PROGRESS REPORT - SPECIAL PROJECTS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-04718A001000030003-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 9, 2016
Document Release Date: 
June 7, 2001
Sequence Number: 
3
Case Number: 
Publication Date: 
November 26, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78-04718A001000030003-6.pdf213.78 KB
Body: 
Approved For Release 2001/08/10 : CIA-RDP78-04718AO01000030003-6 Logistics Office Real Estate & Construction Division Space, Maintenance & Facilities Branch Pro ect PROGRESS REPONT - SPECIAL PROJECTS Estimated Estimated Completion Percent Cost Date Completed 1. Alterations - South Building $101:950. Removal and erection of partitions; provide air conditioning; increase electrical service for entire building including installation of new power panels, switches and feeder lines; special treatment in certain rooms to include wall covering, fluorescent lighting, furred ceilings, sound- proofing, wire raceways, etc.; install kitchen equipment and plumbing fix- tures in private toilet; plastering and painting. No M In Class- ^ 15 Feb-1955 22% Ument No- ------Q.23> --------- Date: --- 1Byl Aut o: Hlt 10-2 Gam's, 0tzwi ;Ed To: S (3) .1 2. Tunnel - Between Administration and $19,500 South Buildings Construct reinforced concrete tunnel connecting basements of Administration and South Buildings; relocate emergency generator and related electrical equipment; reroute utility lines; 1 Jan. 1955 55% No: 30 Date: 26 November 1954 Remarks All work in priority area No. 1 completed except for minor clean- up and installation of telephone service. Priority areas 2 and 3 are scheduled for painting the week of 29 November. Requirements for Building Receptionist's suite have been established and are being for- warded to GSA for estimate by the contractor. Upon selection of desired paneling for the DCI and DDCI Suites, PBS Group Forces will proceed to order this and other materials preparatory to commencing work; duct work for central air conditioning has been fabricated. Window type air conditioners completely installed in accessible areas, except the wiring. Plumbing work in DCI toilet and kitchen to start immediately following oc- cupancy of priority area No. 1 space by ONE. Concrete pouring of tunnel walls and roof was accomplished on 24 November; approximately 14 days will be required for proper setting before forms can be removed. At that time, the GPO operation at the South Buildi t ng unnel entrance Approved For Release 2001 -RDP78-04718A00100030003-6 Approved For Release 2001/08/10 : CIA-RDP78-04718AO01000030003-6 0C .rIDF,WTIl Page #2 Project Tunnel {cont'd) relocate toilet in Administration Building; erect partitions, plaster, paint, etc.; restore grounds, trees, shrubs, etc. Estimated Estimated Completion Cost Date 3? Renovations - East Elevator South Bu-1 *20,900. l 4. 5. Modernize cab interior; install new automatic cab and corridor doors; in- t P umbing; Painting; soundproofing; construction of security barriers and reception booths; enlargement of mail loading platforms. $75,000 (tentative) 15 April 1955 31 Jan. 1955 .1 and door grilles; electrical service; air conditioning (special areas) s all new automatic leveling and control equipment. Alterations - M & Buildings Removal and erection. of par- titions; shoring, vaulting window Utility Wirin and Curie Install 396 . receptacles; provide branch panel capacity for complete air conditioning; install 245 window and 7 package type air conditioning units. Install 300 KVA transformer and enlarge transformer vault at $71,348. 15 Dec. 1954 25X1A6a Percent Cpleted Remarks Iwill relocate to per- mitting additio unne work within South Building. Final in- spection on emergency generator installation will be made week of 29 November, allowing PBS to con- tinue with automatic changeover gear installation. 30% All phases of work on schedule; in- - stall.ation to start 2 January, or shortly thereafter, with completion by 15 April. 32% All alterations in connection with DDI move are progressing satis- factorily. Phase five of moving schedule has been completed. Three additional Job orders started during current week. Further re- novations will be delayed pending completion of barrier reception booths and turn stiles. 96% Final in s ti y Electrical service for Staff D Coxrnn0 has been made temporary available pec on of package unit installations on original contract delayed until next week. In- stallation of transformer and enlargement of transformer vault at M progressing satisfactoril Approved For Release 2001/0-RDP78-04718A001000030003-6 Approved For Release 2001/08/10 : CIA-RDP78-04718AO01000030003-6 CONFIDE \TTIA Page #3 25X1A6a Project Utility Wiring cont'd Building (To be., acccmiplished as an addition to, the initial air conditioning contract). *re Estimated Estimated Completion Percent ,Cost Date Completed Remarks pending installation of 300 KVA transformer. Bids have been.re- ceived at GSA for balance of required air conditioning equipment for Staff D. 6. Alterations - R & S Building $27,813. 29 Nov. 195+ Installation of approximately 450 lineal feet of partitions; vaulting; air conditioning; ventilation; heating; floor leveling, asphalt tile flooring, fluorescent lighting. 25X1A6a 7? Alterations - $375,000. Extensive alterations neluding erection of partitions; vaulting; soundproofing; reinforcing floors; painting; plastering; plumbing; air conditioning, etc. Approved Jan. 1955 57% Alterations and renovations, in eluding air conditioning has been completed. Inspection made by GSA Inspector 4 November reveals that miscellaneous items amounting to $100. must be accomplished before final inspection is made. Have been advised by GSA Inspector that approximately 75 percent of this work has been accomplished, expect remaining work to be completed in a few days. Erection of vault walls on 2nd floor complete. Erection of cinder block walls around air-handlers and other equipment rooms continuing, Installation of metal framework for hung ceilings on second floor continuing. Carpenters erecting stud and sheetrock partitions on first floor. Repair of windows and mechanical installations continuing. Several addendums in process of acceptance. Duct work on second floor 98 per cent complete, and in basement, approximately 35 per cent. Vault doors requisit- 441111 in July are expected to arrive For Release 2001/08/10: CI - DP78-04718A001000036b93f61rst week in December. Approved For Release 2001/08/10 : CIA-RDP78-04718AO01000030003-6 Page ## 25X1A6a 25)IA Utility Project Estimated Estimated Completion Percent Cost Date Completed *55,0009 30 Nov. 195+ tall equipment to insure satisfactory performance of heating: air conditioning., ventilating and hot water system. Main electrical breaker received this date. Proposal from Cc2nbustionaire., contractor assigned to project., past due for en- largement of transformer facilities. The lack of available heavy duty Wire is causing concern to the contractor. Approved For Release 2001/0$~ RDP78-04718AO01000030003-6