MISSION 1029 PHOTOGRAPHIC EVALUATION INTERIM REPORT (PEIR)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04558A001200020012-4
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 26, 2008
Sequence Number: 
12
Case Number: 
Publication Date: 
February 25, 1966
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP78B04558A001200020012-4.pdf224.94 KB
Body: 
Approved For Release 2008/03/26: CIA-RDP78BO4558AO01200020012-4 T 0 P S E C R E T 252242Z REPORT (PEIR) SUBJ: MISSION 1029 PHOTOGRAPHIC EVALUATION INTERIM REF A B NUMERICAL SUMMARY MSN NO AND DATES: 1029-1, 2-7 FEBRUARY 1966 1029-2, 7-12 FEBRUARY 1966 LAUNCH DATE AND TIME: 2 FEBRUARY 1966/2132Z VEHICLE NUMBER: 1623 CAMERA SYSTEM: J-27 PAN CAMERA NOS: FWD LOOKING (MASTER) 178 AFT LOOKING (SLAVE) 179 S/I CAMERA NOS: MSN 1029-1, D79/94/91 RECOVERY REVS: 2. CAMERA FWD LOOKING AFT LOOKING MSN 1029-2, D76/70/94 D81 AND D160 SETTINGS 0.275 INCH SLIT WRATTEN 25 FILTER 0.175 INCH SLIT WRATTEN 21 FILTER CN T ?83 z 1%66 FEB 2 8 FEB 1966 iCyNo. of" _F i CJ j---S--2c c E r POD DI AX Y_4_,- SPAD__ I NSA?L" 3. PERFORMANCE SUMMARY TOP S Rfl wrgt,0=gig and Qt~?srss':; eat i.:~ Approved For Release 2008/03/26: CIA-RDP78BO4558AO01200020012-4 Approved For Release 2008/03/26: CIA-RDP78BO4558AO01200020012-4 0 0 THE OVERALL IMAGE QUALITY OF T:-:MISSION WAS CONSIDERED SOMEWHAT LESS THAN RECENT MISSIONS. HOW'EVER, SOME TARGET AREAS WERE DESCRIBED BY THE PI'S AS BEING BETTER THAN MISSION 1028. THE REDUCTION IN OVERALL QUALITY IS ATTRIBUTED TO BLOWING SNOW9 ATMOSPHERIC HAZE AND CLOUDS. NO PORTABLE CORN TARGETS WERE RECORDED BECAUSE OF CLOUD COVER. 4. ANOMALIES - PANORMIC CAMERAS ANOMALIES, INCLUDING THOSE REPORTED IN THE MESSAGES (REF A AND B), WERE REVIEWED: A. LIGHT LEAKS CAUSE: LIGHT LEAKS WERE TRACED TO (1) THE PAN CAMERA DRUM FELT SEAL AND (2) THE -1 ABLATIVE SHELL. ACTION: (1) INVESTIGATION OF SUPPLEMENTARY DRUM FELT SEALS IS IN PROCESS. (2) A FILM CHUTE HAS BEEN DESIGNED FOR THE -1 ABLATIVE SHELL AREA AND WILL BE INCORPORA- TED IN J-30 NOW SCHEDULED AS MISSION 1031. B. INTERMITTENT HORIZON CAMERA FIDUCIALS, DATA BLOCK INDEX LAMPS AND SERIAL NUMER IN THE FWD CAMERA. CAUSE: A REVIEW OF THE FORWARD CAMERA DP'S INDICATED THAT THE 200 CYCLE TIMING PIPS WERE FLUCTUATING SLIGHTLY WITH THE OTHER LAMPS. THERE WERE NO RELATED FLUCTUATIONS NOTED ON THE AFT CAMERA LAMPS. SINCE THE ONLY COMMON FEATURE TO ALL THE ABOVE LAMPS IS REGULATED POWER, IT IS SUSPECTED THAT THERE WAS A POOR CONNECTION INTERNAL TO THE FORWARD CAMERA. ACTION: IMPLEMENTATION OF SHORTER INTERCONNECTING Approved For Release 2008/03/26: CIA-RDP78BO4558AO01200020012-4 Approved For Release 2008/03/26: CIA-RDP78BO4558AO01200020012-4 ? S CABLES FOR THE PAD SYSTEMS RUN AND THERMAL-jLTITUDE CHAMBER WILL ALLOW MORE MEANINGFUL LAMP CHECKS PRIOR TO FLIGHT. BOTH ACTIONS ARE CURRENTLY BEING TAKEN UNDER IMPLEMENTATION OF THE "FACTORY TO PAD" PHILOSOPHY. NO FURTHER ACTION IS PLANNED, Co DENDRITIC STATIC CAUSEt EXTENSIVE STATIC DISCHARGE WAS OBSERVED DURING PRE-SPLICING AND PRE-PROCESSING PHASES PROBABLY MOST, IF NOT ALL, OF THE DENDRITIC EDGE STATIC MARKING OCCURRED AT THESE OPERATIONS. PRECAUTIONS NORMALLY USED TO PREVENT STATIC DIS- CHARGES WERE NOT EFFECTIVE WITH THIS MISSION. ACTION: INVESTIGATE SUPPLEMENTAL TECHNIQUES TO PRECLUDE THE STATIC DISCHARGE DURING UNWINDING. D. VEILED HORIZON IMAGERY AND SOFT APPEARING FOCUS CAUSE: SOME EXTERNAL SUBSTANCE OR PHENOMENA VEILS THE H.O. IMAGES. THIS STARBOARD VEILING NORMALLY STOPS DURING THE FIRST MISSION, THE AFT CAMERA N.O. WAS GOOD THROUGH PASS D81 AND PROGRESSIVELY DEGRADED FOR THE BALANCE OF THE FLIGHT. ACTION: INVESTIGATE PARTICLES EXTERNAL TO THE VEHICLE. E. FILM CREASE CAUSEt IT WAS NOT POSSIBLE TO ADEQUATELY EVALUATE THE MARKING ON THE DUPLICATE POSITIVE. ACTION: EXAMINE THE ORIGINAL NEGATIVE WHEN AVAILABLE. Approved For Release 2008/03/26: CIA-RDP78BO4558AO01200020012-4 Approved For Release 2008/03/26: CIA-RDP78BO4558AO01200020012-4 ? 0 4- F. R*BED FORMAT EDGE CAUSE: AN INSTRUMENT WILL OCCASIONALLY EXHIBIT AN EXCESSIVE AMOUNT OF EMULSION PARTICLE BUILD-UP, EITHER DUE TO A LOCALIZED PITTED OR ROUGHENED AREA AND/OR AN OVERALL RAIL MICRO- ROUGHNESS. ACTION: THERE IS NO ANTICIPATED CHANGE IN THE RAIL PRODUCTION MANUFACTURE FINISHING TECHNIQUES UNTIL J-38 AND UP, AT WHICH TIME ALL RAILS WILL BE POLISHED AND BUFFED. THIS TECH- NIQUE SHOULD ESSENTIALLY LESSEN RAIL SCRATCHING AND EMULSION BUILDUP PROBLEMS. NO FURTHER ACTION. 5. ANOMALIES - STELLAR/INDEX CAMERAS A. FOREIGN PARTICLES IN MISSION 1029-1 STELLAR PHOTOGRAPHY: CAUSE: INVESTIGATION HAS SHOWN THAT THE PARTICLES APPEAR TO BE VEHICLE ORIENTED. INVESTIGATIONS AT BIRD HAVE NOT SUB- STANTIATED THAT THESE ARE VENTED FUEL PARTICLES. ACTION: CONTINUING INVESTIGATION TO ATTEMPT TO ASCERTAIN THE SOURCE OF THE FOREIGN PARTICLES. B. ABNORMAL STELLAR IMAGERY - MISSION 1029-1 CAUSE: THE STELLAR CAMERA SHUTTER EXPOSURE TIME EXCEEDED TWO SECONDS ON 56 FRAMES OUT OF 419. AT TIMES THE SHUTTER DID NOT CLOSE UNTIL AFTER THE PLATEN WAS RAISED. HOWEVER, THE AVAIL- ABLE STELLAR IMAGERY DID PERMIT ATTITUDE DETERMINATION WITH SOME- WHAT MORE THAN NOMINAL EFFORT. ACTION: (1) CONTINUING EVALUATION OF STELLAR CAMERA SHUTTER DESIGN, MANUFACTURE, ASSEMBLY AND TESTING TO PRECLUDE 1 Approved For Release 2008/03/26: CIA-RDP78BO4558AO01200020012-4 Approved For Release 2008/03/26: CIA-RDP78BO4558AO01200020012-4 0 . FUTURE OCCURRENCE OF THIS PROBLEM. (2) THE POSSIBILITY OF DECREASING EXPOSURE IN THE STELLAR PHOTOGRAPHY TO REDUCE SMEARED IMAGERY IS UNDER INVESTIGATION. Co S/I CAMERA FAILURE - MISSION 1029.2 CAUSE: DELAY IN OPERATION OF RELAY K702 UNTIL PASS D134. AFTER PASS D134 OPERATION WAS NORMAL. ACTION: INVESTIGATE COMPONENT FAILURE HISTORY AND ASSO- CIATED EQUIPMENT CIRCUITRY. D. IMAGED INDEX RESEAU EDGE - MISSION 1029-1 CAUSE: INSUFFICIENT MASKING OF THE INDEX CAMERA RESEAU PLATE RESULTED IN A MINOR RESEAU EDGE EXPOSURE IN APPROXIMATELY SIX ADJACENT FRAMES. ACTION: EXAMINE PROCEDURES AT BOSTON TO ASSURE ADEQUATE TESTING AND EVALUATION. 6. REPORT ON PREVIOUSLY ASSIGNED ACTION ITEMS A SUMMARY OF ALL ACTION ITEMS ESTABLISHED AT THE PEIR MEET- INGS, FROM MISSION 1024, HAS BEEN PREPARED AT A/P. THE PEIR MEMBERS REVIEWED AND CONCURRED WITH THE FORMAT AND CONTENT OF THE SUMMARY. THE SUMMARY WILL BE PUBLISHED AND DISTRIBUTED AT THE NEXT PEIR MEETING. THE DISPOSITION OF ACTION ITEMS WILL BE CARRIED IN THE SUMMARY AND NOT IN THE PEIR MESSAGE. 7. REMARKS THERE ARE CERTAIN CHARACTERISTIC ANOMALIES THAT ARE CON- SIDERED INHERENT TO THE OPERATION OF THE CORONA SYSTEM. WHILE THESE ITEMS WARRANT ATTENTION TO PREVENT FURTHER DEGRADATION IT IS 1 Approved For Release 2008/03/26: CIA-RDP78BO4558AO01200020012-4 Approved For Release 2008/03/26: CIA-RDP78B04558A001200020012-4 ? ? NOT FELT THAT SPECIFIC ACTION ITEMS SHOULD BE ASSIGNED. A SUMMARY OF THESE ITEMS AND THE DEGREE OF DEGRADATION IS PRESENTED BELOW. ANOMALY FWD CAMERA AFT CAMERA 1. SCRATCHES IN LESS THAN NORMAL LESS THAN NORMAL FORMAT 2. RAIL SCRATCHES NORMAL NORMAL 3. LIGHT LEAKS NORMAL; SEE 4-A NORMAL; SEE 4-A 4. MINUS DENSITY LESS THAN NORMAL LESS THAN NORMAL STREAKS T 0 P S E C R E T --END OF MESSAGE-- 1 Approved For Release 2008/03/26: CIA-RDP78B04558A001200020012-4