Monthly Report Technical Service Branch Engineering Staff
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-02820A001200010002-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 9, 2016
Document Release Date:
February 5, 1998
Sequence Number:
2
Case Number:
Publication Date:
February 28, 1966
Content Type:
PERRPT
File:
Attachment | Size |
---|---|
CIA-RDP78-02820A001200010002-5.pdf | 27.08 KB |
Body:
Approved For Release 21/08/02: Cl - O2820A0012001002-5
MONTHLY REPORT
TECHNICAL SERVICES BRANCH
ENGINEERING STAFF
1 February - 28 February 1966
1. Sixty-eight 11-3's are installed and ready for the
activation of the wide band switch. Five units remain to be
installed and they are scheduled for completion by 6 March.
2. The 65/66 running of the Basic Electronics Course for
Wire Equipment Technicians and CT/C's held at the Langley Signal
Center was completed on 25 February. The next class is scheduled
to start in mid-August.
3. All of the Langley Signal Center Transmitter Distributor
Cabinets have been modified for low level keying. No serious
problems to date.
25X1A9a
CWief, Techn:Vcal
Services Branch, OC-E