TEST OF EJECTION SEAT CANOPY BREAKER EXTENSION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP75B00285R000400170001-9
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
23
Document Creation Date:
December 12, 2016
Document Release Date:
October 25, 2001
Sequence Number:
1
Case Number:
Publication Date:
May 18, 1970
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP75B00285R000400170001-9.pdf | 1.09 MB |
Body:
Approved For Release 2001411/16 : CIA-RDP75B00285R4gp400170001-9
.V4teififeed au,
ADVANCED DEVELOPMENT PROJECTS
BURBANK, CALIFORNIA
REPORT NO. SP-1622
DATE 5-18-70
TEST OF EJECTION SEAT
CANOPY BREAKER EXTENSION
PREPARED B
REVIEWED B
STATI NTL
STATI NTL
APPROVED B
REVISIONS
DATE
C. L. J&hnson
Senior Vice President
Advanced Development Projects
PAGES AFFECTED
Approved For Release 2001/11/16 : CIA-RDP75B00285R000400170001,-9
Approved For Reigrese 2001/11/16 : CIA-RDP751300285R4190400170001-9 SP-1622
Page 1
TEST OF EJECTION SEAT CANOPY
BREAKER EXTENSION
1.0 PURPOSE
These tests were conducted to determine that the extension of the
Canopy Breaker (RQ266) by 3.0 inches would not impair the ability
of the Ejection System to catapult the pilot and seat through the
canopy and provide zero speed-zero altitude escape.
2.0 EXTENT OF TEST
2.1 Previous tests have been conducted to qualify the Ejection System to
zero-zero capability. (See SP-1496 and related movie, No. 336.)
However, it is necessary to provide a three inch higher canopy
breaker position to accommodate a tall pilot and an increased seat
cushion thickness. The most difficult seat position for canopy
breakage is as close to the canopy as possible. The seat travel is
limited by a limit switch to 1/4 inch clearance between the rubber
pad on the ram and the canopy glass. Thus the momentum of the
seat is at its lowest when it contacts the glass.
2. 2 Two tests were run. One test with the glass at ambient temperature
(approximately 750F) and one test with the glass chilled by dry ice
to the lowest temperature obtainable.
2.3 A full pressure suit was put on the dummy for the first test to check
the effect of the pressurized suit on the ejection and to check the
possibility of suit damage.
3.0 TEST EQUIPMENT
3. 1 Test Sled
? This is a portion of cockpit mounted on a steel framework which has
those parts of the fuselage, canopy, and seat pertinent to the test.
3.2 Seat
This seat is the same one used in a number of previous tests. It
was repaired and modified to the new canopy breaker configuration.
It is equipped with a recovery parachute in an effort to save the seat
from damage. These tests emphasized this seat's affinity for asphalt.
The result was an abnormal amount of repair necessary following the
first test and retirement from active testing is indicated after the
last test.
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
Approved For Rai lipase 2001/11/16: CIA-RDP751300285R(40400170001-9 SP-1622
Page 2
3.3 PYROTECHNICS
The pyrotechnic devices used were furnished from the customers
stock. The ship portion of the Pyrotechnic System was not used.
This included the Canopy Thrusters, the Internal Canopy Jettison,
the External Canopy Jettison, and the Stick Stowage Systems.
The Seat System was activated by a pin fired initiator mounted on
the steel frame of the sled and tripped by a long steel cable. This
initiator fired through the seat disconnect into the seat portion of
the Pyrotechnic System.
The Seat System was standard except for the omission of the "D" Ring,
the shoulder reels were back and locked, inoperative lower line cutters
on the drogue chute, and the "D" Ring cutter line was diverted to fire
the added seat recovery chute gun.
3.4 Canopy
Two canopies were obtained and installed in the frames. One canopy
had been rejected because of scratches suffered in polishing. There
was no deterioration of strength.
3.5 Cameras
A total of thirteen cameras, eight fixed and five hand held, were used
to record the tests. The pertinent still pictures are included herewith.
The film from the various movie cameras has been edited into
"Test of Extended Canopy Breaker on U-2R Escape System", film
number 356, and is to be considered part of this report.
3.6 Cold Saddle & Dry Ice Box
This is a plywood box built to fit intimately over the canopy and hold
the dry ice in such a position as to chill the canopy glass. The
insulated ice box was used to transport the dry ice to the test site.
3.7 Instrumentation
Based on a review of report SP-1496, "Qualification Test of U-2R
Escape System", dated 17 July 1969, there was no need to extensively
instrument the current tests. This is substantiated by a study of
the Strength-Temperature curve of the canopy material. This curve
indicates that little strength is gained by decreasing the temperature
below -20?F. For example, the ultimate tensile strength is 15,300
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
Approved For Reladse 2001/11/16 : CIA-RDP7513002851W400170001-9 SP -1622
Page 3
3.7 Instrumentation Contid
psi at -20?F and 16, 200 psi at -60?F. This represents an increase
of only 16.2/15.3 = 1. 06 (6%). In loading the dry ice into the cold
saddle, the same procedure was followed as in SP-1496, which gave
three readings of -51?F, -61?F, and -68?F (average = 60?F) at time
of removal of cold saddle. The elapsed time between removal and
test was 1 minute and 15 seconds. The estimated surface temperature
was -38?F and the internal temperature would be approximately -55?F.
In the current test the internal glass temperature is estimated to
have been -50?F due to heat pickup being higher because the additional
insulation wrapped around the canopy did not completely offset the
30 knot wind. This sets the glass strenth at 16, 000 psi instead of
16,200 for a 16.0 strength level.
16.2 100 = 99%
3. 8 Special
For the first test the dummy was dressed in a full pressure suit,
S1010 PPA, and inflated to approximately 1 psig.
4.0 CONDUCT OF TEST
General: The following outline of the conduct of the test applies to
both the ambient and the cold test. Exceptions are noted.
4.1 The seat was plumbed and the pyrotechnics added. The recovery
chute was packed in the box below the seat with its gun packed. The
dummy was strapped in. Photo No. 1.
4:?.2 The seat wasloaded into the sled after the installation of the
catapult. Photo No. 2.
4. 3 The test sled was located on. the test site so that the predicted seat
impact point would be on sand to reduce damage to the seat. Photo
No. 3.
4.4 The canopy was installed and locked down. Photo No. 3.
4. 5 The cameras were located, power to run them provided, and
loaded with film. Photo No. 4.
4..6 The pressure suit was inflated to approximately I psig.
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
SP-1622
Approved For Meese 2001/11/16 : CIA-RDP751300285R448400170001-9
Page 4
4.7 The dummy initiator was replaced with a loaded one and the safety
pin pulled to arm the initiator. Photo No. 5.
4.8 All personnel were cleared from the area and the count down started.
The cameras began to run on the count of 2 and the initiator was
fired on O.
4.9 The cold test deviated from the above only in the loading of the dry
ice into the cold saddle about 3 hours prior to the firing and five
minutes prior to the firing time the insulation (tarps) were removed
from the sled and the cold saddle removed from the canopy.
Approximately one minute after the saddle removal the test was fired.
5.0 DISCUSSION
5.1 Ambient Temperature Test
This test, conducted 23 April 1970, successfully catapulted the
seat through the canopy. See the series of photos taken at 20 frames
per second on Page 7. Following is a discussion of pertinent photos.
5.1.1 Photo No. 3 illustrates the proximity of the canopy breaker and the
dummy's helmet to the canopy. This is the uppermost position
permitted by the limit switch in the seat raising circuit. The small
ball tipped rod on the breaker is the feeler that opens the limit switch
when the rubber pad is one quarter inch from the glass.
5. 1. 2 Photo No. 6 shows start of ejection. Note the compression of the
rubber pad and the small ball snapping off the limit switch rod. The
canopy frame has deflected off the cockpit pressure bulkhead by
approximately an inch and a cloud of black smoke is coming up from
the catapult initiator line where the male and female disconnect
fittings have become unmated after 1 inch of travel.
5.1.3 Photo No. 7 (one twentieth of a second later) shows the initial
fractures. Note how far the dummy's helmet is below the canopy
breaker (compare to Photo No. 6). The seat is accelerating
rapidly but the dummy is now being forced down into the cushion.
Note that the visor on the helmet is very close to the edge of the
glass. See the movies for more detailed information.
5. 1.4 Photo No. 8 shows the dummy position one twentieth of a second
later. Note his position relative to the canopy breaker is still the
same as in Photo No. 7. Note the large piece of glass contacting
the left knee.
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
SP-1622
Approved For Reme 2001/11/16 : CIA-RDP751300285R4160400170001-9
Page 5
5.1.5 Photo No. 9 shows the test to be a success. The seat has cleared
the ship through the canopy, which was the purpose of the test. ?A
subsequent malfunction of a portion of the jection sequence detracted
greatly from the glory of the test/ s success. This malfunction proved
to be a well disguised blessing in that it happened in this test instead
of in a more serious situation. (Personal chute deployment gun
failed to fire.)
5.1.6 Photo Nos. 10 and 11 are left and right side views showing the
total area cleared.
5.2 COLD CANOPY TEST
This test, conducted 6 May 1970, successfully catapulted the seat
through the chilled canopy. Unfortunately, the Hulcher camera
malfunctioned and photographs similar to Photos 6 through 9 are
not available. However, the motion pictures are quite detailed.
The results of the test are shown in Photo Nos. 12, 13, 14 and 15
which warrant the following discussion.
5.2.1.Photo No. 12 shows the left side of the canopy. The knee area is
well cleared out but note the sharp point just forward of the seat
tracks. Note melted frost.
5.2.2 Photos No. 13 and 14 again show good knee clearance and good glass
clearing on the right side of the cockpit. Again you see the sharp
point just forward of the tracks on the left side.
5.2.3 Photo No. 15 is a close up of the above mentioned point. A closer
Inspection of Photos 12, 13 and 14 shows a crack at the forward end
of this large piece of glass. This allowed it to hinge outward and
thus the sharp point did no serious damage to the dummy. However,
there was a scuff mark on the left shoulder of the suit where the
. point contacted but did not tear the cloth.
6.0 CONCLUSIONS
The modified canopy breaker with the 3.0 inch vertical extension
did not impair the ability of the catapult to force the pilot and seat
_through the canopy. The ambient temperature test was at 75?F
approximately or an ultimate glass strength of 11, 000 psi. The
chilled canopy was estimated to be at -50?F or an ultimate strength
of 16, 000 psi.
? There was no indication of stalling on the part of the catapult and
the altitude of both tests were better than average height.
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
Approved For RIll6se 2001/11/16: CIA-RDP75B00285M14400170001-9 SP-1622
Page 6
6,0 CONCLUSIONS Conti d
The smaller contact surface of the modified canopy breaker cleared
away less area and left more to be taken out by the seat and dummy
than was true of the wider breaker of the tests of SP-1496.
Admittedly, ejection through the canopy is a third stage emergency,
but serious consideration must be given to the increased clearance
obtained with a wider breaker.
The added test of the inflated suit is considered successful in that
two observers testified that the air was heard to escape from the
suit after the unfortunate ground contact. It was "fortunate" that
two cameramen were within a few feet of the dummy when he landed.
There was a tear in the suit which is believed to have been caused
by the broken leg received at the violent contact with the ground.
The added test of the thicker cushion was discussed above. The
conclusion concerning this cushion is that it forces the pilot to sit
higher and thus requires the higher canopy breaker. Study of the
dummy's excursion during ejection indicates that as the seat
accelerated the cushion allowed the pilot to remain relatively
motionless until the seat had compressed the cushion. By this
time, the seat has accelerated and catches the pilot with a high
differential speed. It is questionable that there is an advantage
to a soft cushion.
The cushion tested was 2 5/8 inches thicker than a standard cushion
and 1 inch thicker than the one on which the design of the extended
breaker was based. This means the pilot for which the breaker
was intended will be 1 inch higher than the original proposed height.
The thicker cushion raises the pilot to the point where the shoulder
straps of the parachute will bear on his shoulders. (See Photo No. 2.)
The dummy had to be pushed down into the cushion to allow the chute
to slip into its allotted space. Thus the dummy was carrying the
weight of the chute on his shoulders.
The thicker cushion must be carefully analyzed with reference to
the short armed pilot being able to reach the "D" Ring when his
suit is inflated. The same study must be made concerning the
controls during suit inflation.
Approved For Release 2001/11/16 : CIA-RDP75B00285R000400170001-9
Approved For RVase 2001/11/16 : CIA-RDP75B00285R000400170001-9
A
SP-1622
Page 7
1. Prior to firing.
2. The initiator has fired the catapult and the seat has moved up to
contact the glass. Note the black smoke from the initiator coming
up the aft bulkhead. This occurs after the catapult moves the rocket
up far enough to separate the mated connections of the initiator line.
3. The catapult has forced the Canopy Breaker through the canopy.
4. The pilot and seat are emerging through the canopy and the rocket has
ignited.
5. The seat has cleared the tracks and the Seat Drogue Chute Gun has
fired to deploy the stabilizing chute.
6. The test is successful.
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
Approved For Reease 2001/11/16 : CIA-RDP75600285R000400170001-9
SP-1622
Page 8
PHOTO NO, 1
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
Approved For Rejoase 2001/11/16 : CIA-RDP75600285R000400170001-9
SP-] 622
Page 9
PITO I 0 NO,, 2
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
Approved For Release 2001/11/16 : CIA-RDP751300285R000400170801-9622
Page 10
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
PHOTO NO. 3
Approved For.,Release 2001/11/16 : CIA-RDP75600285R000400170001-9
SP-1622
Page 11
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
SP-1622
Page 12
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
PHOTO NO. 5
Approved For,Release 2001/11/16 : CIA-RDP75600285R000400170001-9
SP-1622
Page 13
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
PHOTO NO. 6
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
SP-1622
Page 14
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
PHOTO NO. 7
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
SP-1622
Page 15
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
PHOTO NO. 8
Approved FaLRelease 2001/11/16 : CIA-RDP75B002{aR000400170001-9
SP-162;2
Pa.g.e 16
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
PHOTO NO. 9
Approved ForZelease 2001/11/16 : CIA-RDP75130028,451R000400170001-9
SP-1622
Page 17
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
PHOTO NO. 10
Approved ForZelease 2001/11/16 : CIA-RDP75130026?F000400170001-9
SP-1622,
Page 18
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
PHOTO NO. 11
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
SP-1622
P;Lge 19
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
PHOTO NO. 12
Approved For Release 2001/11/16 : CIA-RDP751300285R000400170001-9
SP-162,2
Page 2,0
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
PHOTO NO. 13
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
SP-1622
Page 21
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
PHOTO NO. 14
Approved ForZelease 2001/11/16 : CIA-RDP75600285R000400170001-9
SP -1622
Page 22
Approved For Release 2001/11/16 : CIA-RDP75600285R000400170001-9
PHOTO NO. 15