REQUEST FOR ADDITIONAL SUPPORT FOR REDESIGN AND MODIFICATION OF THE TSS HYDROGEN GENERATOR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03642A001300030039-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
May 2, 2012
Sequence Number:
39
Case Number:
Publication Date:
January 21, 1958
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 82.11 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2012/05/02 : CIA-RDP78-03642AO01300030039-2
w
CONFIDENTIAL 0
21. January 1958
M~RtAi FOR: Chief, Technical Services Staff
SUBJECT : Request for Additional Support for Redesign and
Modification of the TBS Hydrogen Generator
RHPCS : A. Memorandum dated 21 August 1957 for C/T$S,
Subject: Request for Initiation of Test
and Evaluation of Subject Generator
Be Memorandum dated 10 December 1957 for C/TSS,
Subject: Request for Extension of T&E and
for Redesign
Generator Doe I' REV DATtIT
oRIG CCMP On TYPI
CRIG CLASS ...5_ PA011 ISV CLASS s
1. Description of the Project Lusi NIXT Riv -. ~ AUTHI HR 704
This is an existing project that is concerned with the test and evalua-
tion and redesign and modification of a TSS developed Mobile Hydrogen
Generator. The generator produces hydrogen from the disassociation of
ammonia and the product gas is intended to meet the needs of Area Division
propaganda balloon operations. The test and evaluation and the redesign
and modification of the generator are well undervay. The testing un-
covered a design fault that involves high temperature metallurgy and re-
design of a basic generator part is necessary.
2. Purpose of the Project
The purpose of this part of the project is twofold. One, a contractor
that is an expert in the field of high temperature metallurgy will be
brought into the program and lend assistance to the testing group and to
the original contractor. Two, the results of this study wort will not
only be applied to the immediate redesign butt will form the basis for the
design of replacement retorts which are intended for subsequent shipment to
the generator operations site.
3. Recommended Contractor
Me recommend& contractor for this part of the wort is0
The field of high temperature metallurgy is one in
VbIGIL this organ za ion has a very high level of technical coapetance.
The testing will continue to be under the guidance of the Industrial Gas
Branch, Mechanical Division,
I. Total Cost
CONFIDFNTtAI
25X1
25X1
25)25X1
Declassified in Part - Sanitized Copy Approved for Release 2012/05/02 : CIA-RDP78-03642AO01300030039-2
Declassified in Part - Sanitized Copy Approved for Release 2012/05/02 : CIA-RDP78-03642AO01300030039-2
w
CONFIDENTIAL
Support Requirements
Liaison vill be maintained for the testing and with
when ownership transfer of the generator takes place.
6. Project Engineer
The project engineer for this program is
West Outbuilding.,
7. Security Inforsation
Chief
8/Engineering Division
DD/P/T8S/ED
Distribution:
Orig - ED-139 when ret'd from C/ma
1 -= File
1 - ED Chrono
CONFIDENTIAL