RD-107 T.O. 4, VLF ANTENNA STUDY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03424A000500010013-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 22, 2016
Document Release Date: 
July 31, 2012
Sequence Number: 
13
Case Number: 
Publication Date: 
September 20, 1956
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03424A000500010013-3.pdf59.12 KB
Body: 
Declassified in Part- Sanitized Copy Approved forRelease-2012/07/31 : CIA-RDP78-03424A000500010013-3 -?"`""mtONFIDENTIAL. Office Memorandum ? UNITED STATES GOVERNMENT 25x, MP ? ????????????? ???????? ?????? ????? To : The Files (Trip Report) FROld SUBJECT: (rD-107 T.O. 4, VLF Antenna Study) DATE: 20 September 1956 ?1117:4-1-7- REV DATE _woo_ 1 ApR eye?yfie ORIG COMP 11,3._ OPI TYPECZ_ ORM CLASS PAGES REV CLASS JUST NEXT REV .0-40/0 AUTHi HI 114 1. On 17 September 1956 a meeting was held at the 25X1 25X1 25X1 at Present were: he 2. The contractor is attacking the design problem on two fronts: is making an analytical comparison of the three designs suggested in his proposal and at the same time he is building a model of the design with separate antennas and separate isolation stages. 3. The contractor is making progress with this model. The standard test field has been in operation for two weeks and has been used in de- termining optimum ferrite materials and dimensions. Results of this program have indicated that unloaded Ws of 140 can be obtained. Since the loaded Q will be approximately 100 the current design calls for a ten element matrix. A test panel containing ten isolation amplifiers and the summation amplifier is being constructed. The contractor has indicated that the delivered antenna will use a ferrite prepared in the laboratory with characteristics estimated to be twice as good as production quality ferrites. As a result duplicates of the delivered item will be abnormally expensive. 4. The contractor expects to freeze the design in two weeks and estimates that delivery can be made by 1 November 1956. 5. It has been agreed that it would be useful to have a standard of comparison for antennas at very law frequencies. It has been decided that the air core loops currently in use by the Supplemental Programs Division will be tested in the standard field at the , A trip is being arranged for and or the SP Division the week of September 24 to cooperate in these tests. CONFIDENTIAL 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/07/31 : CIA-RDP78-03424A000500010013-3