PROGRESS REPORT - SPECIAL PROJECTS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-04718A001000030009-0
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
June 7, 2001
Sequence Number: 
9
Case Number: 
Publication Date: 
August 19, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78-04718A001000030009-0.pdf151.69 KB
Body: 
leg Of 'CIA-RDP78-04718AO01000030009-0 oa Space, Maintesexce & Facilities Preach 25X1A6a' 2X1A6a ~~niHen . ish and install equipment required to insure antis- 116atina. A.C. and Hot w but water _systems. factory performance of heating, A.C., ventilating and Project Estimated Job Order No. Cost and Date Id M0141 qZ111 a - Aleatt & Furnish and install window and 155 air vent grilles $21,700 54-1496 based on security requirements; plus 85 window and 22 23 April 3954 door grilles for Tempos M and Q. Alterations --Barton Asll :0d 1 1. Install approxi- aately-150 lineal feet of partitioning; -shore 22 bays; $15,000 See remarks vault 10 bays; soundproof 35 bays; install 8 rower outlets (tentative) for IBM and 20 fluorescent fixtures; pant new work only. Alterations - M & Q - DD/I Move. Partition removal and erection; shoring; vaulting; window and door grilles; x,50,000 See remarks electrical service; air conditioning (special areas); (tentative) plumbing; painting; soundTroofing. Install 3% receptacles including necessary service -to $67,665 51~-7.3 !,o provide branch panel capacity for complete air condition- 21 April 1954 -ing. Install 245 window and 7 package type A.C. units. - . Furnish and instal spperooriaate 4, 750 lineal feet 5 ;gaups chain link fence $11 ,350 54-1.476 71 - 04 high with 3 strands barbed wire around 20 April 1954 Aleott, Barton and Curie Rails. rations nsive alterations required in conjunction with TSS $375,000 54-1770 occupancy of entire building. 2 June-1951 -Alterations --WR from Qtrs. I to Parton -Rail. Remove approximately 360 lineal feetof partitioning; install 54-1660 approximately 1340 lineal feet of partitioning; remove h -& i 2 l f i ll e 17 May 1954 co ums, urn s nsta steal I beams; paint new LUAU Ream approximately 278 lineal feet of partitioning. In- 5L-1660 stall appraaimately 344 lineal feet of partitioning; souD& 17 Mew 1954 f 160 sq. ft. of space; vault 2 rooms; raint new work O Within rs I. Reaovs and Installation of partitions; sbhoring, vaulting; $26,7 00 54-1660 painting new work only. 17 May 1954 Soutb To Quarters I Remove agrcximate y 450 lineal feet of partitioning; in- 54-1660 stall arrroximstely 225 lineal feet of partitioning; shore 17 May 1954 bats; vau 40 raint new work only; install 10 ix 4 Alteration. - DCI Move from -Administration to South Bld?. Install rartitioning; remove partitioning; renovate east $11J,900 - 54-1659 elevator; vrovide window type air conditioners; install 17 May 1954 tunnel between buildings; install kitchen; painting. Construct ma~rimum fire resistant walls and roof for stor See remarks age area; complete vaulting; fire extinguisher system; A.C humidity c ro ; Da itio ing for special rooms and ,59 eon $55,000 54-1707 24 May 1954 Replace present linoleum with asvhalt tile; repaint 16 $3,922.00 1428 54 -- rooms -and corridor; etc. ~4 4 d -29 Alterstign W Building -- Office of - . Partition erection (450 lineal feet ; partition removal x;27,813 54-1661 (50-lineal feet); vaulting; air conditioning; ventilation 17 May 1954 and heating. Alp COWItioninr 1.]g one Prams Room -=South Building. Furnish dmwbsI15ol bt sacs *4I(t **) aaM#W 18 001980$00009-0 54-1499 tower including ducts, plumbing-& electrical wiring to d filt ti th i diti i i l 23April 1954 era on. ng an l-wea er a r con on de a prov W Approved For Release 2001/08/10: CIA-RDP78-0 J8A0 1000030009-0 DMTZ= 19 August 1954 Estimated Estimated 'J6 startiag Completioa Actual Work Remarks Date Date Completed Completed Contraet awarded 16 August 19514 100% 14 NO 1954 Bell and light system 85% complete. Paint- 7 May 19514 5 September 914% ing apprc.ximately 80% complete and pro- gressing favorably. Package a/c unit equip- ment arriving on job site. Further progress delayed pending availabill 9 April 19514 See remarks 6% of wc,rking space and/or OSI move. Addi- tional requirements still being received. Estimate completion of all work within 12 July 19514 15 Sept. 514 30% Barton and Curie Halle r 27 August, with excpetton of package units.scheduled to start wank of 23 AnR3istt 1951- 8 July 19514 20 August '514 90% Waiting on ehipment of sliding gates due this week --two days installation. Work progressing favorably. Color scheme, 22 June 19514 January 1955 11% floor the and decor of conference room being studied. 12 July 19511 C' mpleted 100% 6 August 195!4 Completed 16 July 19514 6 August 19514 100% 16 July 19514 Completed 100% 17 August 19514 16 July 19514 214 August 19514 20% Contractor proceeding with alterations as space is vacated. Manor alterations to start following move See remarks Not determined 0% of 00 to Quarters Fye. Tunnel project to bE started next week. Comparison of two subject as in proCS60 of (valuation. 5 August 195!4 5 Au?ust 195i, 5% All phases of work progressing satisfactor- ily. 7 May 19514 Completed 2 August 19514 1'0 10 August 1954. :See remarks !4(l Contractor working; excellent progress. Contract substantially completed. i June 1954 Appww4ror R ems 001/ > y1~r, IBg i8gt147E8ARm'Fi1 01~9~5 ~'