CABLE TO AFSSO USAF FROM OPCEN

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04558A001100120032-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 11, 2007
Sequence Number: 
32
Case Number: 
Publication Date: 
December 16, 1964
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP78B04558A001100120032-2.pdf41.17 KB
Body: 
Approved For Release 2007/12/11 : CIA-RDP78BO4558AO01100120032-2 P 162320Z FM OPCEN SA F VIRRSR CN 0 USAFSS ZEM S E C R E T lwo:5,~ 0.1i THE FQ.LOWING IS FROM THE CIA/ PHOTOGRAPHIC INTELLIGENCE DIVISION. CITE CIA-P-025. 1. FURTHER ANALYSIS OF=PHOTO COVERAGE OF WU-CHANG SHIPYARD, WU-CHAN G CHINA (30 32N-114 17E) REVEALS THAT SUBMARINE CONSTRUCTION, PROBABLY "W" CLASS, IS UNDERWAY AT THIS SHIPYARD. 2. I ~ OVE RA G. REVEALS ONE PROBABLE 537 "W" CLASS SS AND ONE U/I VESSEL UNDER PORTABLE WEATHER SHEDS ON BUILDING WAYS. A PROEA R.E "W" CLASS SAIL (LENGTH OVER ALL APPROX. 35 FT. AT DECKLINE) IS VISIBLE BETWEEN WEATHER SHEDS ON ONE OF THE TWO VESSELS UNDER CONSTRUCTION. THE BOW AND STERN OF BOTH VESSELS ARE HIDDEN BY WEATHER SHEDS, PRECLUDING A LENGTH OVERALL (LOA) MEASUREMENT OF EITHER VESSEL. THE OVERALL LENGTH OF THE SHEDS OVER EACH WAY DOES NOT EXCEED APPROXIMATELY 270 FT. N O SUBMARINES WERE NOTED AT FITTING OUT AREA. 3. ALL MENSURATION PERFORMED BY PID PERSONNEL. S E C R E T -END OF MESSAGE- 1 25X1 25X1 25X1 Approved For Release 2007/12/11 : CIA-RDP78BO4558AO01100120032-2