ADVICE OF PROJECT ACTION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-04901A000100020078-1
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
1
Document Creation Date:
December 12, 2016
Document Release Date:
June 26, 2001
Sequence Number:
78
Case Number:
Publication Date:
January 26, 1949
Content Type:
FORM
File:
Attachment | Size |
---|---|
CIA-RDP78-04901A000100020078-1.pdf | 102.52 KB |
Body:
App v Re a 1 I 04901A0001000200 7
CIA PROJECT N0.
8-1
TO:
PROJECT TITLE
ASSISTANT DIRECTOR, ORE
ASSISTANT DIRECTOR, OSO
(ar#ge Faceilltie~e
ASSISTANT DIRECTOR, 00
SSISTANT DIRECTOR, OCD
CHIEF, BUDGET AND FINANCE BRANCH.
CHIEF, SERVICES BRANCH
0Udr9WM, 9jects RevUW ( ,tte
PRO ECT DUR T ION
$ or one irealr, subject renewal
on year to year basis for period of
~.
yom.
DESCRIPTION AND SCOPE OF PROJECT
in subject project the Director approved leasing new garage spa" at a cost
of per south to include beat =d Wit.
After approval of pm ject,, lessor changed his mind and offered a
n of 0340 per south wit Bout utilities. Dwrest ,gation i asteal that ties
1411 cost rce ata * $18m par year, itiich would inereue annual oost, over prior
approval
YUrtber sxmiitation of this project revea3;s that by consolidatiri garage
a ct vl ties into re single building, the services of one + ,e new autIearised,
be dispensed with,. and that Approximately $3DO per year in gasoline coats as
be sgvsd by gassing vehicles before leavi a central. point each sew or after
reporting in to a central point at, the alone of business. Total gross savings
involved wu be apart taffy $3000 per annum, or a net of $2W under the
pro just r as on approved.
SUMMARY OF ESTIMATED COSTS
OBJECT CLASS VOUCHERED UNVOUCHERED TOTAL
01 Personal Services 2700 'r $
02 Travel
O3 Transportation of things 0 8PwI7iL'"' 0` -- -------
04 Communications ;x0 Clean In
0
d
i l i
i
'-
;'
'~
5 Rents an
U t
t
1; ti
L
e s ties f
i J
C
44
~tro TS S
c TO:
06 Printing and Binding
Glass. 50
d0~
07 Other Contractural Services
(I '" Isy g7$
t
l
08 S
li
d M
ri
upp
es an
a
e
a
s
By
ate: N-------------
09 Equipment
Other
TOTAL $
SPECIAL PROVISIONS OR LIMITATIONS
In rtiw Of t b* saving Of per annum , under t 1W s pparov d terns of subject
i Wit, reran approval of ing new 9" 0 apses at a coat of $21W per
eleeae ., with Utilities to be f0rsb f4i No other shange in Prior approval
is Involareed, as the details of inal en 9Ad >,Iatir1 costs are w ehaalgsg.
REC E
AT (PROJECTS REVIEW COMMITTEE)
ACTION BY DIRECTOR CIA
(APPROVED) (D) FOIAb3b
J
Jaen. ' 9
two
DATE