MONTHLY PROJECT REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-02820A000400030092-3
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
28
Document Creation Date:
December 22, 2016
Document Release Date:
July 2, 2012
Sequence Number:
92
Case Number:
Publication Date:
October 31, 1958
Content Type:
FORM
File:
Attachment | Size |
---|---|
CIA-RDP78-02820A000400030092-3.pdf | 964.07 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
0 FUTURE
PROJECT NUMBER
E - 5010
PROJECT TITLE
Receiving Antenna MMulticoupler
To provide for OC requirements the best possible receiving antenna
PROJECT DESCRIPTION
To monitor the commercial and'military developments in the field to
determine if any of these multicouplers provided sufficient improvement to
warrant replacing those now used in OC requirements.
x
It was learned that the Roma Air Development Center was to mains evaluation
tests on the COB Model CU-1383 lilticoypler. The project engineer moo a trip
to RADC to discuss these tests with the RADC engineers.
RAMC had not yet received the user-test models of the COB Xultieoupler and
therefore had made no tests. They expect to receive the unit to be tested within
the next month or two. It was agreed that copies of their test results would
be forwarded to the Agency when completed.
The general feeling among the RADC engineers was that the COB was an
excellent piece of equipment, but that its cost ($2500) was somewhat out of
line.
It was learned that the Westinewuse Corporation is asking a mult1tO ler
which compares very f vorably, on paper, with the COB unit and the price is
approximately one-half the price of the COB unit. RADC is going to evaluate
this Westinghouse unit and forward the reports to this Agency. Meauv'bile, -
Westinghouse will be contacted in an attempt to obtain one of their sulticouplers
for ei.nation.
P f? rs 1 T
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
S C R E T
MONTHLY PROJECT REPORT
ORIGINATOR(S)
BUDGET EST. FY.
REPORTING PERIOD
OC-E
AMOUNT
ONION 109,
Q FUTURE ACTIVE ^ COMPLETED 0 CANCELLED Q SUSPENDED
PROJECT NUMBER PRIORITY CLASS PRIM. RSPN. PROJECT ENGINEER
-.Z--5020 T
PROJECT TITLE
) dification Work Orders
PROJECT RE)UIREMENT
To notify all field stations of standard modifications to equipment.
PROJECT DESCRIPTION
Reproduce necessary copies, assemble and prepare cover letters for all
3t dification Work Orders. Obtain approval and coordination. Determine
category of distribution and forward to appropriate arm.
APPROVAL DATE
APPROVED +M
STARTING DATE -
COMPLETION DATE
a
8 b 1955
* utostioa wi t or&= Yo. 26 (dated 16 October 190) iws iss et
pso a mww,~ VMS awk to
iaiag this Twi ing pwladf
~,~
ordering the kits tb
is
0 Into the t
41AA# SO owh
~ *,~
,
1
powfeaed on NW Co1I4W-b traa tte s to give elf sa et wt 16-T
to pas a 1llot+kiag an s equismat 1W . of 'fax'
shorting witch.: aid t t . Strip eerr+ears.
C C r n r -r
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-02820A000400030092-3
S E, C R E :T
MONTHLY PROJECT REPORT
BUDGET EST.Fy. REPORTING PERIOD
AMOUNT - 195& -
ID ACTIVE
^ COMPLETED ^ CANCELLED ^ SUSPENDED
PRIM. RSPN. PROJECT ENGINEER
FES
PROJECT REQUIREMENT
To keep the field supplied with current technical information pertient to
general.operation.
PROJECT DESCRIPTION
Scan technical literature to determine and select items for field distribution,
determine distribution category, reproduce required ntanber of copies, prepare
cover letter, arrange appro -aM coordination.. and forward to
appropriate areas.
APPROVED AJW
JJS
2 February 1956
S+ ioii lmlletin Ro. 22 - " ods and MsterisU for Cheating )btorol a
VYC PA-7705 2ranemi tter and PA-7706 Reeed war Ta"d Circuits. " The wing
spatch for this buLletin is now being coordinated. This latletia should be
sued sometime naact month.
ical DaUetin So. 25 - "Performance and Design of the Eloping Vee
" has been *=p1sted and is being routed to the Dating
visions before being issued.
r. r~ ?r
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02: CIA-RDP78-02820A000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
S E C P E T
MONTHLY PROJECT REPORT
ORIGINATOR S~ )
BUDGET EST.FY
REPORTING PERIOD
.
AMOUNT
October 1 October 1,9,58
0 FUTURE ?
ACTIVE ^ COMPLETED 0 CANCELLED 0 SUSPENDED
PROJECT NUMBER
PRIORITY CLASS PRIM. RSPN. PROJECT ENGINEER
E`5058
EES
PROJECT TITLE
Standardizing of Morse Code Perforators
PROJECT REQUIREMENT
Select a comme
rcially available perforator which best suits the requirements
of Agency installations.
PROJECT DESCRIPTION
Canvass the market and evaluate Morse Perforators to determine which is
the most reliable,
easiest to maintain, cheapest to maintain, etc.
Recommend this
model for standardization.
APPROVAL DATE
APPRO STARTING DATE COMPLETION DATE
July 1958
July 1958
S E C f' E T
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
S E C R E T
MONTHLY PROJECT REPORT
ORIGINATOR(S)
KDGET EST, FY
REPORTING PERIOD
OC-P
AMOUNT
1 ...- 31 October
FUTURE ? ACTIVE ^'COMPLETED 0 CANCELLED [3 SUSPENDED
PROJECT "NUMBER PRIORITY CLASS PRIM. RSPN. PROJECT NINE.EP
E-5o6o SDS
PROJECT TITLE
Strategic Reserve Program
PROJECT REOUIREMENT
To provide readily available transportable type package radio stations at con-
venient locations throughout the world for immediate installation and operational
use in the event of an emergency.
PROJECT DESCRIPTION - --~W
To provide bills of materials fo trans-
portable type package radio stations with suggested oor pilaa"m you s and
standard wiring diagrams to provide efficient equipment utilization.
APPROVAL DATE APPROVED WAB s4 STARTING DATE COMPLETION DATE
September 1953 JJK s September 1953
The OC-P staff study was received during this reporting period. After
preliminary discussions within OC-E, the study was discussed with OC-P
personnel. Subsequently, a memorandum outlining the OC-E understandings and
comments as follows was forwarded to OC-P.
4. All installation, spares, and accessory items be packaged and stocked
as a single line item for each type of package station.
5. It was recommended that the responsibility for submission of the
annual replacement program be transferred to the Engineering Staff.
(Continued)
r` r n rl r- r
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
25X1
PROJEC?> NUMBER
E-5060
S E C R E T
MONTHLY PROJECT REPORT
REPORTING PERIOD
1 - 31 October
6. An orderly program for the replacement of obsolete equipment within
the Strategic Reserve Porgram is to be initiated and will require
a policy decision on "forced issue" of equipment which is no longer
the newest or possibly the best model available. This policy
decision should be publicized throughout Communications, and
decisions as to specific equipment to which the policy will be
applied should be made by the Equipment Board.
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
S E C R E T
MONTHLY PROJECT REPORT
ORIGINATOR S) BUDGET EST. FY, REPORTING PERIOD
C-E AMOUNT 1 - 31 06tober
^ FUTURE ACTIVE ^ COMPLETED ^ CANCELLED [] SUSPENDED
PROJECT NUMBER
E-5085
PROJECT TITLE
PRIM. RSPN.
SDS
Communications Systems Planning for New Headquarters Building
PROJECT REQUIREMENT
To determine the types of Communications systems, and thequantities of
equipment that will be required for installation in the new Headquarters Build-
ing to meet Agency communications requirements.
PRIORITY CLASS
I
PROJECT DESCRIPTION - - ---
To investigate and compile information oast new communications systems and
equipment. To meet regularly with representatives of the Message Center Staff,
Operations, Engineering, snd Security Divisions, and the OC member of the New
Building Planning Staff to discuss communications requirements for the new
building. To prepare a list of the equipment that will be required and suggested
floor plans and equipment layouts defining spare requirements.
APPROVED WAB s/
STARTING DATE ~ COMPLETION DATE
January 1957
J K /s/
!TaP- 1957
During this month drawings were made and submitted to the New Building
and Planning Staff showing the location and base details for the antennas to
be placed on the roof of the new building at Langley, Virginia.
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Next 1 Page(s) In Document Denied
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
*We S E C R E '*%w
MONTHLY PROJECT REPORT
BUDGET EST. FY.
Akio UN 7
O
SPN,
Mult inl
ex. System for Base Station to Sub-Base Stations Communications
PROJECT RE OU I REMENT
To provide a system of communications for base to sub-base operation to
meet expanding communication commitments without extensive plant expansion.
ROJECT DESCRIPTION
Investigate and compile a report on the practicability of utilizing multiplex
equipment on staff circuits, formulate systems where utilization is
ractical and
p
make comparison costs with systems currently in use where expansion is contemplated
or in areas where expanding communication commitments to staff circuits could
Justify multiplex communications .
May 1957
October - 31 October 1958
PROJECT ENGINF.F.R
STARTING DATE C(MPLETI.)% r,ATL
May 1957 T_-
S E C I? E T
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
S E C R E T
25X1
PROJEc NUMBER
Z-5103
MONTHLY PROJECT REPORT
REPORTING PERIOD
I October - 31 October 1958
At the conclusion of this testing s final project report will be submitted.
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
S E C R E T
The Avion Company delivered the final 29 modification kits on 8 October.
All necessary information has been turned over to YES for shipment of these
units to the field. As of this reporting period this project is completed.
A
APPROVAL DATE August* 1357
MONTHLY PROJECT REPORT
ORIGINATOP S) BUDGET EST.FY?8 REPORTING PERIOD
OC -E A in c U N T $10 , C)00 1 October - 31 October 1958
0 FUTURE ^ ACTIVE Q) COMPLETED 0 CANCELLED 0 SUSPENCEPP
PROJECT NUMBER PRIORITY CLASS PRIM. RSPN. PROJECT ENGINEER'
E-5106 I EES
PROJECT TITLE
Mechanical Transmitter Interlock Switches
PROJECT REQUIREMENT
To increase the safety features of the 16-F and 231-D type transmitters by
providing a mechanically actuated switch that will ground the high voltage when
the doors of these transmitters are opened.
PROJECT DESCRIPTION
Determine the type and quantity of switches for each type of transmitter.
Have an outside consulting firm investigate the circuitry and construction of
the 16-F and 231-D type transmitters for the best possible arrangement of wiring
and placement of the switches.
This firm will also purchase the switches and other hardware to make an
amount of kits, complete with installations instructions.
Secure authorization to make installation of these switches mandatory.
APPROVED AJ+J $
STARTING DATE COMPLETION [)ATE
JJx s
August 1957 October 16___-
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Next 3 Page(s) In Document Denied
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
OR I G~NATORTD
OC-E
S E C R E T
MONTHLY PROJECT REPORT
BUDGET EST. FY.
AMOUNT
PROJECT NUMBER
E-5120
PRIORITY CLASS
I
REPORTING PERIOD
1 October - 31 October 1958
PRIM. RSPN. 1PROJECT ENGINEER
PROJECT REQUIREMENT
Review what is currently on the market to determine if there is an
economically suitable replacement for the Northern 107 Model 2 Frequency
Shift Converter.
Prepare a comparison chart of all Frequency Shift Converters currently
being produced, such as the Hoffman CV-60, TNT CPA, Collins 706A-2, Northern
107 and 174, etc., to determine which is the most suitable unit to meet our
requirements.
January 1958
February 1958
COMPLETION BATE
Work was started on this project, but progress has been slow due to the
fact that delivery of the Model 1FX FS'iquency Shift Kayers (which are used
signal generators in the comparison evaluation tests) from the manufacturer
was delayed.
All equipment required for this project will be delivered in the very
near future and the project should progress at a normal rate.
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Os IGINATOPS)
OC-E
o F U T U R E
PROJECT NUMBER
E-5122
PROJECT REoUIREMENT
To determine the advantages or disadvantages of space/frequency diversity
reception systems for possible Agency application.
I 1%W
S E C R E T
MONTHLY PROJECT REPORT
J BUDGET EST, _-.__- - .-
FY. 58 REPORTING PER100
AMOUNT -^ 1 October - 31 October 1958
LIORITY CLASS
I
r nV J t L I I I I L L -'._..._...___. _.
Evaluation of Diversity Reception Systems
r}ROJECT DESCRIPTION ~._.. _.. ____....
A study will be made of available commercial and military diversity
reception systems. -A report will be prepared listing the capabilities of each
system compared to conventional receiving systems. The following points will
be considered.
APPROVAL DATE
April 1958
1.
2.
3.
5?
X) ACTIVE ^ COMPLETED
0 CANCELLED ^ S
USi'fN0E0
Economy
Flexibility
Ease of operation and maintenance
Antenna space requirement
Agency requirement
PRIM. kSPN. PR _. ~4~;rf
STARTING DATE JCUMPLETIi7N DATE
April 1958
The Technical lkterial Corporation's DDR-2A Dual Diversity Receiver to
be used in this study has been delivered to the T&I Section for installation
of a ventilation kit and operational checks of the components.
This project study should begin by 1 November 1958.
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
? J t. L N t
'two
MONTHLY PROJECT REPORT
ORIGINATOR S)
BUDGET EST. FY
REPORTING PERIOD
OC-O+T
.
AMOUNT
1 - 31 October
^ FUTURE 0 ACTIVE ^ COMPLETED ^ CANCELLED 91 SUSPENDED
PROJECT NUMBER PRIORITY CLASS PRIM. RSPN. PROJECT ENGINEER
PROJECT TITLE
Antenna Systems for omminications Nets.
PROJECT REQUIREMENT To pr ovine an aircenna system, with the receiving antenna(s)
being capable of joint use by other offices, for communications nets installed in
buildings. The antenna installation should perform efficiently
and yet no a ract from the esthetic appearance of the building.
PROJECT DESCRIPTION
To investigate and test various types of multicouplers, vertical antennas
with associated tuning networks, both remotely operated and passive, and to
deteraine the type multicoupler and antennas best suited to meet the applicable
requirements.
APPROVAL DATE APPROV STARTING DATE COMPLETION DATE
April 1958 April 1958
S E C R E T
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
S E C R E T
MONTHLY PROJECT REPORT
6RTGINATOP 5a
BUDGET EST. FY.
REPORTING PERIOD
QQ-E
AMOUNT
1 - 31 October
0 FUTURE ACTIVE ^ COMPLETED ^ CANCELLED ^ SUSPENDED
PROJEC' NUMBER
PRIORITY CLASS PRIM. RSPN. PROJECT ENGINEER
F
E-512 I SDS
PROJEG. TITLE
Transmitter/Antenna Switching and Matching Systems
PROJECT REQUIREMENT
To investigate methods for the efficient transfer of R.F. energy from
transmitters to antennas.
PROJECT DESCRIPTION
This study is to investigate the various methods of transmitter to antenna
switching, associated patch panels, coaxial patch cords and connectors, dummy
loads, standing wave ratio indicating devices, transmission lines, and
matching methods and devices. The aim of this study is to provide a centralized
fund of information on all phases of the transfer of R.F. energy from trans-
mitter to antenna in order to facilitate engineering design.
APPROVAL DATE APPROVED STARTING DATE COMPLETION DATE
A it 1958 April 19
{
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Next 1 Page(s) In Document Denied
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
w S E C R E T __
MONTHLY PROJECT REPORT
ORIGINATOR S
BUDGET EST'FY
REPORTING PERIOD
OC-O&T 58-766
.
AMOUNT
1 October - 31 October 1958
^ FUTURE :) ACTIVE ^ COMPLETED ^
CANCELLED 0 SUSPENDED
PROJECT NUMBER PRlOR~,TY CLASS PRIM, RSPN.
PROJECT EN INE?R
E-5135 EES
PROJECT TITLE
Modernization of CP-4 Control Panel
PROJECT REQUIREMENT
Redesign the CP-4 Control Panel and fabricate 100 units.
PROJECT DESCRIPTION
Redesign the CP-4 control panel as a more efficient unit and rebuild
from the start, using miniaturization techniques wherever possible and practical,
incorporating features in the equipment from experience
gained from previous
models of the control panel.
APPROVAL DATE APPROVED ARTING DATE
COMPLETION DATE
July 1958 July 1958
fI
S E C: E T
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
.
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
r 5i~ S E C R E T
MONTHLY PROJECT REPORT
0 GINATOR(S)
BUDGET EST, F
REPORTING PERIOD
OC-E
Y
_ AMO T
1 - 31 October 1958
E
? ACTIVE
^
0 TED
COMPLETED
^
CANCELLED
PROJECT
NUMBER
IORITY CLASS
RSPN,
ENGINEER
PROJECT
!-5137 r EES
1
PROJECT TITLE
Coaxial Output Network for the 231-D Transmitter
Pf?0JECT R1 UIREMENT f
A coaxial output network, independent of the existing unbalanced output is
required for the 231-D Transmitter.-"
EROJECT DESCRIPTION
The output circuit of the 231-D Transmitter will be investigated and a
suitable network, with provisions for metering, will be designed and fabricated
to accommodate coaxial fittings. The existing outputs (i.e., unbalanced and
balanced 600 ohm line feed) of this transmitter will not be affected. A modi-
fication kit with instructions will be drawn up.
A'PROVAL DATE APPROVED TARTING DATE OMPLEi d~;~v OAI
July 1958 _ July 2,958
~
A new approach is being made to this project in view of a more desirable
solution from the standpoint of ease of installation and logistic support.
The solution seems at this time to be a single pole-double throw vacuum
sealed radio frequency relay mounted external to the shell of the transmitter
with provisions for deactivation of the transmitter plate voltage while switch-
ing from coaxial to unbalanced output.
The commercial market is being surveyed to determine the best relay avail-
able for this application.
S E C R E T
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-02820A000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
S C C n E T
MONTHLY PROJECT REPORT
ORIGIN ATOP (S)
F
BUDGET EST.
Y
REPORTING PERIOD
CSD 8-517
.
A,AOUN T
1 October - 31 October 1958
O FUTURE 2 ACT I VE [3 COMPLETED ^ CANCELLED ^ SUSPENDED
PROJECT NUMBER PRIORITY CLASS PRIM. RSPN. PRyJEcT ENGINEER
E-5138 EES
I
PROJECT TITLE
Teletype Clear Text Alarm
PROJECT REOUIREMENT A device is required which will detect the clear text word
"CITE" when transmitted to a signal line. Upon detecting this word the device
will provide a disabling circuit for the transmitter-distributor and an audible
and/or visual alarm shall be given.
PROJECT DESCRIPTION
All signal lines are monitored by model-14 reperforators. Contact assemblies
are available that are operated by the pull bars on the M-14. These contacts
can be added so that they are operated by the space, C, I, T, and E pull bars.
These contacts can be used to control the Clear Text Alarm device. The Clear
Text Alarm device will be either relay or diode operated and contain its own
.power supply.
APPROVAL DATE APPROVE TARTING DATE COMPLETION DA1L:
August 1958 August 1958
fI' n ??
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-02820A000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
~e.~= Page( s) Next 2 Page(s) In Document Denied
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
.a t= L ii '
MONTHLY PROJECT REPORT
R - 5144 I ERS
PROJECT TITLE
REPORTING PERIOD
1 October - 31 October 1958
j O F;;TURE ACTIVE ^ COMPLETED ^ CANCELLED ^ ~ PEA=U)
1'~tOJECT NUMBER PRIORITY CLASS PRIMA. RSPN, PROJECT EN61NEER
ORIGINATO SP T BUDGET EST FY
SPD/RA U N T
1p _
9 i'T JECT RE )UIREMENT
25X1
Receiving Antenna Patch Panel
To provide SPD with an antenna patch panel-
7R1
Design and construct a VHF/UHF receiving antenna patch panel for
'\PPROYAL DATE
October 1958
APPROVED
COMPLETION DATE
October 1958
S E C R E T
i
25X1 `
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Next 2 Page(s) In Document Denied
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 CIA-RDP78-0282OA000400030092-3
S E C R' E T
V
MONTHLY PROJECT REPORT
DRIGINATOR S
BUDGET EST. FY.
REPORTING PERIOD
-O+T
AMOUNT
1 - 31 October
El FUTURE ACTIVE ^ COMPLETED ^ CANCELLED ^ SUSPENDED
PROJECT NUMBER P R I O R I T Y CLASS PRIM. RSPN, PROJECT ENGINEER
E-5412 I SDS
PROJECT TITLE -^ '
One Man Radio Station
PROJECT REQUIREMENT
Design a complete one man radio station to be used as a standard for the
planning of all new one man stations or when renovating existing stations.
PROJECT DESCRIPTION
This project was originally started in September 1956 to prepare a bill of
materials and associated drawings to cover the installation of a one man radio
station It has been expanded to cover the installation and
renovation or all one man stations. Using the one man station design as a guide,
a complete bill of materials, associated drawings and installation specifications
will be prepared according to the requirements of each particular station.
APPROVAL DATE
APPROVED kJFjj ls~
STARTING DATE
COMPLETION DATE
.4 tember 1956
J~K ~sL
September 1956
Declassified in Part - Sanitized Copy Approved for Release 2012/07/02 : CIA-RDP78-0282OA000400030092-3