Insepcetion Report No. 15 - AS-12 Development Program(Classified)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001200030013-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
November 17, 2016
Document Release Date: 
August 23, 2000
Sequence Number: 
13
Case Number: 
Publication Date: 
June 20, 1966
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001200030013-1.pdf101.72 KB
Body: 
OPTIONAL FORM ND. 10 1 7 f ApprS ea~ease 20QW09/08 1:01CI0-A-RDP 3Q13-1 UNITED STATES GOVERNMENT Memorandum EP 66- l4O ? The Files: Contract 684, Task Order 6 DATE: 20 June 1966 Inspection Report No. 15 - AS-12 Develo e 25X1A5a1 1. Project Description: This 18 month effort is to design and construct a service test model of the AS-12 system. The system consists of a field station, a base receiver and sounder transmitter,, and associated data proc- essing and readout equipment. 2. Contractual Information: a. Basic Task: $1,052,744.00 30 June 1964 b. Request for Procurement Action: 4 June 1964 c. d. e. Initiation Date: 30 June 1964 Completion Date: 1 April 1966, Amendment No. 2 Deliverable Items: System Design Plan 31 August 1964 Coder/Keyer Interface Documentation, Phase I 31 August 1964 Coder/Keyer Interface Documentation, Phase II Monthly Progress Letters Semi-annual Reports 30 September Monthly Semi-Annually 1964 Final Engineering Report 1 April 1966 Base Station Instruction Manuals 1 April 1966 Field Station Instruction Manuals 1 April 1966 Engineering Drawings 1 April 1966 Base Station 1 April 1966 Field Station . 1 April 1966 3. Date of Meeting: 1 and 2 June 1966 Place of Meeting: Buffalo, New York Persons Attending: Buy U.S. Savings Bonds Regularly on the Payroll Saving Plan proved For Release 2000/09/08 : CIA-RDP78-02670' E Approved For Release 2061W09/08 1200034M 3-1 EP 66-7 C1A5a1 25X1A5a1 "UBJECT: Inspection Report No. 15 - AS-12 Development Program with 5. Persons Attending: .Agency Non-Agency Mr. Mr. 6. Contractor's Performance: Mon-tn.Ly 0) ) EP Chrono OC-E/R&D-EP/ dms (20 June 1966 a. On schedule and expected to remain so: No b. Within obligated funds and expected to remain so: Yes c. Satisfactory technical progress: Yes Project Status : Both base and field equipment are completed and acceptance tests have'been run. During this visit, the test results were reviewed and most of the tests were rerun at one or two frequencies to spotcheck results. (The tests had previously been run at 100 frequencies.) The equipment met all the criteria set forth in the acceptance test plan, with two minor exceptions. The false alarm rate was calculated to be one in 65 hours. A weekend test resulted in two false alarms. A recalculation of the false alarm rate uncovered a methematical mis- assumption; the false alarm rate should have been once every four hours. The second variation from the test criteria concerned pulse stretching and shortening. It had been thought that no more than 60 usec on sounding and 100 usec on confirm would be tolerated. These numbers did not conform with experimental results. A re- examination of the 1OP1023 code uncovered areas of ambiguity that would permit pulse stretching and shortening as great as 200 usec. The final engineering report is being prepared, and equipment manuals are being published. Completion of this soft wear will end work on this contract. Mr. Mr. Mr. Mr. Approved- Release 2000/09/08: CIA-RDP78-0?S20A094 25X1A9a R&D Lab 0C- 0S Distribution: R&D Subject File OL/PD/PCB/CAS