RELOCATION OF PROJECT(Classified)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-04727A000100090017-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 9, 2016
Document Release Date:
March 13, 2001
Sequence Number:
17
Case Number:
Publication Date:
April 13, 1953
Content Type:
MF
File:
Attachment | Size |
---|---|
CIA-RDP78-04727A000100090017-5.pdf | 73.59 KB |
Body:
SE6iiE~-
Approved For Release 2001/07 00
APR i _ 1953
ME14DRANDUM FOR: Director of Central Intelligence
THRU: Deputy Director, Administration
SUBJECT: Relocation of Project
25X1A2d1
25X1 A2d 1 1. On 9 March 1953 a decision was reached not to proceed with
Project - at the site selected- 25X1A9a
25X1 A9a ~ Immediately thereafter a search was launched to ? a
suitable alternate location. Prelimin investigation by personnel
of the Office of Training and Logistics 25X1 C4a
25X1 C4a indicates that a location w is mee s e
requirements exists The area 25X1A6a
under consideration includes:
25X1 C4a
2. The matter of developing the project under cover at the
W
25X1 C4a
the workin
i
ffi
g
c
s ~
sa
above location has been discussed with o
25X1 C4a
level, and they have stated it appears feasible insofar as the
is 25X1C4a
at the working level have indicated t r
d
.
25X1 C4a concerne
f
t
25X1C4
er
rans
would be no difficulties in obtaining
a
25X1 C4a M if such were desired.
3.
made:
The following pertinent observations regarding the area are
a. The physical requirements for weather, terrain, hydro-
graphic conditions, and isolation are met to an adequate degree.
b. The necessary buildings, structures and utilities are
already in existence. Cost of rehabilitation and modification
as required would be materially less than that previously
Approved For Release 2001/07/12 : CIA-RDP78-04727A000100090017-5
Approved For Release 2001/07/12: CIA-R 78- 9
0017-5
liecurtity 4n06?
approved at the initial site.
25X1 C4a
c* assistance and logistic support to the activity
would be rea ily available.
d. The maintenance of operational security, particularly
involving foreign personnel, would pose some problems. However,
it is believed these can be satisfactorily resolved.
4. It is requested that approval be granted to proceed with imple-
mentation of the project at the above location within the limitation of
funds previously approved
M&TTHEW BAIFV
Director of Training
Approved For Release 2001/07/12: CIS--14727A000100090017-5
25X1A2d1
25X1A