Inspection report No. 9(Classified)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001200040018-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
November 11, 2016
Document Release Date: 
September 25, 1998
Sequence Number: 
18
Case Number: 
Publication Date: 
July 5, 1966
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001200040018-5.pdf105.94 KB
Body: 
PPTIO AL i OPM NO. 10 5010-107 Approa 99 m-QFPWWu n Release ' i@99/09/07 : 20A0W 200040018-5 UNITED STATES GOVERNMENT Memorandum ro : The Files: Contract 3786-3120-5 25X1A9a "ROM Mrs SUBJECT: Inspection Report No. 9 - AC-3 with 25X1A5a1 1. Project Description: The AC-3 is an HF antenna coupler which provides an impedance range of 35 to 1200 ohms resistance and 0 to ? J1200 ohms reactance and a trans- mission line of 50?J 0 ohms impedance. The AC-3 is manually operated and provides the impedance match over the 3 to 30 Mc/s range with a VSWR of less than 2:1 while handling 400 watts of continuous RF power. The AC-3 can measure and monitor the forward and reflected power (and hence the VSWR) in the transmission line, and contains a protective circuit which deenergizes the transmitter when a preset level of reflected power is exceeded due to mistuing or malfuncti.Qn. An internal 5Q oh n dummy load (over 3 to 30 Mc/c) io included to permit matching of the tranrmitt@r. Primary power to operate the AC-3 is 120/240 (?1010, 50/60 cps, AC mains. 2. Contractual Information: EP 66-154 DATE: 5 July 1966 25X1A1a b. Request for Procurement Action: March 1965 c. Initiation Date: 29 March 1965 d. Completion Date: Two preproduction AC-3's - 15 June 1966; ninety-eight AC-3's - 90 days after approval of preprods. e. Deliverable Items: One hundred AC-3's w/spares and accessories, updated engineering drawings 3. Date of Meeting: 22 June 1966 25X1A 4. Place of Meeting: 5. Persons Attending: Agency a Mr. Mr. Cnour I Eaclu automatic pproved For 99 09s1fc - DP78-02820A001200040018-5 Buy U.S. Savings gu ar y . the Payroll Savings Plan 25X1 A 9 Non-Agency . Contractor's Performance: 6a 25X1A5a1 9 rN 12 la Approved For Release 1,9,99/09/07 : CI - fS 02820AO 00040018-5 ?UMECT: Inspection Report No. 9 - AC-3 with EP 66-154 25X1A5a1 6. Contractor's Performance: a. On schedule and expected to remain so: -Yes b. Within obligated funds and expected to remain so: Yes c. Satisfactory technical progress: Yes 7. Project Status : Two preproduction AC-3's are assembled and are in operating condition. The coupler was demonstrated at reduced inputs and loads and appears to function in an acceptable manner. Test data is being compiled to insure that the couplers will meet the perform- ance specifications indicated on the attached chart. Eight test points at three operating frequencies were selected. Malfunction of the GFE PAL-350 transmitter (repeated burn out of the R-105, 50 watt, 80 K resistor) delayed the testing until the problem was resolved. The two preprods, along with the test data, are scheduled for delivery on 29 June 1966 via air. Miscellaneous direction was given and decisions were made with respect to warehouse spares, operating spares, spare parts lists, etc. In addition, two preliminary instruction books were received for review and comments. 25X1A9a Attachment: Chart Distribution: R&D Subject File w/att OL/PD/PCB/CAS w/o att R&D Lab w/o att OC-OS w/o att. avow ESB w/o att Monthly (3) w/o att EP Chrono w/o att 6X1 A9a OC-E/R&D-EP1b jp 2 Approved For Release 1999/09/07 : CIA-RD (5 July 1966) Approved For Release 1999/09/07 : CIA-RDP78-02820A001200040018-5 MISSING PAGE ORIGINAL DOCUMENT MISSING PAGE(S): Approved For Release 1999/09/07 : CIA-RDP78-02820A001200040018-5