R&D COST INFORMATION ON SYSTEMS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP75B00380R000100050059-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 19, 2016
Document Release Date: 
July 26, 2006
Sequence Number: 
59
Case Number: 
Publication Date: 
August 10, 1973
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP75B00380R000100050059-6.pdf81.06 KB
Body: 
Approved For Release 2006/0/959 c RDP75B0038OR000100050059-6 B DD/SF1T-2446-73 10 August 1973 25X1A 25X1A 25X1A 25X1A 25X1A MEMORANDUM FOR: Director, Office of Planning, Programming, and Budgeting ATTENTION: SUBJECT: 1. In response to your inquiry of 9 August on behalf of Mr. Preston of the House Appropriations Committee 'ed ORD and OEL for budgetary figures on 2. I Ican be divided into three phases: the first of which was for studies and planning; the second is for development and testing; and the third for prototype construction. The funding of these phases has been or will be as follows: Phase I Phase II (Reserve Release) Phase III TOTAL R&D Funding for Phases II and III is type vehicles. FY 73 FY 74 for payloads and proto- 25X1A 3. I Imust be handled in a slightly different manner 25X1A since the eserve a ease I includes funding for some work on operational systems. The funding summary is as follows: 25X1A 25X1A 25X1A erational System Funds *Reserve Release Working Copy `'1 Uyl- S E C R E T IMPDET RFD Cost Information on Systems r r:o ed For Release 2006/09/25: CIA-RDP75B0038OR000100050059-6 When Finished Approved For Release 20Q6g)$/2k :LC*-RDP75BOO38OR000100050059-6 -2- SUBJECT: RFD Cost Information on System TOTALS: RFD Operational 25X1A 25X1A 25X1A Although some Isystem "development" is connected with Operational System Procurement, most funds are for fabrication and 25X1A test of operational system hardware and are not considered as RFD expenditures. The relatively small expenditure II for RFD results 2 5X1A 2 5X1A from the fact that r -7 uses technology developed under the 25X1A Program. Total expenditures through FY 1973. 25X1 A are approximately represent RFD funds. The 25X1 A estimated for procurement an testing of operational systems wil e reestimated in November 1973 when results of the System Definition and at-sea testing have been analysed. It should be noted that if a decision is made at this point not to proceed. with operatil s stem procurement, most of the long 1e-a items procured with the ona 25X1A reserve funds will be usable as part of Operational 25X1A Systems. 25X1A Comptroller Directorate of Science and Technology S E C R E T Approved For Release 2006/09/25 : CIA-RDP75B0038OR000100050059-6