CABLE TO PRIORITY (SANITIZED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP75B00159R000400100051-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 19, 2016
Document Release Date: 
December 20, 2006
Sequence Number: 
51
Case Number: 
Publication Date: 
February 18, 1966
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP75B00159R000400100051-1.pdf160.67 KB
Body: 
31 c 25 Z 1 8 " ~,'.B L v 25X1 SUBJECT STATUS REPORT 372 ACCIDENT. 1. TEAM DID NOT RETURN TO ACCIDENT SITE 18 FEB SINCE MAJOR R eS.4Z 19 F EB 65 1 PRIORIT~ :~ PRIORITY FR0iyi REF REF PORTION OF MORNING UTILIZED IN-COORDINATINGI OSITION RE25X1 Approved For ReleaseZ006/12/27: CIA-RDP75BOO159R0004 1100051-1 25X1 N 88935 ~-.__ ~.s... _._._.. sue.... ~ _- x...._.. ~" _ .3....,__ AFTER POSITION ESTABLISHED TEAM DEPARTED FOR IT G-47 GROUND ABORTED AND REPAIRS OR REPLACEMENT AIRCRAFT COULD NOT BE PROVIDED IN SUFFICIENT TIME TO MAKE EFFECTIVE USE OF REMAINING DAY LIGHT HOURS AT SITE. TEAM NOW SCHEDULED TO DEPART I I (A) BEGIN CLEARING AWAY BRICK, CEMENT, AND RUBBLE FROM BENEATH, ON, AND AROUND AIRCRAFT. BEEN MADE AVAILABLE AND WILL BE UTILIZED PERI (INSTRUCTIONS. (B) ADDITIONAL PHOTOS WILL BE TAKEN. (C) DEPENDING UPON ACCESSIBILITY, FUEL, OIL, HYDRAULIC FLUID, AND OXYGEN SAMPLES S E C R E T ESIRED EXPEDITED ACTION. IMMEDIATELY S E C R E T roved For Release 2006/12/27 IA-R DP75BOO159ROO0400100051-1 EARLY MORNING 19 FEB. FOLLOWING ACTIONS ARE PLANNED: Approved For Release 2006/12/27: CIA-RDP75B00159R000400100051-1 WILL BE TAKEN. (D) UNTIL CLEAN UP IS ACCOMPLISHED IMPOSSIBLE TO REMOVE CLASSIFIED SYSTEMS Ar1D EQUIPMENT. PRESENTLY PLAN TO LEAVE EQUIPMENT INSTALLED AS IS UNDER GUARD AND REEVALUATE FEASIBILITY OF ATTEMPTING RyE1OVAL PRIOR TO MOVING AIRCRAFT. 4'kPPEARS NOW THAT BEST POSITION MAY BE TO REMOVE SYSTEMS AFTER AVAILABILITY OF SALVAGE EQUIPOENT FROM WILL BE ESTABLISHED. OTHER EQUIPMENT WILL BE IDENTIFIED AND MOVED FROM (F) LOCATION AND IDENTIFICATION OF ADDITIONAL 25X1 25X1 WITNESSES AT INCLUDING BRIEF OR TRANSCRIPT OF UHF TRANSMISSIONS ON 25X1 2. GENERAL CLEANUP IN AREA WILL REQUIRE APPROXIMATELY ONE DAY. AFTER CLEANUP AIRCRAFT WILL BE RETAINED IN PRESENT CONFIGURATION UNTIL VIEWED BY INVESTIGATION TEAM. WILL ATTEMPT TO TAKE CONCERNED ON SUNDAY AFTERNOON AND RETURN IF THEIR ARRIVAL TIME PERMITS. SALVAGE OPERATIONS COULD THEN COMMENCE ON MONDAY AND PROBABLY BE COMPLETED TUESDAY. DELAYING THE ABOVE ACTIONS UNTIL TEAM ARRIVES WOULD PROBABLY EXTEND COMPLETION OF SALVAGE UNTIL AT LEAST NEXT THURSDAY. TEAM MEMBERS FRO19 FOR VIEW OF SITE 3. HAVE REQUESTED) BY SEPARATE MESSAGE LATEST ND 25X1 WRIGHT PATTERSON FUEL REPORT ON BATCH 41 A WHICH WAS USED EXCLUSIVELY FROM 4 FEB THROUGH 16 FEB. 4. CAUSES OF REPORTED OVER TEMP WHICH LEAD TO SHUT DOWN REMAIN UNKNOWN AT THIS TIME. ALSO HAVE NO FACTUAL INFO TO SUPPORT WHETHER (CONT?D) S E C R E T Approved For Release 2006/12/27: CIA-RDP75B00159R0004000100051-1 1 r7 ( Irk 96935) S E C R E T 25X1 PAGE =3- (P; NOT ANY OTHER SYMPTOMS WERE MUTED. INSPECTION AND/OR TDR 0;' ENGINE AND ACCESSORIES SHOULD PROVIDE ANSWERS TO THE QUESTION, DETERIOTATION OF WEATHER AT "IN SIGHIT AND GOING CHANNEL ONE" PROBABLY CAUSED PILOT TO 25X1 DIVERT TJ REASON FOR ATTEMPT EO FLAMED OUT APPROACH 25X1 DOWN WIND AT c UNKNOWN. DISCUSSION WITH TOWER PERSONNEL MAY SHED) LIGHT UN THIS POINT. 5. NAMES OF CASUALTIES AND FATALITIES WITH FAMILY ASSOCIATION WILL BE VERIFIED AT THE SCENE NEXT VISIT. PROPERTY DAMAGE WILL ALSO BE FURTHER IDENTIFIED.