(Sanitized) MONTHLY SUPPORT RE: SUPPLEMENTAL NARRATIVE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-06505A000100020014-9
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
November 16, 2016
Document Release Date:
May 23, 2000
Sequence Number:
14
Case Number:
Publication Date:
July 17, 1969
Content Type:
DISP
File:
Attachment | Size |
---|---|
CIA-RDP78-06505A000100020014-9.pdf | 86.5 KB |
Body:
25X1A
25X1A
25X1A
25X1A
25X1A
25X1A
25X1A
25X1A
25X1A
C9A5 I
L v
_
DISPATCH
=
n
C O N F I D E N T I A L
MARKED FOR INDEXING X_-_
TO Director of Logistics: Attn: Chief, Real
:SAC
Estate and Construction Division, OL.
NO INDEXING REQUIRED S_A
INFO.
ONLY QUALIFIED DESK !. ----
Chief Far East Division
CAN JUDGE INDEXING
FROM
Chief of Station,
MICROFILM
SUBJE ?
Monthly Support RE ? Supplemental Narrative .rcli.
ACTION REQUIRED - REFERENCES
REF: Logistics 9207
PRE
1. 9-14 June .969 RE T
25X
A
Projects
construction consists of an underground bunkered area. Help was
requested in the following areas:
a. Air Conditioning. Assistance was given in the local
procurement of components for a complete system which tonnage and
type of system was designated by a , 25X1
in Saigon. Contact was made with a local A/C
manufacturing company and specifications presented for the system
components. The product will be locally manufactured to Trane stan-
dards using Coplamatic compressors and Japanese, Chinese, and U.S.
controls. The factory was visited and conversations held with the
factory engineers and designers. The product being produced appears
to be first class. A schematic and operation plan and control
drawing will be furnished. Delivery is expected to take three weeks.
System will consist of four six ton package units and one thirty
ton air cooled condenser, which will be supplied with two spare
motors and fans. It was requested that construction drawings and
bill of materials be forwarded for review.
b. Water System. The water system that has been installed
at Project does not provide for sufficient pressure to
/
operate the flush valves. The-was requested to design a AX
1A
pressure system to correct this deficiency. A design and a bill of
materials was furnished for a pressure system and an automatic
chlorinating system. Cost of locally procured materials is approxi-
mately $2,000 (U.S.). A complete package will be procured locally
and air lifted to Vietnam.
Dist ibution:
istics: Attn : Chief P
tor of Lo
Di
I BE, a,
rec
g
U,
D,
?
' '
'
~
#
"
t
T
iF1
1 - C/FE
CROSS REFERENCE TO
DISPATCH SYMBOL AND NUMBER
DATE
17 July 1969
Approved For Release
20 78-0650
AdWt4'b020014-9
C O N F I D E N T I A L
25X1A
Approved For Release 2000/06/06 : CIA-RDP78-06505A000100020014-9
Approved For Release 2000/06/06 : CIA-RDP78-06505A000100020014-9