PROGRESS REPORT - SPECIAL PROJECTS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-04718A001000030009-0
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 9, 2016
Document Release Date:
June 7, 2001
Sequence Number:
9
Case Number:
Publication Date:
August 19, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 151.69 KB |
Body:
leg Of
'CIA-RDP78-04718AO01000030009-0
oa
Space, Maintesexce & Facilities Preach
25X1A6a'
2X1A6a
~~niHen
.
ish and install equipment required to insure antis-
116atina. A.C. and Hot w but water _systems.
factory performance of heating, A.C., ventilating and
Project
Estimated
Job Order No.
Cost
and Date
Id M0141 qZ111 a - Aleatt &
Furnish and install window and 155 air vent grilles
$21,700
54-1496
based on security requirements; plus 85 window and 22
23 April 3954
door grilles for Tempos M and Q.
Alterations --Barton Asll :0d 1 1. Install approxi-
aately-150 lineal feet of partitioning; -shore 22 bays;
$15,000
See remarks
vault 10 bays; soundproof 35 bays; install 8 rower outlets
(tentative)
for IBM and 20 fluorescent fixtures; pant new work only.
Alterations - M & Q - DD/I Move. Partition removal and
erection; shoring; vaulting; window and door grilles;
x,50,000
See remarks
electrical service; air conditioning (special areas);
(tentative)
plumbing; painting; soundTroofing.
Install 3% receptacles including necessary service -to
$67,665
51~-7.3 !,o
provide branch panel capacity for complete air condition-
21 April 1954
-ing. Install 245 window and 7 package type A.C. units.
- . Furnish and instal
spperooriaate 4, 750 lineal feet 5 ;gaups chain link fence
$11 ,350
54-1.476
71 - 04 high with 3 strands barbed wire around
20 April 1954
Aleott, Barton and Curie Rails.
rations
nsive alterations required in conjunction with TSS
$375,000
54-1770
occupancy of entire building.
2 June-1951
-Alterations --WR from Qtrs. I to Parton -Rail. Remove
approximately 360 lineal feetof partitioning; install
54-1660
approximately 1340 lineal feet of partitioning; remove
h -& i
2
l
f
i
ll
e
17 May 1954
co
ums,
urn
s
nsta
steal I
beams; paint new
LUAU
Ream approximately 278 lineal feet of partitioning. In-
5L-1660
stall appraaimately 344 lineal feet of partitioning; souD&
17 Mew 1954
f 160 sq. ft. of space; vault 2 rooms; raint new work
O Within rs I.
Reaovs and Installation of partitions; sbhoring, vaulting;
$26,7
00
54-1660
painting new work only.
17 May 1954
Soutb To Quarters I
Remove agrcximate y 450 lineal feet of partitioning; in-
54-1660
stall arrroximstely 225 lineal feet of partitioning; shore
17 May 1954
bats; vau 40 raint new work only; install 10
ix 4
Alteration. - DCI Move from -Administration to South Bld?.
Install rartitioning; remove partitioning; renovate east
$11J,900
- 54-1659
elevator; vrovide window type air conditioners; install
17 May 1954
tunnel between buildings; install kitchen; painting.
Construct ma~rimum fire resistant walls and roof for stor
See remarks
age area; complete vaulting; fire extinguisher system; A.C
humidity c ro ; Da itio ing for special rooms and
,59 eon
$55,000
54-1707
24 May 1954
Replace present linoleum with asvhalt tile; repaint 16
$3,922.00
1428
54
--
rooms -and corridor; etc.
~4
4
d
-29
Alterstign
W Building -- Office of - .
Partition erection (450 lineal feet ; partition removal
x;27,813
54-1661
(50-lineal feet); vaulting; air conditioning; ventilation
17 May 1954
and heating.
Alp COWItioninr 1.]g one Prams Room -=South Building.
Furnish dmwbsI15ol bt sacs *4I(t **) aaM#W 18
001980$00009-0
54-1499
tower including ducts, plumbing-& electrical wiring to
d filt
ti
th
i
diti
i
i
l
23April 1954
era
on.
ng an
l-wea
er a
r con
on
de a
prov
W
Approved For Release 2001/08/10: CIA-RDP78-0 J8A0 1000030009-0
DMTZ= 19 August 1954
Estimated
Estimated
'J6
startiag
Completioa
Actual Work Remarks
Date
Date
Completed
Completed
Contraet awarded
16 August 19514
100%
14 NO 1954
Bell and light system 85% complete. Paint-
7 May 19514
5 September
914% ing apprc.ximately 80% complete and pro-
gressing favorably. Package a/c unit equip-
ment arriving on job site.
Further progress delayed pending availabill
9 April 19514
See remarks
6% of wc,rking space and/or OSI move. Addi-
tional requirements still being received.
Estimate completion of all work within
12 July 19514
15 Sept. 514
30% Barton and Curie Halle r 27 August, with
excpetton of package units.scheduled to
start wank of 23 AnR3istt 1951-
8 July 19514
20 August '514
90% Waiting on ehipment of sliding gates due
this week --two days installation.
Work progressing favorably. Color scheme,
22 June 19514
January 1955
11% floor the and decor of conference room
being studied.
12 July 19511
C' mpleted
100%
6 August 195!4
Completed
16 July 19514
6 August 19514
100%
16 July 19514
Completed
100%
17 August 19514
16 July 19514
214 August 19514
20% Contractor proceeding with alterations as
space is vacated.
Manor alterations to start following move
See remarks
Not determined
0% of 00 to Quarters Fye. Tunnel project
to bE started next week.
Comparison of two subject as in proCS60
of (valuation.
5 August 195!4
5 Au?ust 195i,
5% All phases of work progressing satisfactor-
ily.
7 May 19514
Completed
2 August 19514
1'0
10 August 1954.
:See remarks
!4(l Contractor working; excellent progress.
Contract substantially completed.
i June 1954
Appww4ror R
ems 001/ > y1~r, IBg i8gt147E8ARm'Fi1 01~9~5 ~'