ACTION ON SPACE STUDY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-04787A000100060004-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
6
Document Creation Date: 
December 12, 2016
Document Release Date: 
January 2, 2002
Sequence Number: 
4
Case Number: 
Publication Date: 
August 4, 1966
Content Type: 
STUDY
File: 
AttachmentSize
PDF icon CIA-RDP78-04787A000100060004-6.pdf344.34 KB
Body: 
Approved For Release 2002/01/: CIA-RDP78-04787A000100060004-6 4 Auclust. 146, AIM O ON Mao STUDY 25X1A9A ion on the proposal to proceed toward construction additional space at Langley for all Departmental activities. a. Approve further planning and feasibility studies: (1) Specify total net space to plan for. (2) Any limitation on outside contacts--see 2c and 2d below. (3) Identify those activities for which new space is to be planned. b. Disapproval. Project is ended. 2. 1966 - 1967 - ORC ZATION OF BU *3 PLANNING JIMP a. Representatives from each Directorate. b. 'Contract employment of technical assistants- this requires an explanation to the Bureau of the Budget concerning the item in the FY '67 budget papers for employment of contract employees to assist the Building Planning Staff. c. Negotiations for additional land needed. 4. Preliminary contacts with the General Services Administration and the Advisory Committee on Federal buildings in the National Capital Region. The purpose Approved For Release 2002 Approved For Release 2002/01/29 : CIA-RDP78-04787A000100060004-6 here is to "feel out" reaction and to identify possible problems concerning public transportation, utilities and road networks and the impact on the Langley area of employment of an additional persons in the new buildings. C. Continuous updating of Space Requirements data. f. Feasibility and and preliminary costs studies to develop specific proposals and alternatives covering: (1) Location in the building(s) with respect ach other of departmental units or elements. (2) The location, number, and type of addi- Idings, access traffic networks cluding possible multiple floor parking) and any necessary modification of existing space. (3) co u cations and transportation arrange- ments within and between buildings and appropriate consideration for fallout shelters and hardening of certain vital sites. (4) explanations and justification needed to secure the approval of BOB, Congressional mmittees, and others for construction authoriza- ion and funds for the Architectural-Engineer design services. 25X9A2 Approved For Release 2002/01/29 : CIA-RDP78-04787A000100060004-6 Approved For Release 2002/01/29 : CIA-RDP78-04787A000100060004-6 x or a. Full coordination with GSA and the Advisory Committee on Federal buildings in the National Capital Region. This may involve considerable work, briefings Me adjustment of our plans to meet the vi and objections of GSA and Viers of the Committee. b. The Public Buildings Service to away chitect-Engineer services for design of ng(s) and all the related traffic networks features required (power plant, additions to cafeteria, parking building, transient quar+ ers, etc,). entation of the detailed cost data and s with the necessary explanations to the Bureau of the Budget and the several committees of the House and the Senate to secure the funds for construction of the additional building(s). 4. N l - 1224 NSTRVCZCN Construction of the building(s) and all related features. Approved For Release 2002/01/29 : CIA-RDP78-04787A000100060004-6 Approved For Release 2002/01/2?Q-> jA-RDP78-04787A000100060004-6 BRA vlo 25X1A9A 4 August 1966 &M29- 0 Da tion on the proposal to proceed toward construction of additional space at Langley for all Departmental activities. a. Approve further planning and feasibility studies S Specify total net space to plan for. I%". -PaWrAMIMMO~- (2) Any limitation on outside contacts--see 2c and 24 below. (3) Identify those activities for which now space is to be planned. b. .Disapproval. Project is ended. 2. 1966 - 1967 - C3BG S, B of fl I DING L NIBG S'rArr a. Representatives from each Directorate. b. contract easployment of technical assistants-- this requires an explanation to the Bureau of the Budget concerning the item in the FY ' 67 budget papers employment of contract eaasployeees to assist the Building Elanning Staff. Enginger/costs study of feasibility of relo ati n of ial Purpose Space. e. Negotiations for ad#.tionalar aaeee Tel. Frame d. Preliminary contacts with the General services' GeOCSr Administration and the Advisory Committee on Federal buildings in the National Capital Region. The purpose Approved For Release 2002/ . RDP78-04787A000100060004-6 Approved For Release 2002/01/29 : CIA-RDP78-04787A000100060004-6 ley area of employment of an additional possible problems concerning public transportaticsn, utilities and road networks and the impact on the persons in the now buildings. 25X9A2 Continuous updating of Space Requirements data. "feel out" reaction and to ideentify f. Tasibility and and prep dry costs studies to develop specific proVosals and alternatives coverings 1 Location ih t building (s) with ro to each other of departmental units or elements. (2) The location, number . and pe? of addi- tional buildings, access traffic networks uding possible multiple floor parking) and modification of existing space. (3) Cone urcations and transptertation arrange- and between buildings and appropriate ation for fallout shelters and hardening of sin vital sites. (4) explanations and justification needed to secure, the approval of BOB, Congressional ra for construction aut'hori za- tio for the -,rchitectur design services. ngineeer Approved For Release 2002/01/29 CIA- RDP78-04787A000100060004-6 Approved For Release 2002/01/~t -0 fDP78-04787A000100060004-6 iii scary buil?: ings in the National Cap Legion. This may involve considerable work, briefings and possible b. The Public Buildings Service to award a con of our plans to sweat the views and objections of GS, and members .. Vn3fT.49xn9M`N..?F-'C1FN.f914~'~l.~Y.gC-~FIY the building(s) and all the related traffic networks other features required (power plant, additions to cafeteria, p4r?ing building, transient quarters, etc. Lion of the detailed cost data ceessary eeeplatiens to the Bureau and the several committees of the House and the rate to secure the funds for construction of the additional building(s). 7 'i0 Construction of the building(s) and all related features. Approved For Release 2002/01/29: CIA=R6'78-04787A000100060004-6