SBC-1 Evaluation

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A000900010042-5
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
August 3, 2000
Sequence Number: 
42
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A000900010042-5.pdf65.46 KB
Body: 
Approved For Release 2000/08/27 : CIA-RDP78-02820A000900010042-5 MISSING PAGE ORIGINAL DOCUMENT MISSING PAGE(S): Approved For Release 2000/08/27 : CIA-RDP78-02820A000900010042-5 Approved For Release 2000/08/27 : CIA-RDP78-0282OA000900010042-5 25X1A5a1 5. During the month of January the F.SB projects engineers continued to evaluate the SBC-1. The following additional fault was found. a. On received signals, where the suppressed carrier was weak (but acceptable), noise in the AFC carrier chain caused the reactance oscillator to shift erratically, causing the audio tone outputs to shift frequency and thus cause errors in copy. 6. Three units were returned to IBsI from= We were advised by 25X1 A5a 1 that all faults had been repaired. 7. Two of the three units were rejected. The following faults were found: a. In one unit there was a noise burst from the AFC which interrupted copy as described above in Para 5-a. Presumably it was still coming from the oven. b. In another unit the sensitivity of the AFC carrier chain was low, and the unit would not lock in on a suppressed carrier of -20 db. c. The third unit was found to be in good operating condition. 8. While examing the units, an additional problem became apparent. Several failures of the drift alarm amplifier oscillator tube, a 6U8A, revealed that this circuit was critical enough to require "hand selection" of the tube. Although not extensively tested, life of tubes in the circuit seems to be shortened. 9. Conversations with U. S. NAVY personnel based at their receiving site in Hawaii, revealed that they were having exactly the same problems with eleven SBC-l's which they were using. 10. The SBC-1 in its present stage of manufacturing is not recommended as a reliable unit suitable for field use. 25X1A9a Distribution: Origina - Routing & File - Monthly Report 1 - AES Chrono 1 - Project File 1 -PEI 1-TSB Approved For Release 2000/08/27 : CIA-RDP78-0282OA000900010042-5