TASK ORDER NO. 2
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03642A001200010013-3
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
5
Document Creation Date:
December 22, 2016
Document Release Date:
May 9, 2011
Sequence Number:
13
Case Number:
Publication Date:
February 3, 1959
Content Type:
LETTER
File:
Attachment | Size |
---|---|
CIA-RDP78-03642A001200010013-3.pdf | 319.2 KB |
Body:
Sanitized Copy Approved for Release 2011/05/09: CIA-RDP78-03642AO01200010013-3
(AE'e;691 D; S PATC y Sys.)
56402/C-379
STAT
February 3, 1959
STAT
Subject: Task Order No. 2
Enclosed are two copies of Progress Report No. 3 which sum-
marizes the action taken on the subject Task Order during the period
from 20 December 1958 through 20 January 1959?
Also enclosed is a copy of the Project Fiscal Report as of
31 December 1958?
Very, truly of rs,-
STAT
TJH/jf
Enclosures:
(A) Progress Report No. 3 (2 pgs) 2 copies
(B) Project Fiscal Report (Task 2, 1 pg) 1 copy
(Task 1 & 2 total, 1 pg) 1 copy
Copy to: Contracting Officer
(w/1 copy of enclosures)
Sanitized Copy Approved for Release 2011/05/09: CIA-RDP78-03642AO01200010013-3
Sanitized Copy Approved for Release 2011/05/09: CIA-RDP78-03642AO01200010013-3
L-379 - TASK ORDER NO. 2
PAGE NO. 1 of 2
REPORT NO.
1. At a meeting between the Government Project Engineer and
on January 13, 1959, at which time the existing con=
veyor was use o es various size cartons and pallets, the following
a. The conveyor should be made to accounodate both the
37" door and the 55" door.
b. The exit direction should be 900, or nearly 900, in
order to utilize the maximum door width.
c. Tapered rollers with serrations aid/or skate wheels
should be used to aid in making the pallets track.
d. The inside rail should be the minimum size possible,
except that the existing rail should be used if possible.
e. There is no weight requirement for this revised system.
A final design will be made with weight saving as the prime objective after a
feasible conveyor system is demonstrated.
f. Existing parts are to be used where possible.
g. Revise two (2) 10' conveyor sections only with rollers at
4" pitc to accommodate a 17 x 17 pallet or a package weight increase from
65 4 to 1300#. These two 10' sections should be adjustable in an inboard-
outboard direction.
h. Maximum adjuatability and minimum installation time
i. The speed requirement of the boxes is changed from
30 mp?, to 10, mph raxirawn.
J. The rails are to be spread to the maximum practical,
k. The inner rail should be adjustable.
1. Add more bevel to the leading edge of the brakes. Add
bevel to the trailing edge of brakes for loading.
m. A new brake (or brakes, if more than one idea seems
i ractical) in the standard roller section of the conveyor.
n. Add a return pedal on the transition area brake
STAT
Sanitized Copy Approved for Release 2011/05/09: CIA-RDP78-03642AO01200010013-3
Sanitized Copy Approved for Release 2011/05/09: CIA-RDP78-03642AO01200010013-3
C-379 - TASK ORDER NO. 2
PAGE NO-2 of 2
REPORT NO. $
a. I-love the bottom of the aft vertical roller or otherwise
protect against jamming of the cartons.
p. Add latches to the vertical (door) rollers to prevent
excessive motion during operation.
as practical.
c. Keep the center glade rail, but make it as adjustable
r. Add flares to the guide rails in the entry area.
s. The maximum pallet width is changed to 31". This is
for two 15" x 60" boxes side by side on the box edges, plus 1" for ropes.
Normal pallet size will be 17" x40".
t. Add a latch between the vertical rollers to form a gate
for the protection of operating personnel.
u. A pencilled sketch of the "Dispatching Possibilities"
left by the customer is to be supplemented by measurements taken from pallets
and cartons which were left by the customer.
Action Required:
was requested to prepare a pro-
posal incorporating the above changes into a "Revised Conveyor". The object
of thin program is to determine a feasible and practical conveyor. This pro-
posal has been prepared and will be delivered to the customer at the proposed
meeting on January 29, 1959.
Prepared by -
STAT
Sanitized Copy Approved for Release 2011/05/09: CIA-RDP78-03642AO01200010013-3
:)ORS PROJECT FISCAL A PORT
Project Manage
Account
A unt Name Number
St
t
om
m
m
ents
To
Dat
e
Ca
n la
te
C
a
m
lo
tion
ruc
ures 9111.11
E.M. s.Desi n 9111.21
X2.
0
3G
o
0
0
E
M
Mach
Desi
n 9111
22
.
.
.
g
.
Electronics s 9111
31
.
Electron
Mech
9111
32
.
.
.
Nuclear Ener
9111
41
gy
.
Ordnance 9111
51
.
Engr.Services 9211.61
3G
G
734,
Aerodynamics 9111
71
.
Tool En
r
9111
81
g
.
.
Pro
Su v
9111
91
.
.
.
Eng
Labor 9111
f
G
G
3 y
c
.
r
r
c
/
ce
Mechanical 9112.11
Electronic 9112.21
'II
G
C~
G
i
~~
Ins
e
ti
9112
1
p
c
on
.3
Mfg. Labor 9112
Total Labor 911
CG
:
t
`
173 d
7;T
9
Structures 9111.11
E," S s.Desi n 9111.21
3
E....Mech.Design 9111.22
Electronics _111.31
Electron.Mech. 9111.32
D
Nuclear Energy 9111.41
Ordnance 9111.51
Engr.Services 9111.61
/
fp
/
3r
j
O
Aerodynamics 9111.71
Tool Engr. 9111.81
Pro . Su v. 9111.91
~i
o
i
!~, r
yv
Eng.Labor
J
Z
c
Y
4
3 !
it
L
Mechanical 9112.11
Electronics 9112.21
yb
3
F,14
4 Y
c
G
?
Ina ction 9112.31
Mf .Labor 9112
f?
3
r
t
3
S
4 ~-
r
> 6
'A
loe
3
L
Total Labor 911
Y
bti
-
5
S~
~y
yb
a
~/
M&PP 9123
Sub.Contract 9124
ODC 9125
/
f
Y
20
v
z ~
t
lyc
o6
y
ESL
o%
?
Tot.Direct 911&912
13
/d
c
? ;
cc
io
O
R
Eng. O /H 9136
-l
-20
o
6
r
~y
y
Mf.OH 9137
?Y
cc
13 01
G&A O H 9138
2
~
!
Z
o
2
64D
S
FTC 91
G
r6
/o
/if
a
3
c
7o
Z
T CHANGES/PROPOSALS INC. IN
ESTIMATED COST
.Q ,BRA.
,
r^
SCHEDULE COMPLETION DATE
Sanitized Copy Approved for Release 2011/05/09: CIA-RDP78-03642AO01200010013-3 TASK 2
Dates 1::-X )
Paid Paid Open Committed
End Prior Current Purchase Costa
Month Month C
it
Contract No.
Work Order No.
Estimated
Cost To
STAT
Estimated
Coate At
STAT Cr
Sanitized Copy Approved for Release 2011/05/09: CIA-RDP78-03642AO01200010013-3
Sanitized Copy Approved for Release 2011/05/09: CIA-RDP78-03642AO01200010013-3
lCilai:~1
ENS I TLZi AIRCRAFT ' C
Project Manager
PROJEOT FISCAL REPORT
Dates 12-31-58
Paid Paid Open Committed
Account End Prior Current Purchase Costs
Acc...,nt Name Number Month Month Commitments To Date
Structures 9111.11
1/7
a
?? nr
-.r
C...
E.M. s.Des n 9111.2
E.M.Mach.Design 9111.22
/
a
v
O
Electronics s 9111.31
0
3
0
ELectron.Mech. 9111.32
-
Nuclear Energy 9111.41
-
Ordnance 9111.51
7/
O
Bagr.Services 93-11.61
/4
',
/
Z
'
Aerodynamics 9111.71
0
0
Tool Engr. 9111.81
0
Pro .Su v. 9111.91
3S9
0
/
D
d
Eng.Labor 9111
z
U?
o
7I
Mechanical 9112.11
/
Z t c
0
a
-&
A#2
i
Electronic 9112.21
-
Inspection 9112.31
-
o
i
Mfg, Labor r-)112
i
z88
7,
8~
5~
70
:Z
IN
Total Labor 911
121
1 7-
?
S4
4
.6
1,3
D
2
S '" ture8 7M.11
?3 81
2 S
~~ 7
/-1-
644
_7502/55F-J
,
1. s.Desi n 9111.21
-
E M Mech.Desi n 111.22
Electronics Si. a 9111 1
/c
L o
-Ac tl
ELectron.Mech. 9111.32
Nuclear Energy 9111.41
Ordnance 9111.1
Engr.Services 9111.61
W
00
5 6
y
&2 -
?
4!
SS
t
2
?
474
Y o
4
f
,r
Aerodynamics 9111,71
3 Z-
3
Tool Engr. 9111.1
Pro .Su V. 9111.91
'To
00
3 y
y
ko
Z
Eng.Labor 9111
l/
,7
5 2.4
3
500
W
y
67
Mechanical 9112.11
3
H7
9
9
'' -
s3
d
?d
Electronics 9M.21
Inspection 9112.31
-
-7/
2
1 -10
-0
-0
L
Mfg.Labor
70
6
9/
G i
Total Labor 911
437
Z2-
11
S
3 ~l
5 o y
S
;
M&PP 9123
2-
3 &
19 6
3
711
O
OrV
?`~
a.
Sub.Contract 9124
'
16
2q
4
o Q
63i
Y
ODC 12
rz/
z7
a3
144
Tot Direct 911&912
/
Z 2 1
6 /
r
a 3
9f,
15415
31
WA
. O /H 9136
9.
If Z-4
Lt
2
Soc
33
/
GAG
Sy
,
Mfg. 0 H 9137
121 a
L6jL
6-Z
G&A 0 H 9138
d/
Z to
s~ 7
s t
U
7
u.al 91
/2g
1/3 77
10
W7
US
CONTRACT CHANGES/PROPOSALS INC. IN ESTIMATED COST A AS 1 - TASK l y ` -*
Oi?XTK GC @itt~tiiti; I14 11L~OltE iii } P1(I JAjyC I ~- Z
SCHEDULE COMPLETION DATE ~- 5~ ~t 4
.%=URC PauCI cP & 41 7 ..Cy ll Q 99.4 7 /7a .g 714
_ Sanitized Copy Approved for Release 2011/05/09: CIA-RDP78-03642AO01200010013-3 x,,
7
Work Order No.
I STAT_J
Estimated Estimated
Cost To Costs At
C lets C etion
Contract No.