REQUEST FOR BUILDING AND RENOVATION FUNDS FOR TSS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-04915A000400030051-1
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 9, 2016
Document Release Date:
June 27, 2001
Sequence Number:
51
Case Number:
Publication Date:
September 30, 1953
Content Type:
MF
File:
Attachment | Size |
---|---|
CIA-RDP78-04915A000400030051-1.pdf | 237.97 KB |
Body:
-
40T
Approved For Release 2001/08/59 : CIA-RDP78-04915A000400036 5
30 ieteber 1953
'11 rOi Dep.ty Lirector (Adm(nistration)
Ohief? Technical Services Aaff
lequest for Building and Senevetion Funds for TBS
1. this asmorandum outlines the *cost ion and renovation
qpirenante of TOj for Fiscal 1954.
2, The largest mingle item is the renovation of the
dieg to house the eajor portion of T3S activities. This project
woks approved by the aux in December 1952. It is presently estioated
that this will moment to $365,940 and will house the major portion of
the activities now being onobated in Ouartero 47e. The present
quarters in Ouartere 4ye are inefficient and inappropriate for many
TS4 activities; firs*, because with reduced personnel and budget it
is all the mere important floor space be se arraeged as to provide
maxima possible monitoring of TS11, varied activities to attain utmost
efficiency, second to provide for the pooling of the atni laboratory
facilities essential to tij activities, fltailitiOS which cannot be
furnished in a building of the type of ouarters 3ye, partieularly in
view of the exceptionallynammrrooms and its general construction,
third because they do not offer secure and fireproof storage facilities
for irreplaceable documents and other equipment.
3. Additional money will have to be spent this year on th01111111
25X1A building to house the increase in collection of Fal
furnishings clothing and equipment). Wit the shift of various support
25X1A function* to ;teadqoarters this load has oonsequently been
increased. At prima Td3 is occupying about ane-half of the
25X1A floor space (the remainder being vacant) and it in expected
that before the end of the fiscal year Too will occupy approximately
three-quarters of the available floor space. This will cost 42,000.
Breakdown: Oecurity requirements, 4;700; power outlets and circuits,
4,100; painting, 6100; Pluebing repair, 425; installation of drinking
fountain, ii%300; co4tin4encies, .475; Total, 42,000. This money at
be spent during Fiscal '54 to meet present pressing needs even though
an alternative permanent location which meets security, fireproof, moth-
proof and other special requirements for the storage of clothing and
equipment?and which has been the subject of a yeses mneuceessful
search?in found.
/4. Other small 0
Approved For Release 2001/08/ :CIA-RDP78-04915A000400030051-1 k
I
25X1A
25X1A
25X1A
U
approved For Release 2001/08/09 : CIAr DP78-04915A000400030051-1
/
r
4. Other email building or renovation expenses are occasioned
by the following:
A, The fitting out of a presentation and briefing ream
place the present rooms in L goading.
3, Uerrying out the fire and sit sty requirements di
ics in the new quarters of
5. The construction of facilities to house the
activities now being carried on in Hosslyn has already been approved
This amounts to 06,500. The renovation of the Wh3 Mailding to pro-
vide photographic training facilities has aloe been approved for imp-
mediate action. This amounts to approximately 424,000.
6. There are, of course, various contingencies which may develop
pending upon policy decisions of higher authority and of which T&4.
can expect no advance notice; for example, should the work now beim__
performed either at or in the Far Keit be further reduced andM
be expected to pick up the load, additional floor space or a rearrange-
aeat of floor space will be neceasary to accomplish this. Lib has no
way of anAloipating these contingencies,
7. The Technical .5ervices Laboratory is presently oceupying space
:irovided by the Aviv. Under the conditions by this space was
obtained it was agreed we would not occupy this epees more than two
years, which period expires a year from now. It will be necessary to
find new wafters and commence, if not largely oomplete, renovation
of these new quarters in this fissal year. Amp the now location
has net yet been obtained it is impossible to say exactly how much
will be required for the estimated 12,000 scalars feet required.
8. Not considered in this paper are any alterations which will
need to be made to safe heuess since it is understood that such altera-
tions would come out of operational funds rather than building and reno-
vation fends.
9. In summary, already approved are building or renovations totaling
6;5000. Further building or alterations to the total of 0$63,940 are
needed for the balance of this fiscal year. If all the above reeparements
are approved end the nanny expended plus the building and renovations
already approved, the grand total of money required for building and
renovation for TS4 for fiscal 1954 is $42e1,440.
Approved For Release 2001/08/09 : CIA-RDP78-04915A000400030051-1
25X1A
25X1A
25X1A
25X1A
25X1A
Approved For Release 2001/08/09 : CIA-RDP78-04915A000400030051-1
It is requested that the WM of 065040 be made aveileele
renovation of and the other
als outlined in paragraphs 2, 3 and 4 above
00aG0_44N04:
for
ilkief, Technical 7:2ervices Staff
who read & approved but at bons
aick before final retyping?
04053
Date
Date
ce Par. 4A, CVO will discuss this further tth TSS, No
in L 3Ldg. for this purpose.
2 will develop, in conjunction with T5S? the specific netessi
det&tleI requirements for the laboratory mentioned in per. 7. -.pirate
report and recommendation Will then be made.
/s/ LTS
Approved For Release 2001/08/09 : CIA-RDP78-04915A000400030051-1
-3-
25X1A