DRAFT FIVE-YEAR ADP PLAN

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-04723A000200060015-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 12, 2016
Document Release Date: 
May 31, 2000
Sequence Number: 
15
Case Number: 
Publication Date: 
May 29, 1968
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78-04723A000200060015-3.pdf168.68 KB
Body: 
Approved For Release 2$O2/. 29 May i 8 SS.-68/215 MEMORANDUM FOB Processing Staff/OPPS SUBJECT . Draft Five-Year AOP Plan 1. This is to reiterate some of the co ents made In our recent IPC meeting, and to mention some specifics which you might note, and incorporate in a revised draft if feasible. 2. PRINCIPAL FINDINGS: While we all agreed that the tenor of the total presentation of the Agency Five,Year Plan Is very well balanced, I feel that the order of presentation for the high level reader Is bound to disturb him. The projected grosat'h rates (which no , , _ .. , Get} not se=mm au ;AV . , motion processing organization) will be read first, and most probably out of context. I f you can work up a few pungent sentences to show that what follows in the way of projected trends should not be vi meted with alarm you will be doing us all a very great service. Motor ADP systems speaks to a partial list of ma P e 3 ag . 4hICh could Imply that the figure c a ded" ATOP systems d , expa new an in dollars and man years are devoted only to new developments, while In fact we know that your figures Include all on-going operations as applications. 4, on page 9 under An Agency ADP Program", you state that only one-third of our ADP, the cost of the Office of Computer Services, is readily identifiable in the IPZE program category. This Is certainly not true, or less true, In the context of the most recent Program Call. All of the CS ADP was covered under the IP&E program category. 5, Page 13. armor Apncy ADP Projects b_Y.. Priority. As noted ears not see they C' 5 document and Information storage i ngs we our meet and retrieval systems being ranked as moderate Instead of top priority, nor can we see the PSIS, TOD, or COINS being. -rated as moderate rather than marginal In priority. Nor can the CS accept the notion that the Fi/D PARACEPT proccssing system should be ranked below the afore mentioned as marginal If promising sources develop. In my view, the probable success of the PARACEPT system, Including the assumption that pertinent date will be acquired and used, certainly exceeds the expec- tations for COINS if not the other Items mentioned. Re. Fi/D PARACEPT, Approved For Release 2002/05/08 : CIA-RDP78-04723A000200060015-3 Approved For Release 2002105/081 CIA-RDP78-04723A000200060015-3 the chart showing alternatives In terms of dollar reductions should show a difference between 4.0 million and 3.7 million from full system to optimum, since taking optimum down to 3.0 million will preclude the OCF and, In effect, leave us with what we have now. The same goes for t=.- austerity figure. 6. As for the specific recommendations on Page 24, Paras, c, d, and e; I am. sure you understood and sympathized with our point tha management of Agency ADP has reached the level of management overkill already, and that more exacting reporting procedures and approval mechanisms w i l l be counter--productive. On the other hand, I f more explicit detail on Agency ADP programs must be developed, we certainly would prefer this to be done within the Agency Program Call and Budget 7. researc ure, rather than as a separate exercise. 27: R&D. Please note that RID does not conduct ADP 8. Page 31: Figure `i. Your chart for FY 1369 shows 5.4 million, which Includes 850K for newi equipment, field mlcro- fi lming (100x) and keypunch purchases of 110K. We have been moved for various reasons to strike those Increases In that year, and If you plan to change the chart, i t would bring that bar down to around 4.3 figure. 9. Page 37= Plans Directorate. if you want to change the figures, the last s nter+ i Par raph 1. should read: this -bective contemplates the data base of seven 1/2 million Index over l million documents or 3.5 million pages, and per.. , records , formance of 1,000 document retrievals and 4,000 name searches daily, plus major additional processing. The third paragraph under the RID Central Retrieval System" should be changed to read, In the second sentence, the first two subsystems are operational and the third wit) be operational In 1972. 25X1A cc : 25X1 A 1--C/F1 D/TPB - Mr.0 l--iPC/DDS&T l - I PC/DOS I - IPC/DOt Chief, DOP Systems Group Approved For Release 2002/05/08 : CIA-RDP78-04723A000200060015-3