PROGRAM PROGRESS REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP75B00285R000200050003-2
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
11
Document Creation Date:
December 15, 2016
Document Release Date:
March 30, 2004
Sequence Number:
3
Case Number:
Publication Date:
July 18, 1974
Content Type:
MF
File:
Attachment | Size |
---|---|
CIA-RDP75B00285R000200050003-2.pdf | 255.34 KB |
Body:
Approved For Release 2004/05
B00285RO200050003-2
I
Copy 9 of 12
18 JUL 1974
MEMORANDUM FOR: Director, CIA Reconnaissance Programs
SUBJECT: Program Progress Report
Forwarded herewith are four copies of the IDEALIST
Program Progress Report for the period 1 April 1974 - 30 June 1974.
25X1
25X1
25X1
WENDELL/ VAN,
Brigadier General, US
Director of Special Acti4it.es
Attachments -
25X1 As stated
NRO review(s) completed.
25X1
25X1
Approved For Release 2004
JB00285R0002000
yry~,{ySI ,/{,%CLUDED FROM
IT~ DOWNGRADING
NG
25X1
Approved For Reuse 2004/05/13 SECRE
B00285 0200050003-2
25X1
25X1
aP ge Z
25X1
25X1
SAS/O/OSA:
5 - DDS&T Reg
6- D/SA
7- SAS/O/OSA
8 - IDEA/O/OSA
9 - INTEL/O/OSA
10 - D/M/OSA
11 - AMS/OSA
12 - RB/OSA
Distribution!
1 - D/CRP
2 - D/CRP
3 - D/CRP
4 - D/CRP
pproved For Release 2004/
(11 July 1974)
iB00285R00020001
EXCLUDED FROM
0007:19C DOWNGRADING
AND DECLASSIFICATION
25X1
Approved For Ruse 2004/01
25X1
25X1
IDEALIST
OPERATIONAL SUMMARY AND STATUS
(1 April 1974 - 30 June 1974)
25X1
25X1
25X1
period. Six of those alerted were flown as scheduled; two were
A. Ten IDEALIST TACKLE missions were alerted during this
cancelled by Project Headquarters due to adverse weather;
All missions were planned
to be flown no closer than nautica mu es to the China mainland coast.
The following is a summary of the missions flown:
1. Mission C124C was flown on 11 April 1974 along the
north central China coast from the Shantung Peninsula south
to Shanghai. The mission employed the IIH" camera system.
All aircraft systems operated normally and there were no
observed threats to the aircraft. Seventy-two of the 99 pro-
grammed targets and 27 bonus targets were covered on this
mission.
2. Mission C154C used the "H" camera system and was
flown on 26 April 1974 in the Swatow and Pratas Island areas.
Because of target area weather, only four of 13 programmed
targets were photographed. All systems operated normally
during the mission.
3. Mission C164C was flown on 2 May 1974 along the
north central China coast from Shantung south to Shanghai.
The "H" camera system was used and 51 of the 63 programmed
targets were covered. Forty-eight bonus targets were
covered. There were no unusual occurrences and all systems
operated normally.
Ap
proved For Release 2004/0 00285R000200050
OP"SECRET
GR.QUP~I EXCLUDED FROM
~CiQ[A IIC DOWNGRADING
AND DECIA5SIFICATION
25X1
25X1
Approved For Ruse 2004/0
25X1
25X1
25X1
Section 1
Page 2
4. Mission C174C used the "H" camera system and
was flown in the Taiwan Strait area on 15 May 1974. A
weather abort was made midway through the mission. Seven
of the 78 programmed targets were covered plus two bonus
targets.
5. Mission C184C was flown on 22 May 1974 in the
Taiwan Strait area using the "H" camera system. The
mission went as briefed and 44 of the 50 programmed targets
were covered. Nine bonus targets were also covered. There
were no unusual occurrences.
6. Mission C194C was flown on 24 May 1974 in the Port
Arthur area of the north China coast. The mission employed
the "'H" camera system. Forty-six of the 52 programmed
targets plus 18 bonus targets were covered. All systems
operated normally.
proved For Release 2004/0
r~p'~~--yyrrlI,~Pq I EXCLUDED FROM
TIC DOWNGRADING
AND DECLASSIFICATION
25X1
25X1
25X1
A. BRAVE CREW - Four sorties were flown over Fort Hood, Texas,
to provide the Department of the Army with photographic coverage of
the JCS coordinated "Exercise BRAVE CREW 74. "
Section 1
Page 3
25X1
25X1
B. Geological Survey - Four sorties were flown to provide photo-
graphic coverage of selected CONUS sites for land use analysis by the
Army Corps of Engineers. The following sorties were flown:
Approved For Release 200 5B00285R000200050003-2
I%Nrr TOP SECRET
25X1
1. Oklahoma City - Three sorties.
2. Cuyahoga River, Ohio-Illinois River, Illinois - One sortie.
C. COMPASS TRIP - One sortie was flown over the poppy field
test site at Yuma, Arizona.
D. C4B-3" Camera Test - Ten sorties were flown in support of the
modified "'B" configuration.
25X1
25X1
GROUP 1 E:XC LUDED FROM
AUTOMATIC DOWNGRADING
pproved For Release 2004 5B00285R000200 CAL 5651 FIC ATION
25X1
25X1
25X1
25X1
25X1
Approved FcRelease 200,
75B002$ 8000200050003-2
25X1
Sec ion
Page 4
III.
PILOT AND AIRCRAFT STATUS (AS OF 30 JUNE 1
974)
A.
Detachment rrG" (Edwards AFB - North Base)
5X1
B. Detachment ""H"
Aircraft
Pilots
Approved For Release 2004 05/13 - - P75B00285R00020d
TOP SECRET
UDFDFROM
NGRAD NG
q?IUFI/CITCx6oW
AND DECLASSIFICATION
5X1
25X1
Approved Fo, Release 20T 75B00 8000200050003-2
I
Section
IDEALIST
DEVELOPMENT SUMMARY AND PROGRESS
(1 April 1974 - 30 June 1974)
25X1
2.
Flight test and operational data are depicted below:
1 APR-30 JUN
FLIGHTS
1 APR-30 JUN
TIME
1
- 051
41
111.7
2
- 053
46
133.6
3
- 054
65
194.8
4
- 055
13
39.2
25X1
25X1
AIRFRAME
U-ZR Flight Test and Operational Training Summary
1. IDEALIST Program accomplishments in U-ZR aircraft
since introduction include 13, 524, 8 hours on 4, 168 sorties as of
30 June 1974.
A. ""H" Mirror S/N 002: The new beryllium mirror ordered under
Contract HY 3222 late in FY 1973 completed production during this
quarter, and was formally accepted for the U. S. Government on 23 May
1974. Installation of this mirror into "14" configuration S/N 002 was
completed on 18 June. Because of limited aircraft availability, flight
qualification of sensor/mirror was delayed. Approximately five sorties
are tentatively scheduled over a 2 week period in early July to qualify
the "H" S/N 002 sensor system.
Approved For Release 2004
UDEDFRM
IOOZZWNG RADIO G
AND DECLA551FICATION
25X1
25X1
25X1
Approved Fo*IrRelease 201,
25X1
25X1
Section 2
Page 2
25X1
25X1
25X1
25X1
25X1
B. "B-3" S/N 229 and S/N 230 - Ten flight tests were conducted
with SIN 229 during this quarter in an effort to demonstrate sensor
performance ability to attain contractual specifications. During May,
a modification to dampen internal sensor motion was made to S/N 229
in expectation that this would contribute to meeting specifications.
Some improvement was evidenced from this modification; however, at
quarter's end, both sensors continued to fail contractual specifications.
A. Autopilot -- An engineering change proposal to modernize the
article's rate gyros in order to provide a more stable platform was
received from the contractor by the Depot in early June. After review,
this engineering change proposal was accepted and acquisition of rate
gyros to equip the entire fleet was initiated. A 12 to 14 month span is
planned to complete retrofit actions.
B. T-35 Tracker Camera - Light emitting diode (L. E. D.) prototype
components to modify the T-35 tracker camera were obtained, and two
successful flight tests at standard cycle rate (1 cy/30 seconds) were
accomplished during this quarter. Final testing of the rapid cycle rate
(1 cy/3 seconds) will occur in early July. The results of all testing will
be provided to the Depot for continued action.
Approved For Release 20 ,~ 75B00285R00020q
UDEDFROM
M M19-0WNG RAD NG
AND DECLASSIFICATION
25X1 Approved For Release 2004/05/13 : CIA-RDP75B00285R000200050003-2
Approved For Release 2004/05/13 : CIA-RDP75B00285R000200050003-2
25X1
TOP SECRET
Approved Fd#Release 200 - P75B0020R000200050003-2
eft ion 2
Page 4
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
4. The contract with Lovelace Clinic at Albuquerque,
New Mexico, will be terminated as of 1 August 1974. The
Lovelace Clinic has performed annual physicals on Project
pilots for many years.
B. Life Support Activities
AMS/OSA, visited
David Clark Company, Worcester, Massachusetts, 30 April -
1 May 1974. The purpose of the visit was for orientation and
update on the latest life support equipment. Also discussed was
a shark screen presently under consideration as a survival item.
2. also visited the School of Aviation
Medicine (SAM), Brooks AFB, Texas, from 3 - 6 June 1974 to
participate in discussions with SAM personnel
I regarding a follow-on proto-
type of the helmet. The new helmet
will incorporate many new modifications and will be funded by
SAM research and Air Force SPO funds. Additional meetings
pertaining to the new helmet will be held with NASA/SAM and
research work will be continued at Brooks AFB, Texas.
Approved For Release 20@Ngfig k. 75B00285R00020
GROUP I EXCLUDED FROM
G50p034WNGRAGING
AND DECLASSIFICATION
25X1
25X1
Approved FoQRelease 20TQE
P
758002000200050003-2
25X1
Section Z
Page 5
25X1
C. Scientific Conference - The annual Aerospace Medical Associ-
ation Scientific Meeting was held in Washington, D.C., 6 - 9 May 1974
25X1 with lattending.
25X1
Approved For Release 20Q,4t.0.511 3. -.CIA pgQil~75B00285R00020q
OW 14WNG RADIO G
AND DECLASSIFICATION
25X1