U-2 PHOTOGRAPHIC RECONNAISSANCE OF THE PARACEL ISLANDS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP75B00285R000200050005-0
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
11
Document Creation Date:
December 15, 2016
Document Release Date:
April 29, 2004
Sequence Number:
5
Case Number:
Publication Date:
April 26, 1974
Content Type:
MF
File:
Attachment | Size |
---|---|
CIA-RDP75B00285R000200050005-0.pdf | 174.79 KB |
Body:
25X1
TOP SFf.RFT 2 9 APR 197,
Approved F, Release 2,V-110, IWI - DP75B0@ 5R00020005000
(S) NATIONAL RECONNAISSANCE OFFICE
WASHINGTON, D.C.
25X1
25X1
25X1
26 April 1974
MEMORANDUM FOR: Assistant to the President for
National Security Affairs
Deputy Secretary of Defense
Under Secretary of State for
Political Affairs
Chairman, Joint Chiefs of Staff
Director of Central Intelligence
SUBJECT: U-2 Photographic Reconnaissance of the
Paracel Islands
Island group.
L
25X1
1. The attached document is a. proposal for a U-2 photo-
graphic mission to obtain peripheral coverage of the Paracel
2. In the past, missions in this area have been flown
under the TACKLE mission approvals. However, the last TACKLE
mission flown in the Paracels was in May 1973. Since that time
the Peoples Republic of China (PRC) has significantly increased
the force level on the islands and has expanded its radar track-
ing capability. While this action has not increased the
vulnerability of a U-2 operating in this area, the plane will
certainly be identified and tracked while flying this mission.
3. Because of the political sensitivity of the Paracel
Islands it is
felt that your approval should be obtained prior o ying an
operational mission.
NRO review(s) completed.
25X1
CONTROL NO_
Approved For Release 200 ?3 7cF 1i P75B00285R00020005PA SOF 25 topic
PAGE OF-~- PACES
Approved Felease 2004/
S E R&i P75B00 000200050005-
25X1
25X1
4. It is recommended that you approve this U-2 operational
mission to obtain oblique photography of the Paracel Islands.
25X1
25X1
Attachment -
Proposal Book
APPROVAL
40 Committee Principal
25X1
25X1
CONTROL N
~ pproved For Release 2004 ~75 EUP75B00285R00020005PL05r0 2 5 coF'i i
PAGE 2 of F'AGF S 25X1
Approved Fj Release 2
25X1
Distribution:
1 - Assistant to the President for National Security Affairs
2 - Deputy Secretary of Defense
3 - Under Secretary of State for Political Affairs
4 - Chairman, Joint Chiefs of Staff
5 - Director of Central Intelligence (via
6 - Executive Secretary, 40 Committee
7 - Director, National Reconnaissance Office
8 - Joint Reconnaissance Center
9 - Deputy Director of Central Intelligence (via
10 - Director, CIA Reconnaissance Programs
11 - Deputy Director for Intelligence
12 - Deputy Director for O erations
13 - Asst. to DDCI
14 - OPS/INT/CC
15 - Director of Special Activities
16 - DD/OPR
17 - Chairman, COMIREX
.18 - EA/China / Ops / DDO
19 - D/O/OSA
20 - SAS/O/OSA
21 - INTEL/OSA
22 - IDEA/O/OSA
23 - D/ M/ OSA
24 - RB / OSA
25 - SAFSS
25X1
25X1
25X1
25X1
25X1
CONTROL N
Approved For Release 2004 75B00285R00020005:000
EXCLUDED FROM AUTOMATIC REGRADING PAGE 3 OF 3 PAGES
DOD DIRECTIVE 5200.10 DOES NOT APTLY
25X1
T P SECRET
Approved F., Release 20 - DP75BOONSR000200050005-0
U-2 PHOTOGRAPHIC
RECONNAISSANCE OF
THE PARACEL ISLANDS
25X1
Approved For Release 200
G? Ry~Op~DU~~~~P',~~p!l~LCLEEE7~XC LUDED FROM
XN'D-SSIF CAT ON ING
25X1
25X1
25X1
25X1
Approved F Release 21Qk/&ErGI7 DP75BOO.5R000200050005-0
TABLE OF CONTENTS
1.
II. OPERATIONAL CONCEPT
III. COVER
IV.
V. CLIMATOLOGY
25X1
VI.
Approved For Release 2004/
LUDEDFROM
ED R OM
RADIING
WNG
WA'A c? O
f ND DECLASSIFICATION
TU~CRFT
25X1
25X1
25X1 Approved For Release 2004/07/07 : CIA-RDP75B00285R000200050005-0
Approved For Release 2004/07/07 : CIA-RDP75B00285R000200050005-0
25X1
Approved F Release 204
II. OPERATIONAL CONCEPT
25X1
25X1
An IDEALIST U-2R will fly a round-robin mission
P75BOO+205R000200050005-0
to obtain coverage of the Paracel Island
Photographic flight lines will be planned to obtain "H" camera
photography of these islands without overflying any of the land mass.
This should provide good quality imagery of all military and
construction activity taking place.
Normal TACKLE operational procedures will be used
Maps of this mission are contained in Section VI.
25X1
Z
Page
Approved For Release 200 - ~75BOO285R00020
TOP SECRE
GRdI El(CLUDEDFROM
eOWNGRADING
25X1
25X1
25X1
25X1
25X1
Approved FRelease 21
III. COVER
The Cover Plan will be in accordance with normal TACKLE
25X1
operations.
25X1
Approved For Release 200
ECRET
GROUP I EXCLUDED FROM
OWNGRAD
CAT ON ING
$AM-WIIF
25X1
25X1 Approved For Release 2004/07/07 : CIA-RDP75B00285R000200050005-0
Approved For Release 2004/07/07 : CIA-RDP75B00285R000200050005-0
25X1
Approved F.,W , 'Release 20 ECR-R P75BOW5ROO0200050005-0
V. CLIMATOLOGY
April - May - June
25X1
A. GENERAL:
During April the easterly monsoon is still the dominant factor
in the climate of the Paracels. This usually means a long over water
trajectory of moisture laden air which readily produces low level
cloud cover. In late April the spring transition to the southwest
monsoon begins and the climate changes to the southwest monsoon
type by the end of May. This change of climate increases the amount
of high and middle level clouds resulting in a slight increase in mean
cloudiness. Occasional anticyclonic curvature imposed on the easterly
flow pattern results in subsiding air which decreases the cloud cover
for short periods.
B. CLOUDINESS:
Mean cloudiness for daylight hours in the Paracels varies from
50 percent in April to 70 percent in June. Normally, 5 to 7 days of
favorable weather conditions (2/8 or less cloud cover) are expected in
April decreasing to 1 to 2 days in June.
I
Approved For Release 200 5B00285R000200
GROUP 1 ExCLUDED FROM
PAYt-71-IIC~OWNGRADING
ANVDVDEEC LLASSIFI CAT I ON
25X1
25X1
25X1 Approved For Release 2004/07/07 : CIA-RDP75B00285R000200050005-0
Next 1 Page(s) In Document Exempt
Approved For Release 2004/07/07 : CIA-RDP75B00285R000200050005-0