Inspection Report No. 4(Classified)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001200060009-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 9, 2016
Document Release Date: 
May 15, 2001
Sequence Number: 
9
Case Number: 
Publication Date: 
November 2, 1966
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001200060009-3.pdf129.16 KB
Body: 
reY ,q,F.gr Release 2001/O,a/o2?,: -Iff 1""9=20A 001200060009-3 MAY 1082 EDITION =iir Ew r.. 1 L I GSA GEN. REG. NO. 27 -ampf Memorandum 25X1A9a FROM Mr. SUBJECT: Irnspection Report No. 4 - DF-4 MEW 1, Project Description: ??,~X1C1al 2. Contractual Information: 25X1A1a a. b. Initial Cost: Request for Procurement Action: 16 Novembe r 1965 c. d. Initiation Date: 10 January 1966 Completion Date: November 1966 Extension: December 1966 e. Deliverable Items: Two prototype DF-4's; engineering-drawings; final report 3. 4. Date of Meeting: 18 - 19 October 1966 Place of Meeting: coin automatic tiav+ And 4~~~ dQC1~5~1iIC Approved Fa04eWa~DSninp7l c/,~ 8-00`28 0 'aUo -flan EP 66-231 DATE: 2 November 1966 .. Approved For Release 2001/07/28 : CI w EP 66-231 SUBJECT: Inspection Report No,-4 - DF-4 25X1A5a1 Persons Attending: Agency Non-Agency 6. Contractor's Performance: 25X1A5a1 820A001200060009-3 Mr. Mr. a. On schedule and expected to remain so: No b. Within obligated funds and expected to remain so: No c, Satisfactory technical progress: Yes 25X1A5a1 Project Status: Two DF-4's were available for field, tests. The units performed. acceptably when used against AM Broadcast stations but did not operate in a useable manner against CW type signals. This was,caused by the'use. of AGC circuits involving attack/d.ecay times not designed to handle the CW transmission, The AGC in one unit was disabled and an outboard. manual gain control installed. Results were encouraging except that now the ratio meter operated erratically and was not able to "follow the signal." was requested to investigate and. evaluate a manual gain vs AGC. The AGC is obviously the most desirable but a compromise com- bination of manual gain and AGC or a lone, manual, gain control may have to be effected. Several operational/function requirements of the DF-4 were changed. Among these were: 1. Replace the miniature earphone jack on the equipment with one designed to accept a PL-55. 2. Replace the European wall plug on the battery charger line cord with an American style plug. 3. Change the screw thread. on the cap cover of the'battery compartment and the battery charger line cord compartment to one having a coarser thread, to facilitate more rapid replacement. SECRET Approved For Release 2001/07/28 : CIA-ROP78-02820A001200060009-3 Approved For Release 2001/07/28 : C 02820A001200060009-3 Aaw VIRET SUBJECT: Inspection Report No, 4 - DF-4 25X1A5a1 4. Provide guide pins to properly align the ferrite antenna section built into the case bottom when replacing it to the case proper. 5. Use regular Nicad, batteries instead of passive adhydrode Nicads to power the DF-4's and thus provide a 14 to 16 hour charge cycle. In addition, eliminate the requirement to operate the DF-4 from Mercury batteries. 6. Improve the crystal calibrator circuits to provide an obvious calibration point. 7. Provide a fiber glass carrying case containing a canvas strap (for shoulder transport), earphones, sense antenna, extra Nicad battery and, Allen wrenches. 8. The waterproof requirement is relaxed to the lesser requirement of rainproof. 9. Provide a complete, final form, technical manual including photos, parts lists, etc., rather than just furnishing a brief operational guide type book. Because of'the AGO problem, about 4 to 6 weeks of additional work will be involved. Funding under the contract is now under close review and a small overrun is virtually certain. Another field test will be scheduled near the conclusion of the program to evaluate the above changes and the operational capabilities of the DF-4. Distribution: R&D Subject File OL/PD/PCB/CAS R&D Lab 0C-0S OC-SPS ESB Monthly (3) EP Chrono 0C-E/R&D-EP: pjs/3152(2 Nov 66) SECRET EP 66-231 25X1A9a. -?-d Approved For Release 2001/07/28 : CIA-3RDP78-0282OA001200060009-3