CONTRACT RD-79, T.O. 7

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03424A000500120043-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
20
Document Creation Date: 
December 22, 2016
Document Release Date: 
April 11, 2012
Sequence Number: 
43
Case Number: 
Publication Date: 
September 10, 1957
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78-03424A000500120043-8.pdf685.59 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 U- UNHAN 1i L September 10, 1957 Re: Contract RD-79, TO. 7 ? 0 ? 0 This letter, together with attachments, constitutes our proposal for increased scope involving Phase B and E of T.O. 7 of Contract RD-79. The estimated cost, price and fixed fee are an follows: Phase B Phase E Estimated Cot Fined Fee Estimated Price 56,48 25X1 5,805.00 It is requested that the contract date be extended to December 15, 1957 to permit completion of the proposed work. This date is predicated upon receiving transistor amplifiers from the client on or prior to October 1, 1957, and additional GFE equipment as follows: Hewlett-Packard Generators Model 608C 612A In the event during system tests, y stem 4y+etee will not operate due to cables built to client's specifications or to GFE operation, contractor cannot assume responsibility for repair of these items. If the design is fundamentally wrong, contractor will attempt to ascertain the correction or change required and will furnish this information to the client Yours very truly, Bpi CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 J'1 AI t 1__rAI . I a a Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 COST PROPOSED CITANGE BREAKDO'VN* IN SCOPE OF PHASE B OF TA SK ORDER 7 S , 1757 0 Engineer 140 hrs. Engineering Assistant 360 hrs. Engineering Assistant 300 hrs. ? Draftsman 40 hrs. ? 0 TOTAL DIRECT LABOR AND OV OTHER DIRECT COSTS Reproduction and Photographs TOTAL ESTIMATED COST TOTAL ESTIMATED PRICE * Figures rounded to nearest dollar C.E1 DENTIAL $6,486.00 Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 I Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 COST BREAKDOWN* TO SEP~ 0,"1957 Engineer 40 hrs. Engineer 300 hrs. Draftsman 300 hrs. TOTAL DIRECT LABOR AND OVERHEAD OTHER DIRECT COSTS Reproduction TOTAL ESTIMATED COST TOTAL ESTIMATED PRICE $5,805.00 * Figures rounded to nearest dollar Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 TECHNICAL INFORMATION MEMORANDUti CMGE IN SCOPE M PHASE B OF s 957 The increased scope of the work under Phase B consists ? of two general areas of effort: 1. Determination of Filter-Detector Combination ? Bandpass Characteristics, 2. Amplification of System Tests 0 0 In the course of development and production of the CS-3, and CS-3A systems, changes were made in requirements necessi- tating changes in-the systems. It now seems desirable to furnish a more thorough system test than originally antici- pated. 1. Determination of Filter-Detector Combination Band- Pass Characteristics for Bands A, B, C. and D. Under Task Order 5, per- formed measurements on filter-detector band- pass characteristics. On the basis of results, it was decided to use bias on the detector. With bias the bandpass characteristic will be different, and new measurements will be required. Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 Declassified in Part - Sanitized Copy Approved for Release 2012/04/11 : CIA-RDP78-03424A000500120043-8 ? ? ? 0 One filter for each band will be measured in combination with one crystal detector. Ten frequencies per band will be measured. The data will be submitted in graph form. In addition, two filters will be spot checked with two different crystal detectors. 2. Amplification of System Tests The CS-3A system will be set up in the laboratory utilizing cables constructed for the system at their maximum length. The tests to be performed will be comprehensive com- pared to those called for under the original scope of Phase B. Signal inputs will be applied directly to the filters for bands A, B, C, and 0, using GFE signal generators listed in the attached letter. For band E, the generator will feed the detector assembly as no filter exists. Sensitivity measurements will be made to determine 10% and 100% recording level requirements (recording level voltages to be furnished by the client). Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 ? ? ? 0 Two filters of each type, with each of two different detector assemblies will be measured at three frequencies per band (10% above low frequency cut off, center frequency, and 10% below high frequency cutoff). For band E, measurements will be made as above with two detector assemblies feeding the generator directly into the detector. One filter detec- tor combination will be checked at low, cen- ter, and high DC power voltage. Tests will be made to determine if, in conjunction with the system, the VA-5 amplifier performs to its specifications. For this test, between six and ten amplifiers will be inves- tigated to assure results based on sufficient sampling. The system will be tried with at least two recorders, two different power supplies, and two activity amplifiers. A suitable way of performing this will be to freeze all var- iables, replace the equipment, then check to see if there is a variation in operation. Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 F-) F- all The complete system test will be made using half of a dual rack assembly. Con- tractor feels that no interference problems will arise when the other half of the rack is placed into operation. In general, all tests will be made with a 2 usec pulse at 1000 cps, generators per- mitting. Spot checks will be made at rates of 30 cps. and 6000cps. The CS-3 system is identical to the CS-3A except in cabling and in the number of power supplies. The use of two supplies versus one should not affect sensitivity results. For this reason, the complete tests will not be run on the CS-3 system. The sys- tem will be set up and spot measurements made to determine if the system operates the same as the CS-3A system. The Test Bench Junction Box System will be tested in the same manner as the CS-3 Sys- tem. Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 TECHNICAL INFORMATION MEMORANDUM FM P'RMSED MUSE I tW T= mm 7 S 3? propose to prepare an installation ? manual for the CS-3 and CS-3A (Dual and Single Rack). A pre- liminary outline for the manual is attached. have been designing and manufactur- system. At this time, it seems advisable for ing components of the CS-3 and associated systems. However, the company has been involved only with component parts of the to amplify the scope of the work to prepare interconnect. ? ing block diagrams and schematics for the systems, and to pre- pare information for the installation and test of the systems. Changes in the system during the design and manufacturing. stages have made obsolete many of the drawings and information prepared by the client. In addition, information is lacking on the actual installation of the operating systems and on the use of the Test Bench Junction Box System. It is also proposed that check existing client drawings to insure that they includ* changes made in the system after preparation of the drawings. Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 The preparation of the installation manual will be pat- terned after the attached outline. Extensive use will be made of drawings and photographs to enable the user to most expedi- tiously install and test the equipment. The section of the manual on the installation of the ? CS-3A system will be more comprehensive than the section on ? the CS-3 system. There are only a few basic differences between the systems and for this reasons, much of the infor- mation on the CS-3A will be applicable to the CS-3 system. A section will be included showing the interconnection of the Test Bench Junction Box System. An explanation of the capabilities of the Test Bench Junction Box and its instru- mentation will be given. 0 under the existing contract sufficient to permit reordering of any item constructed by The infor- mation is complete and will permit construction by any com- pany. However, the drafting information is on particular items and does not cover assembly of any two items (i.e., a has prepared drafting information cable and a panel.) proposes to work with the clients representative to supply additional infor- nation required for reordering of system assemblies. Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 25X1 All material furnished will be in the form of one copy which way be reproduced, and one blueline copy. 0 ? Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 Declassified in Part - Sanitized Copy Approved for Release 2012/04/11 : CIA-RDP78-03424A000500120043-8 OUTLINE OF INFORMATION TO BE ]INCLUD IN AL ? ? 1. CS-3A System A. Description of System 1. Electrical Functions 2. Physical Layout B. Equipment Lists 1. Equipment Furnished with System 2. Equipment Required But Not Furnished With System C. Specifications 1. Frequency Range 2. Type of Received Signal 3. Signal Sensitivity 4. Input Power 5. Size 6. Weight ? ? D. Installation 1. Mounting Racks to Frame 2. Installing Units in Rack 3. Installing Cables II. CS-3 Dual Rack System A. Description of System 1. Electrical Functions 2. Physical Layout B. Equipment Lists 1. Equipment Furnished with System 2. Equipment Required But Not Furnished With System Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 0 ? II. CS-3 Dual Rack System (cont.) C. Specifications 1. Frequency Range 2. Type of Received Signal 3. Signal Sensitivity 4. Input Power 5. Size 6. Weight D. Installation 1. Mounting Racks to Frame 2. Installing Units in Rack 3. Installing Cables III. CS-3A Single Rack System Description of System 1. Electrical Functions 2. Physical Layout B. Equipment Lists 1. Equipment Furnished with System 2. Equipment Required But Not Furnished with System ? ? C. Specifications 1. Frequency Range 2. Type of Received Signal 3. Signal Sensitivity 4. Input Power 5. Size 6. Weight D. Installation 1. Mounting Racks to Frame 2. Installing Units in Rack 3. Installing Cables IV. Test Bench Junction Box System A. Description of System 1. Electrical Functions 2. Physical Layout Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8 117. `scat Tench Ji.p-lete system with apparatus recently developed b7 other contractors; to date nedae if design deficiencies exist and to make recommory modifications before releasing the sy9stemle for field me. 3. The proposed installation aswnl, when associated with the instruction books furnished by other contractors sapely'ing systeri unite, will provide a clear and effective aide: for techni cai per'soaels especially those in a mad-skiUmd cspercity. Ft 1assures the contractor has been segnested to add a section. under 111 E entitled "Operatics". This section intended only to corer the minisure requirsaeats usoes awy to plans the egaipeat in operation and to define control functions not otherwise described. h. It is rid that the sllotssat number, to cover the retest for additional founds, be furnished this Division in order to date the necessary contractual me?atiatiosls as soon as possible. The contractor is ready to proceed on the increased scope and proposed Phase g lasadiatel,T, and with the crapletion of this portion of the indicated task, this work may be brought to a chub. MSB OC-E Chrono R&D Chrono EP Chrono OC-E/ D-EP/LSG:mjr (12 Sept. 57) cc-R&D Subject File SECRET DOC l REV DATE A i "o eT G O 33 5 6 & 2 DPI ORIG COMP 0 TYPE F 10 - ORIG CLASS 'S PAGES L_ REV CLASS JUST -AZ-26-___ NEXT REV 0:~L_/a RUTH: HR 10.2 Declassified in Part - Sanitized Copy Approved for Release 2012/04/11: CIA-RDP78-03424A000500120043-8