INSTRUCTIONAL SYSTEMS SURVEY FINAL REPORT RECOMMENDATIONS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03198A000100020007-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 12, 2016
Document Release Date: 
January 4, 2002
Sequence Number: 
7
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78-03198A000100020007-2.pdf338.32 KB
Body: 
Approved For RbWase 2002/01/28 : CIA-RDP78-03198AQW100020007-2 Section IV. Study A Iaan ua a Trainixa School Enrollment and Physical Environment 1, With the large increase in the LTS enrollments for FY 1967.68., the practice of one-to-one student- teacher ratios must be discontinued if the School is to handle the in- creased enrollments without staff inc:reasea, No fin,11-time classes should start that are less than five students Action to Date Established new pattern for handling classes using not less than four students for common languages, three students for I/common. 11 C / LTS comment on Action to Date: The revised recommendation was applied to the extent possible, but spotty compliance with the policy and, lately, po?tponernent of CT training has made this goal unattainable for the time bein To be implemented for March, July and November only. CTlss, C / LTS comment on Action to Date. The final CT schedule required six startings per year rathe than three., Schedules were published in OTR Bulletin including 2 dates only for beginning part-time classes. System had begun to show some results when 1G report ' forced cpa.an es iaa. CT scheduileo 3. If LTS re:-.ains in its present quarters the building should be redesigned for school use, especially the ventilation system, Work has been done on the interior of the building and the air conditioning system C/LTS comment on Action to Date: Work has been done slowly on interior of building. We can see Sao improvers ent in air conditioning system. Approved For Release 2002/01/28 : CIA-RDP78-03198A000100020007-2 S-bE---C R-E T Approved For Rase 2002/0 'T2 '`- '1A -RPPT8-03198AJ100020007-2 Recommendations If LTS is to be moved to new quarters, consideration should be given to including special "futures" teaching equipment facilities. _ to consult with building designers in these matters Action to Date C/LTS comment on Action to Date: Comment is essentially correct. Teaching Methods 5, some form of teacher training for new WAE personnel be mandatory. In process. C/LTS comment on Action to Date: The major difficulty here is shortage of supervisory personnel. We have interviewed a linguist from FSI who is interested in making a change and who is interested and experienced in teacher training. 6, special seminars be developed for In process, current staff professional growth requiring one-two hours of staff release time a month. C/LTS comment on Action to Date: such meetings as are here recommended have been held only irregularly until now, but we hope to regularize them as time oes on., 7. All language courses be required In process, to develop complete detailed course objectives and detailed outlines n This should be given highest priority and completed no later than end of CY 1966 C/LTS comment on Action to Date: Modified to include five priority languages, Action completed on those by January 67e Work in progress on other courses, No firm completion date can be given at this times Approved For Release 2002/8t128 CCI* 8-03198A000100020007-2 -E"C?R-E- T Approved For R ase 2002/01/28 : CIA-RDP78-03198AAW100020007-2 Recommendations Action to Date 8? Commercially available PAI foreign In process. language courses be applied mmediately in Spanish, French and German in a sustained experimental tests C/LTS comment on Action to Date: Essentially correct as stated. 9. A. small 3-5 person cadre be trained Trained three personnel. n PAI development techniques. C/LTS comment on Action to Date: Four personnel have been trained to date rather than three. 10, All foreign language programs Accepted. developed for LTS be concept units of 200 frames length and -not full PAI (8 to 10 thousand rame,~ courses, Cost $1, 500 per instructional hour. C /LTS comment on Action to Date : Cost has proven to be rather more than indicated; the three Vietnamese units currently in the works are costing $43, 000. 11 o Contracts should be given in FY 1967 for the development of PAI courses in Spanish, French, German, Mandarin and Viet. Vietnamese only contracted with Still in process. C/LTS comment on Action to Date: Underway. See Memo for the Record, dated 24 July 1967, Subject: Status of Work on Contract with 12, Bid specifications for above PAl courses to be written by 30 November 1966, with request for proposal no later than 31 December 1966. C/LTS comment on Action to Date; Correct as stated. Completed Approved For Release 2002/01/26-':A-RbP78-03198A000100020007-2 S- E-C-R -E-T Approved For Fase 2002/01/28 : CIA-RDP78-03198AQ00100020007-2 S-E-C-R-E?T Recommendations Action to Date 13, All future off-the-shelf PAI lan- Agreed. guage courses should be tested outside LTS before being subjected to student use. C/LTS comment on Acton to Date: I'm still not sure what this means and how it works, Presumably,, if we fired a program which looks promising we can contract with someone to test its effectiveness before we use it. 14. Where feasible, LTS ~OTR) should work with other government agencies to jointly support PAY foreign language course development. Thus far, other agencies have expressed only polite interest in our py ect .If something comes of it,, they may et be interested. C/LTS comment on Action to Date: CAI lair A. detailed study will be conducted by Mon the potential of CAI to OTR needs. This is part of the present contract. Covered in this report. C/LTS comment on Action to Date: have not seen this portion of the report. Current Teaching 16, A list of all films available for Completed. language teaching should be developed by the LTS Chief of Support no later than 31 December 19660 C/LTS comment on Action to Date: Correct. S-E-C-R-E-T Approved For Release 2002/01/28 : CIA-RDP78-03198A000100020007-2 Approved For F ase 2002/01/28 : CIA-RDP78-031984WO100020007-2 S-E-C_R- E-T Recommendations Action to Date 17, A complete review of existing No action, language laboratory facilities should be conducted by the LTS Chief of Support in conjunction with_ no later than 31 December 19660 VCr/LTS comment on Action to Date: We have not seen. - in the Language School. since April0 In processo 25X1A 18~, Each LTS language department should be abreast of all new commercial materials publishers, C/LA'S comment on Action to Date: My original understanding with -wasp that he would take care of this personally with major publishers0 We are preparing a list of publishers and letters have been, or in some cases, will be sent asking for examination co'~,~a~.~..~,~m~, 19. _to develop a study on the Completedo value and cost of television to ?TRO C/LTS comment on Action to Date: I have not seen this part of the report 20, A general one-day orientation course In process 0 to languages should be developed and include a "how-to-listen" unit? This unit to be either the "Effective Listening" course available or a new course. C/LTScomment on Action to Date: zu S-EmC-R-EQT Approved For Release 2002/01/28 : CIA-RDP78-03198A000100020007-2