POWER PLANT ADDITION AND MODIFICATION AT(Sanitized) RECEIVER SITE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-06505A000500040097-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
8
Document Creation Date: 
November 17, 2016
Document Release Date: 
June 7, 2000
Sequence Number: 
97
Case Number: 
Publication Date: 
February 20, 1967
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-06505A000500040097-2.pdf266.67 KB
Body: 
'?, Obd For Release 2000/06/14: CIAO QP78-06505A000500040097-2 UNITED STATES GOVERNMENT Memorandum Chief, Real Estate and Construction Division, OL ES M67 /3;;' DATE: 2 0 FEB 1967 Chief, Engineering Staff, OC SUBJECT: Power Plant Addition and Modification 25X1A at - Receiver Site 1. It is requested that your office negotiate 25X1C for construction and modification to the existing power plant at _ Receiver Site in order to accommodate the additional equipment required. Funds in the amount of are available for this work. 2. The attached drawings and requirements are provided as a guide and are not intended to limit your negotiations. 25X1A 2 Atts. As Stated z Approved4vr4k ei'awi1a0(g0Fd44F-eb# "8608 'MU tia4 -2 Approved For Release 2000/06/14: CIA-RDP78-06505A000500040097-2 REQUIREMENTS RECEIVER SITE POWER PLANT ELECTRICAL 1. Work Included - Furnish and install all materials, labor, equipment, appliances and services as specified and/ or shown on the drawings (C5386-S-02). Furnish only labor and material to install items of equipment furnished by the Government. The following items shall be furnished and installed completely by the contractor. A. All conduit and wiring. B. Lighting fixtures and convenience outlets. C. Connections to mechanical and electrical equip- ment to include control wiring and wiring to remote panel. D. Transformer, 3 phase, 300 KVA, 60 cycle oil filled, primary to match'existing incoming power, Standard NEMA taps, secondary 277/480 three phase four wire connected to GFE no-break drive motor. Furnish labor and material to install and/or rewire the following Government furnished equipment: A. Two (2) 200 KW diesel generators.' B. Control and distribution switchboard with remote panel and external dummy load. .C. One (1) 175 KW no-break power unit with control cabinet. Approved For Release 2000/06/14: CIA-RDP78-06505A000500040097-2 . Approved For Release 20-00/06/14: CIA-RDP78-06505AOO 00040097-2 MECHANICAL 1. Work Included - Expansion to the existing building as indicated on the attached drawing C5386-S-02. Dimensions indicated are minimum allowable'. Furnish and install four- way travelling crane of 10 tone capacity over no-break generator as indicated on drawing. Provide bases to support generating equipment and louvered openings through walls with ducts between engine radiators and openings. Intake louvers should have at least twice the the total radiator area of the generating equipment. Provide 500 gal. day tank with dual pump from main storage tank. Install 1/2" supply and return lines from day tank to no-break generator. Reconnect fuel piping to 200 KW diesel units. Install GEE engine silencers to outside of building including all supports and weather seals. MISCELLANEOUS DATA 1. Weight of no-break unit is approximately. 26,000 lbs. supported at (6) points on 12" X 12" steel plates. 2. Weight of 200 KW generators is approximately. 11,000 lbs. and is supported at 6 points on 6" X 6" steel plates. Approved For Release 2000/06/14: CIA-RDP78-065Q5A000500040097-2 Approved For Release-206/14: CIA-RDP78-06505A00050604pOa7-2 STB'1i[ NO. 2 Revised 7 February 1966 1. DESCRIPTION A split bus system fed by two commercial line breakers to separate buses which will hereafter be refered to as Bus # 1 and Bus # 2. Bus # 1 vill be the prefered bus. Operating voltage 120/2083 phase 4 wire 60 cycle. A no break generator set will feed bus 1 only, and two auto-start gener- ators will feed both buses through breakers. Incoming and all generator breakers will be electrically operated and interlocked to provide the following _.sequence of operations. NORMAL OPERATION (1) Commercial line breakers closed to bus 2 and no break input. (2) NO-break generator output breaker closed to bus 1. (3) Auto-start generator breakers open and both generators set to automatic operation. 2 each 235 XW. B. FAILURE (1) In event voltage and frequency of any incoming phase falls below 90% (adjustable) and remains there for an adjustable period of time up to 15 seconds, the commercial line breaker to bus 2 will be tripped to open and pro-selected generator signalled to start. (2) After the generator comes up to speed and voltage, its breaker viii close onto bas 2. (3) Bus 1 vill be fed by no break unit and no outage on this bus should have occured. () If bus 1 should experience a voltage drop below 190 volts, or a frequency drop below 58.5 cps, the no break breakers vill be tripped to open and the auto-start g neritor in operation will be closed onto bus 1, x Approved 14r F eeaie 00/06/'4-4''(pIA 7 065d5AD0d5 b4`0 ,Approved For Release 2000/06/14: CIA-RDP78-06505A000500040097-2 "' Revised 7 February lye? Indicating lights, commercial breaker position, red closed, green open Voltage and frequency sensing, commercial line and bus 1 v/ delay circuits Indicating light, commercial power available all phases Breakers, incoming commercial power to bus 1 and 2 with controls i6oo amp frame, adjustable trip, Westinghouse DB-50 Breaker, commercial power to no break 640 amp frame. Westinghouse DB-25 B. GEAERATORS Breakers, no break feed to bus 1, 600 amp frame Westinghouse DB-25. Breakers, generatorsto bus 1 and 2, 1600 frame Westinghouse DB-50 Indicating lamp showing no.break fail Indicating lamps shoving breaker position, red closed, green open Switch, engine selection OF7-1-2 Switch, engine to bus control OFF-Bus 1 to Gen 1 -'Bus 2 to Gen 2 Switch, momentary, back to commercial Switch, eliminate commercial power to bus 1 Reverse power relays Switch, auto-manual breaker operations Switch, remote breaker operator, load bank to generators, keyed. C. REMOTE PANEL Freq meter 55-65 cycles Freq meter switch 3 pos. OFF-Bus 1 - Bus 2 Voltmeter 0-300 V Voltmeter switch 8 pos. Bus 1 OFF-1-2-3 Bus 2 OFF-1-2-3 Indicating light - Commercial power available all phases Indicating light - No break running, green Approved For Release 2000/06/14: CIA-RDP78-06505A000500040097-2 Approved For Release-20,00/06/14: CIA-RDP78-06505A000500040097-2 Revised 7 February 1966 or the second auto-start generator will be signalled to start and it closed onto bus 1 after it has reached operating speed and voltage. This choice will be made by the positioning of a selector switch mounted on the switchgear. An indicating lamp vill light showing failure of the no break systems. C. RETURN TO NORMAL After the commercial power has returned to 95% (adjustable) voltage on all phases and frequency and remains there for 30 min. (adjustable 0-30), an indicating lamp will light and a momentary switch may then be depressed when desired. This switch will trip the auto-start generator breakers to bus 2 and reclose the commercial breaker to bus 2. If the no break generator has failed the auto-start generator breaker feeding bus 1 vill be opened and the oomeaercial line breaker to bus 1 will be closed also. A switch will be provided to prevent this last operation if it is desired to maintain an auto- start generator feeding bus 2 rather than commercial power. D. MANUAL An auto-manual switch will be provided to elisinate the automatic operation and allow full manual (electric) operation of all breakers. 2. INSTRIAKKNTS A. COMMERCIAL POWER Frequency meter 55-65 cycles Kilowatt hour demand meter' Ammeter 0-1500A Ammeter switch 3 phase 4 pos. OFF-1-2-3 Voltmeter 0-300 Voltmeter switch 3 phase 4 pos. OFF-1-2-3 Approved For Release 2000/06/14: CIA-RDP78-06505A000500040097-2 Approved For Release 200/06/14: CIA-RDP78-06505AO005QW40097-2 Revised 7 February 1, Indicating light - No break fail, red Indicating lights breaker positions Switch, back to commercial power Indicating light, Auto-gen fail, red. DISTRIBUTION Bustl 2 each 4o0AF, 250AT 2 each 400AF, space only, less breaker Bas if 2 ~F IWO5 aA% 2 each l+OOAF, 400AT ~? N~ 1' 2 ea22W., 100AT 4/0 A -'AV TZ 2 each 225AF, space only, less breaker 2 each 400AF, space only, less breaker Al A~ "r FEU 6 E. LQAD BANK ~ 4 r`.. > ?" A 250 KW load bank for remote location will be provided and fed from each generator breaker. Line operated moulded case 800A breakers will be provided as part of load bank, controlled from the switchgear and inter- locked to allow one generator at a time to feed load bank but with provisions to parallel if required. The load bank will have 5 switched steps of 50 XW each, be suitably protected, forced air cooled (vertically or horizontally) and for installation outdoors at maxdw ambient temp of 1er. Approved For Release 2000/06/14: CIA-RDP78-06505A000500040097-2 25X1A Approved For Release 2000/06/14: CIA-RDP78-06505A000500040097-2 Next 4 Page(s) In Document Exempt Approved For Release 2000/06/14: CIA-RDP78-06505A000500040097-2