PROGRAM PROGRESS REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP75B00285R000300150002-1
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
12
Document Creation Date:
December 15, 2016
Document Release Date:
January 12, 2004
Sequence Number:
2
Case Number:
Publication Date:
July 18, 1974
Content Type:
MF
File:
Attachment | Size |
---|---|
CIA-RDP75B00285R000300150002-1.pdf | 260.26 KB |
Body:
Approved For Tease 20041 P SECRE
r"4111 75BOO283i1SO0300150002-1
25X1
25X1
Copy 11 of 12
18 JUL 1974
MEMORANDUM FOR: Director, CIA Reconnaissance Programs
SUBJECT: Program Progress Report
Forwarded herewith are four copies of the IDEALIST
Program Progress Report for the period 1 April 1974 - 30 June 1974.
25X1
Brigadier General, US
Director of Special Acti\itles
25X1
pproved For Release 2004/
GROUP I EXCLUDED FROM
B00285R0003001 9CLASSIFICA T [ION ING
25X1
Approved For Ruse 200410;
B00285FW0300150002-1
25X1
25X1
SAS/O/OS
Distribution:
1-D/CRP
2 - D/CRP
3 - D/CRP
4 - D/CRP
5 - DDS & T Reg
6- D/SA
7- SAS/O/OSA
8 - IDEA/O/OSA
9 - INTEL/ O/ OSA
10 - D/ M/ OSA
11 - AMS/OSA
12 - RB/OSA
Approved For Release 20
age 2
(11 July 1974)
LUDED FROM
t o"P9 JO
WNGRAO NG
25X1
TOP SECRET
Approved Foriclease 2004 - 7580028"000300150002-1
25X1
25X1
IDEALIST
OPERATIONAL SUMMARY AND STATUS
(1 April 1974 - 30 June 1974)
25X1
OPERATIONAL MISSION SUMMARY
A. Ten IDEALIST TACKLE missions were alerted during this
25X1
period.
All missions were p anne
to be flown no closer than 25 nautical miles to the China mainland coast.
The following is a summary of the missions flown:
1. Mission C124C was flowni along the
north central China coast from the Shantung Peninsula south
to Shanghai. The mission employed the r'H" camera system.
All aircraft systems operated normally and there were no
observed threats to the aircraft. pro-
grammed targets and 27 bonus targets were covered on this
mission.
25X1
2. Mission C154C used the "H" camera system and was
flown uin the Swa and Pratas Island areas.
Because of target area weather, programmed
targets were photographed. All systems operated normally
during the mission.
3. Mission C164C was flowni along the
north central China coast from Shantung south to Shanghai.
The "H" camera system was used and programmed
targets were covered. Forty-eight bonus targets were
covered. There were no unusual occurrences and all systems
operated normally.
GROUP 1 FXCLUDFD FROM
Approved For Release 2004 B00285R0003001 `Z10 DOWNGRADING
25X1 Cl ASSIFICATION
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Approved For tease 20041'
hk3WP`151300281N00300150002-1
Section 1
Page 2
25X1
25X1
4. Mission C174C used the "H" camera sstem and
-
A
was flown in the Taiwan Strait area 7
1
weather abort was made midway throug the mission.
0
targets.
programmed targets were covered plus two bonus
5. Mission C184C was flown in the
Taiwan Strait area using the "H" camera system. The
mission went as briefed and rogrammed targets
were covered. Nine bonus targets were also covered. There
were no unusual occurrences.
6. Mission C194C was flowni in the Port
Arthur area of the north China coast. The mission employed
the "FH" camera system. programmed
targets plus 18 bonus targets were covered. All systems
operated normally.
Approved For Release 2004
GROUP {~,I EEXCLUDLD FROM
B00285R0003001 00 '24 DOWNGRADING
AND D DECLASSIFICATION
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET
Approved For Fase 2004/0 r II I . - 5B00285RD?0300150002-1
Sec
Page 3
25X1
25X1
25X1
B. Geological Survey - Four sorties were flown to provide photo-
graphic coverage of selected CONUS sites for land use analysis by the
Army Corps of Engineers. The following sorties were flown:
1. Oklahoma City - Three sorties.
2. Cuyahoga River, Ohio-Illinois River, Illinois - One sortie.
C. COMPASS TRIP - One sortie was flown over the poppy field
test site at Yuma, Arizona.
D. r"B-3" Camera Test - Ten sorties were flown in support of the
modified r''B" configuration.
Approved For Release 200
G ROODU~P ' EXCLUDED FROM
B00285R0003001 0~02u1 DOWNGRADING
AND DECLASSIFICATION
25X1
25X1
Approved For Rase 2004/
25X1
25X1
Section 1
Page 4
PILOT AND AIRCRAFT STATUS (AS OF 30 JUNE 1974)
A. Detachment 1'"G" (Edwards AFB - North Base)
Aircraft
rpproved For Release 2004 A-DrI B00285R0003001
1-UP btL.Ktf
XCLUDEDF ROM
DOWNGRADING
~1=4
ND DECLASSIFICATION
25X1
25X1
25X1
25X1
5B00285WO0300150002-1
25X1
25X1
Approved For RWease 2004
IDEALIST
DEVELOPMENT SUMMARY AND PROGRESS
(1 April 1974 - 30 June 1974)
25X1
AIRFRAME
U-2R Flight Test and Operational Training Summar
1. IDEALIST Program accomplishments in U-2R aircraft
since introduction include 13, 524. 8 hours on 4, 168 sorties as of
30 June 1974,
2. Flight test and operational data are depicted below:
1 APR-30 JUN 1 APR-30 JUN
FLIGHTS TIME
1 - 051 41
2 - 053 111. 7
46 133. 6
3-054 65
4 - 055 194.8
13 39. 2
25X1
25X1
25X1
TOTAL 165
PAYLOAD
479.3
A. ?"H" Mirror S/N 002: The new beryllium mirror ordered under
Contract HY 3222 late in FY 1973 completed production during this
quarter, and was formally accepted for the U.S.
1974, Installation of this mirror into '.'H" configuration S/N 002 wa May
s
completed on 18 June. Because of limited aircraft availability, flight
qualification of sensor/mirror was delayed. Approximately five sorties
are tentatively scheduled over a 2 week period in early July to qualify
the "H" S/N 002 sensor system.
Approved For Release
OO2.lD FROM
UOWNG RARING
Approved For F!ase 2004 1B00285MOO300150002-1
Section 2
Page 2
B. "B-3" S/N 229 and SIN 230 - Ten flight tests were conducted
with S/N 229 during this quarter in an effort to demonstrate sensor
performance ability to attain contractual specifications. During May,
a modification to dampen internal sensor motion was made to S/N 229
in expectation that this would contribute to meeting specifications.
Some improvement was evidenced from this modification; however, at
quarter's end, both sensors continued to fail contractual specifications.
A. Autopilot - An engineering change proposal to modernize the
article's rate gyros in order to provide a more stable platform was
received from the contractor by the Depot in early June. After review,
this engineering change proposal was accepted and acquisition of rate
gyros to equip the entire fleet was initiated. A 12 to 14 month span is
planned to complete retrofit actions.
B. T-35 Tracker Camera - Light emitting diode (L.E. D.) prototype
components to modify the T-35 tracker camera were obtained, and two
successful flight tests at standard cycle rate (1 cy/30 seconds) were
accomplished during this quarter. Final testing of the rapid cycle rate
(1 cy/3 seconds) will occur in early July. The results of all testing will
be provided to the Depot for continued action.
pproved For Release 2004 fB00285R0003001
r ap SECRE
CLUDEDFROM
T'15 DOWNGRADING
I'=. ECIFICATION
25X1
25X1
25X1
TOP
Approved For ReMase 2004/
'5 B00285 R4W0300150002-1
ec ion
Page 3
25X1
25X1
25X1
25X1
vI IAERO MEDICAL AND LIFE SUPPORT ACTIVITIES
A. Medical Activities
25X1
25X1
25
Approved For Release
D FROM
^" Impa NG RAD NG
0 O~
Approved For RdWase 2004/
25X1
25X1
25X1
4. The contract with Lovelace Clinic at Albuquerque,
New Mexico, will be terminated as of 1 August 1974. The
Lovelace Clinic has performed annual physicals on Project
pilots for many years.
B. Life Support Activities
1. AMS/OSA, visited
David C ar Company, Worcester, Massachusetts, 30 April -
1 May 1974. The purpose of the visit was for orientation and
update on the latest life support equipment. Also discussed was
a shark screen presently under consideration as a survival item.
of aviation
Medicine , Brooks AFB, Texas, from 3 - 6 June 1974 to
participate in discussions with SA
M
i5B00285F 0300150002-1
Page 4
ec
personnel and
Air Lock Incorporated, regarding a follow-on proto-
ype of t e Air Lock polycarbonate helmet. The new helmet
will incorporate many new modifications and will be funded by
SAM research and Air Force SPO funds. Additional meetings
pertaining to the new helmet will be held with NASA/SAM and
research work will be continued at Brooks AFB, Texas.
Approved For Release 2
M1A~IOW NG RA00M
ROOF C LASS I FIC AT ION
25X1
Approved For ease 2004 11 75B00285R000300150002-1
"FO HER&T
Section 2
Page 5
25X1
C. Scientific Conference - The annual Aerospace Medical Associ-
ation Scientific Meeting was held in Washington, D. C., 6 - 9 May 1974
25X1 with attending,
25X1
25X1
25X1
25X1
Approved For Release 20041 MI P015B00285R0003004a' ` SIFICAT$ON
Approved For Release 2004/02/11 : CIA-RDP75B00285R000300150002-1
25X1
Approved For Release 2004/02/11 : CIA-RDP75B00285R000300150002-1