Inspection Report No. 3(Classified)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001200030021-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
November 17, 2016
Document Release Date: 
August 23, 2000
Sequence Number: 
21
Case Number: 
Publication Date: 
June 24, 1966
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001200030021-2.pdf102.13 KB
Body: 
OPTIONAL FORM NO. 10 5010-10? Ap`0FrReIease1O00/09/08: CIA-RD UNITED STATES GOVERNMENT Memorandum TO A0012000021-2 EP 66-150 ? The Files: Contract 7161 DATE: 24 June 1966 AIIIIIIIIIIII FROM : Mr. U'mtUBJECT: Inspection Report No. 3 - 25X1A5a1 1. Project Description: The PM-18 phase modulates the HF signal of a frequency synthesizer or crystal oscillator. The modulator is keyed to produce pulses of 0.85 millisecond duration spaced at 2.25 millisecond intervals. A unit of information is conveyed by the relative phase (0?, 1206, 240?) of each pulse with respect to the phase of the two preceding pulses. Three serial pulses identify a particular character, so that a total of 33 or 27 separate character codes is possible. Since the character trans- mission is three intervals of 2.25 milliseconds each, or 6.75 milli- seconds, a message of 2400 characters can be transmitted in approximately 16.8 seconds. The triphase signal is then used to drive agent trans- mitters such as the RT-48 and the RT-49. The PM-l8 is combined with the KE-32 to form one package 17.6 cubic inches in size. 2-. Contractual Information: a. Funds Obligated: $50,491.00 b. Request for Procurement Action: 25 August 1965 c. Initiation Date: 15 November 1965 d. Completion Date: Phase I - 18 April 1966 Phase II - 3 months ARO e. Deliverable Items: Phase I - One engineering model PM-l8 Phase II - Five preproduction models PM-18 3. Date of Meeting: 14 June 1966 4. Place of Meeting: Chatsworth, California 5. Persons Attending: Agency Non:AGency Mr. Mr. 25X1A5a1 6. Contractor?s Performance: OBOUP 1 Elto t automatle pproved For Release 2000/0 8& ... 1 00030021-2 Buy U.S. Savings Bonds. Reg Approved For Release00/09/08 : CIA-RDP78-02820A001206bb021-2 EP 66-150 ..ow SUBJECT: Inspection Report No. 3 - 6. Contractor's Performance: a. On schedule and expected to remain so: See Below b. Within obligated funds and expected to remain so: See Below c. Satisfactory technical progress: Yes Project Status: The prototype PM-18 is expected to be completed by the end of June. Phase II will not be initiated until this prototype unit-shows acceptable performance. Acceptance testing should not take more than a month if no problems are encountered. Fabrication of the first unit has gone beyond the original comple- tion date and the cost has exceeded the target by, approximately $3,418. 25X1A5a1 _ attributes the variance to the addition of a control switch to pre- vent standby power drain. This is true; I requested that the PM-18 not consume power when in standby. This request came as soon as I discovered the reverse was true. Unfortunately, it has required that new castings be made for the chassis, new drawings, more engineering time, etc. For 25X1A5a1 these reasons, .is submitting a request for time extension and addi- tional funds. Distribution: R&D Subject File OL/PD/PCB/CAS. R&D Lab OC-OS ESB Monthly (3) EP Chrono 25X1A9a OC-E/R&D-EP/bjp Approved For Release 2000/09/08: CIA-RDP 911111191111111111 * 2 Excluded me downgradi declesslfleallo (24 June 1966)