R&D COST INFORMATION ON SYSTEMS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP75B00380R000100050059-6
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 19, 2016
Document Release Date:
July 26, 2006
Sequence Number:
59
Case Number:
Publication Date:
August 10, 1973
Content Type:
MF
File:
Attachment | Size |
---|---|
CIA-RDP75B00380R000100050059-6.pdf | 81.06 KB |
Body:
Approved For Release 2006/0/959 c RDP75B0038OR000100050059-6
B
DD/SF1T-2446-73
10 August 1973
25X1A
25X1A
25X1A
25X1A
25X1A
MEMORANDUM FOR: Director, Office of Planning, Programming, and Budgeting
ATTENTION:
SUBJECT:
1. In response to your inquiry of 9 August on behalf of Mr. Preston
of the House Appropriations Committee 'ed ORD and OEL for
budgetary figures on
2. I Ican be divided into three phases: the first of
which was for studies and planning; the second is for development and
testing; and the third for prototype construction. The funding of these
phases has been or will be as follows:
Phase I
Phase II
(Reserve Release)
Phase III
TOTAL R&D
Funding for Phases II and III is
type vehicles.
FY 73
FY 74
for payloads and proto-
25X1A 3. I Imust be handled in a slightly different manner
25X1A since the eserve a ease I includes funding for some work on
operational systems. The funding summary is as follows:
25X1A
25X1A
25X1A
erational System Funds
*Reserve Release
Working Copy `'1 Uyl-
S E C R E T IMPDET
RFD Cost Information on Systems
r r:o ed For Release 2006/09/25: CIA-RDP75B0038OR000100050059-6
When Finished
Approved For Release 20Q6g)$/2k :LC*-RDP75BOO38OR000100050059-6
-2-
SUBJECT: RFD Cost Information on System
TOTALS: RFD
Operational
25X1A
25X1A
25X1A Although some Isystem "development" is connected
with Operational System Procurement, most funds are for fabrication and
25X1A test of operational system hardware and are not considered as RFD
expenditures. The relatively small expenditure II for RFD results 2 5X1A
2 5X1A from the fact that r -7 uses technology developed under the
25X1A Program. Total expenditures through FY 1973.
25X1 A are approximately represent RFD funds. The 25X1 A
estimated for procurement an testing of operational systems wil e
reestimated in November 1973 when results of the System Definition and
at-sea testing have been analysed. It should be noted that if a
decision is made at this point not to proceed. with operatil s stem
procurement, most of the long 1e-a items procured with the ona 25X1A
reserve funds will be usable as part of Operational 25X1A
Systems.
25X1A
Comptroller
Directorate of
Science and Technology