REQUEST FOR CPFF TASK-TYPE CONTRACT NEGOTIATION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03330A004200080006-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 27, 2016
Document Release Date: 
May 8, 2014
Sequence Number: 
6
Case Number: 
Publication Date: 
June 10, 1960
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03330A004200080006-7.pdf159.2 KB
Body: 
? l"r1 it I Declassified in Part - Sanitized Copy Approved for Release 2014/05/08: CIA-RDP78-03330A004200080006-7 %/WS SA '? !? Director of Logistics Director of Communications Request for CPFF Task-Type Contract Negotiation 10JUN 1960 Oc-(4'3, / mcr-YraO I/VS ?.F 4411 Z.7 111.1 1. The Office of Communications is sponsoring the development of an automatic agent set, AS-3, and has requirements for the design and development of two AC power supplies for this equipment designated AP-3. and PS-10. 2. Proposals for these equipments, in accordance with Specification No. 60-A-1116-A, were requested from three contractors. One contractor did not elect to submit a proposal and of the, two contractors who sub- mitted proposals, 50X1 has been Chosen. The proposal has been reviewed by our Engineering 50X1 Staff and is considered acceptable as amended by Attachment A. These amendments have been discussed with and they are acceptable to 50X1 the contractor. 3. Accordingly, it is requested that a contract be negotiated with in accordance with their proposal, 50X1 as amended by Attachment A, and Specification No. 60.A-1116-A. For warded for this purpose is Requisition No. NEB 60.625 indicating that the allotment to be Charged for this purpose is 0179-0010-0000. Funds in the amount of $10,430.00 have been encuMbered for this program. The AP-3 and P3-10 equipments, and reports pertaining thereto, are UNCLASSI- FIED; however, the association of the equipment and the contract with the Agency is Classified SECRET. The -project engineer for this program is 50X1- Imit 4, A REV DATE 12 V4373 By 446$154?6 EMIG COMP V33 CPI TYPE Oa-, 011WCLASS ...S__. PAGES REV CLASS JUST AP- NEXT REV 426/ AUTlit UR 11.2 Attachment;: (/ 0 1. Attachment A 2. Contractor's letter and cost quotation dated 15 April 1960 3. Contractor's letter and cost quotation dated 16 Ne,y 1960 4. Specification No. 60-A-1116-A ? 5. Requisition No. NEB 60-625 Distribution: Orig. + 1 - Addressee wiattach. .., e wiattach. 1 50X1 1 - wiattach. 1 50X1 1 - CC-T w attach. 1 1 a 1 1 - DC-Aw/attach. 1 - NSB wttach. CONFIDENTIAL 50X1 ?1---re--2-"ono w/attach. -1 50X1 ....... ../.,4.4?t. 1 6... . - '' Declassified in Part -Sanitized Copy Approved for Release 2014/05/08: CIA-RDP78-03330A004200080006-7 Coordination: 50X1 50X1 /1Ah1rt-sn Declassified in Part - Sanitized Copy Approved for Release 2014/05/08: CIA-RDP78-03330A004200080006-7 keendment to. A Prcasi dated 16 blay 1960 50X1 ThLa proposal should be Changed to reads We propose that thePower supplies be built vith two output*, as follovat Output A: 42 volts, 7 Amps max., unregulated. With no output- load, the output voltage 10111 be eppremimatelY +17 - volts. When a 7 amp. lead is drawn, the voltage will be epproximately +12 volts. There will be no regOla- tion against input line voltage Changes Mipple will be apprOmimately 10% at full load when a CO cps input voltage is used and ebout 1.9% rem at fUll lead when a 400 cps input voltage is used. Output B: +12 volts, 2 amps. max., regulated against line and load changes. For +10% input line voltage Changes. the output will Change no more than +2%. For load changes of no lead to full 2 amp. led, the output voltage will change no more than 3%. Bi,Ple at full load will be about 1% rms. This output arrangement is proposed because ef the evident re- quirement for additional regulated current for sensitive circuit elements, such as tub* filaments, Allah could possibly be damaged by higher voltage at the instant of connection. It should be sePhasitsd that the unregulated output is at +17 volts only when there is ne load at ell on it. /he instant the 7 ampere load is switeheit en, the volt- age will drop to the 12 volt level. The second deviation Inver requests is the limiting of the maximum charging, current for battery Charging to 4 amperes instead of 8 ampere*. this current is the wavlignimi which the supply can deliver continuously. The higher currents obtainable in the other mode of operation are yeallible only because of the 54 dot/ cycle. The proposed technical approach is very similar to that Wen in our letter proposal of 13 April 1,960, except that the Zener diode is used to provtile 2 empires of regulated current instead of 1. eepere. We feel that this amount of regulated current can be delivered within the given package size for the. 06.3. The propeaet blood: diagram is the some as given in our VIAtiOUS ? We feel that this eppreaCh irill satisfy all the requirements. of the speeification? with the OYU,- time regusated above. CONFI1)FNTI11 Declassified in Part - Sanitized Copy Approved for Release 2014/05/08: CIA-RDP78-03330A004200080006-7