242532). (BB) 3. A RAIL BY-PASS U/C AROUND THE DAP CAU RAIL BRIDGE EXTENDS FROM 2112N 10605E (UTM XJ138454), TO A BRIDGE U/C CONSISTING OF 8 WOODEN PILING-PIERS AT 2112N 10605E (UTM XJ132456), THEN TO 2111N 10605E (UTM XJ128438) WHERE IT REJOINS THE HA NOI-PING HSIANG RAIL LINE. THE RAIL BED IS IN LATE STAGES OF CONSTRUCTION, HOWEVER NO TIES OR TRACK HAVE BEEN LAID. MAP REF: AMS SERIES L701 SHEET 62741V USATC SERIES 200 SHEET 0616-19HL. GP-1 C O N F I D E N T I A LJ 25X1 25X1 Approved For Release 2008/03/13: CIA-RDP78B04558A001300030132-9