REQUEST FOR ADDITIONAL WORK UNDER TASK I OF CONTRACT RD-155 WITH (SANITIZED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03642A001200020026-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 10, 2011
Sequence Number: 
26
Case Number: 
Publication Date: 
May 8, 1959
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03642A001200020026-8.pdf148.78 KB
Body: 
Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642AO01200020026-8 ILLEGIB Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642AO01200020026-8 Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642AO01200020026-8 File: C-379 gay 5, 1959 Bubject: Contract No. 0-155 During a conference with the custaerer's project engineer on 28 April 1959, this contractor was requested to suboit a proposal covering the cost of converting the aft door of a C-54 aircraft to serve as a lick-out door in cojunatiGn with the forward aircraft door prs- viously designed and built by this conpatoy under Task Order Ao. 1 of the subject contract. A set of C-54 doors t5oa which the proposed revision was to be accaaplished was delivered to this contractor on 29 April 1959. Upon inspection it was discovered that the aft door had previone3y been aodtfied to incorporate a 001-UST' inwardly opening door. This informa- tics was conveyed to the custaaer's project engineer by telephone on 30 April 1959. Subsequiestly, this contractor was instructed to proceed with the eaditications in the following manner: a. Leave the sting weather seals intact and make the inner door integral with the reminder of the aft door. b. No additional seal need be provided on the outside at the Juncture of the inner and outer aft doors. e. Incorporate an easrgency handle in the aft door for releasing the hinge Plus and the locking dogs. The eaargency handle is to be ind~psodeat at the door operating handle. d. Use parts from either of the doors furnished as necessary to expedite the modification. Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642AO01200020026-8 Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642AO01200020026-8 7,71 Page 2 - Letter 59075/C-379, Dated llsy 5, 1959 Too Subject: Contrast lo. 1W 155 ? . . . ? ? ? ? . ? 0 ? o This contractor's proposal to acconplish the requested modification in the reamer outlined above on a Cost-Plus-Fired-pee basis is as follows: Furnish labor and materials required to convert a C-54 aircraft aft door to a hinged inwardly opening door, be the existing inner door in the aft door integral with the aft door, provide an emergauay baedle systs for the aft door, and install the converted door in a C-54 aircraft. Total Estimated Cost . . . . . . ,2449.28 Fixed Fee. . . . . . . . . ? . 787.00 CM . . ? . ? ? ? ? ? ? ? ? ? . X12,036.28 It is estimated that the proposed modification can be com- pleted by 21 My 1959, provided that immediate authorization is received to utilize overtime hours as required. Installation of the converted door can be acccaplishsd within tour days after a C-54 aircraft is made available. We request that a Charge 33rder authorizing this work, and the necessary overtime authorization, be furnished as promptly as possible. eery truly yours, TJR/jf closures 2 copies Cost Analysis El'-3006.08 Copy to: (v/3, copy of encl.. ) Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642AO01200020026-8 Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642AO01200020026-8 DOLLARS Mft t" Ib ?~ Rote EP -food . 0 8 0009-ff OW I,iir4W/Jww of EL EMIT 1 MRA. & RATE n..ring Labor His. $yp Raft .0-. me Engin..ring Ov.rh.ed Rete 1,0 % 7 e Manufacturing Labor R , Manufacturing Overhead Rat. /1t ?' Hrs. Rote Tool Overhead I Rate Cost Excluding G&A G A Total Estimated Cost $r F F PFF s1we aR-a Hrs. Ret. L RATE Hrs. Res. 2'~140 1 Raft i p :?&V His. Rat* We. Rate Hrs. Rote e1T0. Al Rot. Hrs. Rate Hrs. Rot. V* S. Rate Extended Price or CPFF Submitted to !-pared by :ngineering Approval _ customer's Prop. Ref. ~cked by Manufacturing Approval AAlnc. Prop. Letter - Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642AO01200020026-8 ,25X1 Date