(Sanitized) MONTHLY SUPPORT RE: SUPPLEMENTAL NARRATIVE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-06505A000100020014-9
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
November 16, 2016
Document Release Date: 
May 23, 2000
Sequence Number: 
14
Case Number: 
Publication Date: 
July 17, 1969
Content Type: 
DISP
File: 
AttachmentSize
PDF icon CIA-RDP78-06505A000100020014-9.pdf86.5 KB
Body: 
25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A C9A5 I L v _ DISPATCH = n C O N F I D E N T I A L MARKED FOR INDEXING X_-_ TO Director of Logistics: Attn: Chief, Real :SAC Estate and Construction Division, OL. NO INDEXING REQUIRED S_A INFO. ONLY QUALIFIED DESK !. ---- Chief Far East Division CAN JUDGE INDEXING FROM Chief of Station, MICROFILM SUBJE ? Monthly Support RE ? Supplemental Narrative .rcli. ACTION REQUIRED - REFERENCES REF: Logistics 9207 PRE 1. 9-14 June .969 RE T 25X A Projects construction consists of an underground bunkered area. Help was requested in the following areas: a. Air Conditioning. Assistance was given in the local procurement of components for a complete system which tonnage and type of system was designated by a , 25X1 in Saigon. Contact was made with a local A/C manufacturing company and specifications presented for the system components. The product will be locally manufactured to Trane stan- dards using Coplamatic compressors and Japanese, Chinese, and U.S. controls. The factory was visited and conversations held with the factory engineers and designers. The product being produced appears to be first class. A schematic and operation plan and control drawing will be furnished. Delivery is expected to take three weeks. System will consist of four six ton package units and one thirty ton air cooled condenser, which will be supplied with two spare motors and fans. It was requested that construction drawings and bill of materials be forwarded for review. b. Water System. The water system that has been installed at Project does not provide for sufficient pressure to / operate the flush valves. The-was requested to design a AX 1A pressure system to correct this deficiency. A design and a bill of materials was furnished for a pressure system and an automatic chlorinating system. Cost of locally procured materials is approxi- mately $2,000 (U.S.). A complete package will be procured locally and air lifted to Vietnam. Dist ibution: istics: Attn : Chief P tor of Lo Di I BE, a, rec g U, D, ? ' ' ' ~ # " t T iF1 1 - C/FE CROSS REFERENCE TO DISPATCH SYMBOL AND NUMBER DATE 17 July 1969 Approved For Release 20 78-0650 AdWt4'b020014-9 C O N F I D E N T I A L 25X1A Approved For Release 2000/06/06 : CIA-RDP78-06505A000100020014-9 Approved For Release 2000/06/06 : CIA-RDP78-06505A000100020014-9