CONTRACT RD-79, T.O. 7
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03424A000500120043-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
20
Document Creation Date:
December 22, 2016
Document Release Date:
April 11, 2012
Sequence Number:
43
Case Number:
Publication Date:
September 10, 1957
Content Type:
LETTER
File:
Attachment | Size |
---|---|
CIA-RDP78-03424A000500120043-8.pdf | 685.59 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
U- UNHAN 1i L
September 10, 1957
Re: Contract RD-79, TO. 7
?
0
?
0
This letter, together with attachments, constitutes
our proposal for increased scope involving Phase B and E of
T.O. 7 of Contract RD-79. The estimated cost, price and fixed
fee are an follows:
Phase B
Phase E
Estimated Cot
Fined Fee
Estimated Price
56,48 25X1
5,805.00
It is requested that the contract date be extended to
December 15, 1957 to permit completion of the proposed work.
This date is predicated upon receiving transistor amplifiers
from the client on or prior to October 1, 1957, and additional
GFE equipment as follows:
Hewlett-Packard Generators Model 608C
612A
In the event during system tests, y stem 4y+etee will not
operate due to cables built to client's specifications or to
GFE operation, contractor cannot assume responsibility for
repair of these items. If the design is fundamentally wrong,
contractor will attempt to ascertain the correction or change
required and will furnish this information to the client
Yours very truly,
Bpi
CONFIDENTIAL
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
J'1 AI t 1__rAI . I a a
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
COST
PROPOSED CITANGE
BREAKDO'VN*
IN SCOPE OF PHASE B
OF TA
SK ORDER 7
S
, 1757
0
Engineer
140 hrs.
Engineering Assistant
360 hrs.
Engineering Assistant
300 hrs.
?
Draftsman
40 hrs.
?
0
TOTAL DIRECT LABOR AND OV
OTHER DIRECT COSTS
Reproduction and Photographs
TOTAL ESTIMATED COST
TOTAL ESTIMATED PRICE
* Figures rounded to nearest dollar
C.E1 DENTIAL
$6,486.00
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
I
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
COST BREAKDOWN*
TO
SEP~ 0,"1957
Engineer 40 hrs.
Engineer 300 hrs.
Draftsman 300 hrs.
TOTAL DIRECT LABOR AND OVERHEAD
OTHER DIRECT COSTS
Reproduction
TOTAL ESTIMATED COST
TOTAL ESTIMATED PRICE $5,805.00
* Figures rounded to nearest dollar
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
TECHNICAL INFORMATION MEMORANDUti
CMGE IN SCOPE M PHASE B OF
s 957
The increased scope of the work under Phase B consists
?
of two general areas of effort:
1.
Determination of Filter-Detector Combination
?
Bandpass Characteristics,
2.
Amplification of System Tests
0
0
In the course of development and production of the CS-3,
and CS-3A systems, changes were made in requirements necessi-
tating changes in-the systems. It now seems desirable to
furnish a more thorough system test than originally antici-
pated.
1. Determination of Filter-Detector Combination Band-
Pass Characteristics for Bands A, B, C. and D.
Under Task Order 5, per-
formed measurements on filter-detector band-
pass characteristics. On the basis of results,
it was decided to use bias on the detector.
With bias the bandpass characteristic will be
different, and new measurements will be required.
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11 : CIA-RDP78-03424A000500120043-8
?
?
?
0
One filter for each band will be measured in
combination with one crystal detector. Ten
frequencies per band will be measured. The
data will be submitted in graph form. In
addition, two filters will be spot checked
with two different crystal detectors.
2. Amplification of System Tests
The CS-3A system will be set up in the
laboratory utilizing cables constructed for
the system at their maximum length. The tests
to be performed will be comprehensive com-
pared to those called for under the original
scope of Phase B.
Signal inputs will be applied directly
to the filters for bands A, B, C, and 0,
using GFE signal generators listed in the
attached letter. For band E, the generator
will feed the detector assembly as no filter
exists. Sensitivity measurements will be made
to determine 10% and 100% recording level
requirements (recording level voltages to be
furnished by the client).
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
?
?
?
0
Two filters of each type, with each of two
different detector assemblies will be measured
at three frequencies per band (10% above low
frequency cut off, center frequency, and 10%
below high frequency cutoff). For band E,
measurements will be made as above with two
detector assemblies feeding the generator
directly into the detector. One filter detec-
tor combination will be checked at low, cen-
ter, and high DC power voltage.
Tests will be made to determine if, in
conjunction with the system, the VA-5 amplifier
performs to its specifications. For this test,
between six and ten amplifiers will be inves-
tigated to assure results based on sufficient
sampling.
The system will be tried with at least
two recorders, two different power supplies,
and two activity amplifiers. A suitable way
of performing this will be to freeze all var-
iables, replace the equipment, then check to
see if there is a variation in operation.
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
F-) F-
all
The complete system test will be made
using half of a dual rack assembly. Con-
tractor feels that no interference problems
will arise when the other half of the rack
is placed into operation.
In general, all tests will be made with
a 2 usec pulse at 1000 cps, generators per-
mitting. Spot checks will be made at rates
of 30 cps. and 6000cps.
The CS-3 system is identical to the
CS-3A except in cabling and in the number
of power supplies. The use of two supplies
versus one should not affect sensitivity
results. For this reason, the complete tests
will not be run on the CS-3 system. The sys-
tem will be set up and spot measurements made
to determine if the system operates the same
as the CS-3A system.
The Test Bench Junction Box System will
be tested in the same manner as the CS-3 Sys-
tem.
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
TECHNICAL INFORMATION MEMORANDUM
FM P'RMSED MUSE I
tW T= mm 7
S 3?
propose to prepare an installation
?
manual for the CS-3 and CS-3A (Dual and Single Rack). A pre-
liminary outline for the manual is attached.
have been designing and manufactur-
system. At this time, it seems advisable for
ing components of the CS-3 and associated systems. However,
the company has been involved only with component parts of the
to amplify the scope of the work to prepare interconnect.
?
ing block diagrams and schematics for the systems, and to pre-
pare information for the installation and test of the systems.
Changes in the system during the design and manufacturing.
stages have made obsolete many of the drawings and information
prepared by the client. In addition, information is lacking
on the actual installation of the operating systems and on
the use of the Test Bench Junction Box System.
It is also proposed that check
existing client drawings to insure that they includ* changes
made in the system after preparation of the drawings.
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
The preparation of the installation manual will be pat-
terned after the attached outline. Extensive use will be made
of drawings and photographs to enable the user to most expedi-
tiously install and test the equipment.
The section of the manual on the installation of the
? CS-3A system will be more comprehensive than the section on
? the CS-3 system. There are only a few basic differences
between the systems and for this reasons, much of the infor-
mation on the CS-3A will be applicable to the CS-3 system.
A section will be included showing the interconnection
of the Test Bench Junction Box System. An explanation of the
capabilities of the Test Bench Junction Box and its instru-
mentation will be given.
0
under the existing contract sufficient to permit reordering
of any item constructed by The infor-
mation is complete and will permit construction by any com-
pany. However, the drafting information is on particular
items and does not cover assembly of any two items (i.e., a
has prepared drafting information
cable and a panel.)
proposes to work
with the clients representative to supply additional infor-
nation required for reordering of system assemblies.
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
25X1
All material furnished will be in the form of one copy
which way be reproduced, and one blueline copy.
0
?
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11 : CIA-RDP78-03424A000500120043-8
OUTLINE OF INFORMATION TO BE
]INCLUD IN AL
?
?
1. CS-3A System
A. Description of System
1. Electrical Functions
2. Physical Layout
B. Equipment Lists
1. Equipment Furnished with System
2. Equipment Required But Not Furnished With
System
C. Specifications
1. Frequency Range
2. Type of Received Signal
3. Signal Sensitivity
4. Input Power
5. Size
6. Weight
?
?
D. Installation
1. Mounting Racks to Frame
2. Installing Units in Rack
3. Installing Cables
II. CS-3 Dual Rack System
A. Description of System
1. Electrical Functions
2. Physical Layout
B. Equipment Lists
1. Equipment Furnished with System
2. Equipment Required But Not Furnished With
System
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
0
?
II. CS-3 Dual Rack System (cont.)
C. Specifications
1. Frequency Range
2. Type of Received Signal
3. Signal Sensitivity
4. Input Power
5. Size
6. Weight
D. Installation
1. Mounting Racks to Frame
2. Installing Units in Rack
3. Installing Cables
III. CS-3A Single Rack System
Description of System
1. Electrical Functions
2. Physical Layout
B. Equipment Lists
1. Equipment Furnished with System
2. Equipment Required But Not Furnished with
System
?
?
C. Specifications
1. Frequency Range
2. Type of Received Signal
3. Signal Sensitivity
4. Input Power
5. Size
6. Weight
D. Installation
1. Mounting Racks to Frame
2. Installing Units in Rack
3. Installing Cables
IV. Test Bench Junction Box System
A. Description of System
1. Electrical Functions
2. Physical Layout
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8
117. `scat Tench Ji.p-lete system with
apparatus recently developed b7 other contractors; to date nedae if
design deficiencies exist and to make recommory modifications before
releasing the sy9stemle for field me.
3. The proposed installation aswnl, when associated with the
instruction books furnished by other contractors sapely'ing systeri
unite, will provide a clear and effective aide: for techni cai
per'soaels especially those in a mad-skiUmd cspercity. Ft 1assures
the contractor has been segnested to add a section. under 111 E
entitled "Operatics". This section intended only to corer the
minisure requirsaeats usoes awy to plans the egaipeat in operation
and to define control functions not otherwise described.
h. It is rid that the sllotssat number, to
cover the retest for additional founds, be furnished this Division
in order to date the necessary contractual me?atiatiosls as soon
as possible. The contractor is ready to proceed on the increased
scope and proposed Phase g lasadiatel,T, and with the crapletion of
this portion of the indicated task, this work may be brought to a
chub.
MSB
OC-E Chrono
R&D Chrono
EP Chrono
OC-E/ D-EP/LSG:mjr (12 Sept. 57)
cc-R&D Subject File
SECRET
DOC l REV DATE
A
i "o
eT
G
O
33
5
6
&
2
DPI
ORIG COMP 0
TYPE
F
10
-
ORIG CLASS 'S PAGES L_ REV CLASS
JUST -AZ-26-___ NEXT REV 0:~L_/a RUTH: HR 10.2
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8