AN INTRODUCTION TO REPORTS MANAGEMENT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP75-00399R000100020006-9
Release Decision: 
RIFPUB
Original Classification: 
K
Document Page Count: 
7
Document Creation Date: 
December 19, 2016
Document Release Date: 
December 20, 2006
Sequence Number: 
6
Case Number: 
Publication Date: 
July 1, 1954
Content Type: 
STUDY
File: 
AttachmentSize
PDF icon CIA-RDP75-00399R000100020006-9.pdf286.06 KB
Body: 
Approved For Release 2006/12/27: CIA-RDP75-00399R000100020006-9 412~'LOA.GLG~~O~L at APPENDIX A REPORTS MANAGEMENT WHAT IS REPORTS MANAGEMENT? WHY IS IT NEEDED? HOW IS IT ADMINISTERED AGENCY WIDE? HOW IS AN AREA PROGRAM INSTALLED AND CONTINUED? MANAGEMENT STAFF RECORDS MANAGEMENT DIVISION JULY 1954 Approved For Release 2006/12/27: CIA-RDP75-00399R000100020006-9 Approved For Release 2006/12/27: CIA-RDP75-00399R000100020006-9 WHAT IS REPORTS MANAGEMENT? IT IS A CON.TINUING,PROGRAM OF PLANNED I EPORTS ANALYSIS DESIGNED TO... ? IMPROVE THE QUALITY OF REPORTS and ? ELIMINATE THOSE NOT NEEDED. ? ASSURE THAT REPORTS ARE PREPARED BY THE SIMPLEST AND LEAST EXPENSIVE MEANS. Approved For Release 2006/12/27: CIA-RDP75-00399R000100020006-9 Approved For Release 2006/12/27: CIA-RDP75-00399R000100020006-9 WHY IS A REPORTS MANAGEMENT PROGRAM NEEDED? LET'S FACE IT! AN AGENCY-WIDE NETWORK OF REPORTING SYSTEMS IS NEC- ESSARY. OUR ORGANIZATION IS COMPLEX. OUR OPERATIONS ARE WORLD WIDE. WE MUST DEPEND ON REPORTS FOR CONTROL OVER THESE OPERATIONS. BUT WITHIN SUCH A FRAMEWORK. SOME.UNNECES. SARY AND INADEQUATE REPORTING IS BOUND TO EXIST. SEEKING OUT AND CORRECTING THIS CON- DITION, AND PREVENTING ITS RECURRENCE, CALLS FOR A COORDINATED AGENCY-WIDE PROGRAM OF REPORTS ANALYSIS. HOW WILL THE AGENCY PROGRAM BE ADMINISTERED? I T IS PROPOSED' THAT THE AGENCY PROGRAM BE A DECENTRALIZED ONE. THAT IS, IT WILL BE COMPOSED OF MANY AREA PROGRAMS ESTABLISHED AT LEVELS WHERE MAXIMUM BENEFITS CAN BE EXPECTED FROM REPORTS;MANAGEMENT. THUS COMPONENT (AREA) PROGRAMS CAN BE DESIGNED TO MEET-SPECIFIC NEEDS. EACH AREA PROGRAM SHOULD COVER AS A MINIMUM: ALL RECURRING ADMINIS. TRATIVE OR MANAGEMENT REPORTS REQUIRED FROM, OR PREPARED FOR... (1 )' OTHER, HEADQUARTERS COMPONENTS. (2) ANY CONTINENTAL OR OVERSEAS FIELD ACTIVITY. (3)..ANY ORGANIZATION, FEDERAL OR PRIVATE, OUTSIDE THE AGENCY. EMPHASIS IS THUS PLACED. ON MANAGING RECURRING ADMINISTRATIVE OR MAN- AQEMENT REPORTS. HOWEVER, THIS SHOULD NOT EXCLUDE APPLYING REPORTS MANAGEMENT PRINCIPLES TO ONE-TIME ,REPO;RTS, OR. THOSE WHICH PROVIDE . FOR THE C;OLL_ECTION, PRODUC- TIONjjOR DISSEMINATION OF INTELLIGENCE. I.. r Approved For Release 2006/12/27: CIA-RDP75-00399R000100020006-9 Approved For Release 2006/12/27: CIA-RDP75-00399R000100020006-9 HOW IS AN AREA PROGRAM INSTALLED? REGARDLESS OF THE SIZE OF YOUR ORGANIZATION OR THE COMPLEXITIES OF ITS REPORTS, CERTAIN STEPS ARE ESSENTIAL. LET'S BRIEFLY EXAMINE THESE. STEP I - THE REPORTS INVENTORY NVENTp Rl' D"\ rA SHEET % No ,, I THIS STEP BUILDS THE PROGRAM'S FOUNDATION. I T RO DE:S D FOR A MED A E L YS S ..,., I lN IMr I /YI'1 i M V '. . I VI YOUR h ^03 ~ REPORTS, AND FURN I SHES RECORD MATERIAL FOR CON- w C g ~4a IMEN COPIES OF THE REPORT, COPIES OF PERTINENT ti DIRECTIVES OR INSTRUCTIONS, ANDOTHER DESCRIP. STEP 2 - THE REPORTS ANALYSIS THE MOST OPPORTUNE TIME FOR THIS ANALYSIS IS DURING THE INVENTORY. IT IS THEN THAT PROBLEM AREAS ARE REVEALED. FURTHERMORE, THE INVEN- TORY DATA SHEET CAN BE USED TO RE- CORD RECOMMENDATIONS. ANALYSIS PROJECTS SHOULD BE PLANNED AND COORDINATED. HERE'S WHY..... 2. THE PROBLEMS OF THOSE WHO REQUIRE REPORTS AS WELL AS THOSE WHO MUST PREPARE AND SUBMIT THEM SHOULD BE CONSIDERED. 3. AN ANALYSIS OF REPORTING DOCUMENTS ALONE IS NOT ENOUGH. EQUALLY IM- PORTANT IS AN EXAMINATION OF THE RELATED PROCEDURES AND RECORDS. 4. OUR REPORTING SYSTEMS CONTAIN A WIDE VARIETY OF NARRATIVE, TABULAR, GRAPHIC, AND PUNCH CARD REPORTS. ANALYZING THESE REQUIRES A KNOWLEDGE OF MANY TECHNIQUES. THE SERVICES OF AGENCY SPECIALISTS MAY THEREFORE BE NEEDED. -a~ I ADDITION, IT WILL BE DESIRABLE TO ATTACH SPEC. Approved For Release 2006/12/27: CIA-RDP75-00399R000100020006-9 Approved For Release 2006/12/27: CIA-RDP75-00399R000100020006-9 GUIDES (AND PERSONAL ASSISTANCE. IF DESIRED) WILL BE FURNISHED BY THE REPORTS AND CORRESPONDENCE MANAGEMENT BRANCH. ALSO, THE INVENTORY DATA SHEETS CONTAIN BASIC QUESTIONS TO AID THE ANALYST. FOR EXAMPLE: 9. COMPLETE THE FOLLOWING USING SPACE 10 IF NECESSARY: YES NO A. DOES INFORMATION IN THIS REPORT DUPLICATE IN ANY MANNER DATA IN OTHER REPORTS YOU PREPARE? IF SO. SPECIFY THE REPORTS. B. IS THE INFORMATION REPORTED IN MORE DETAIL, SUBMITTED MORE FREQUENTLY, OR GIVEN WIDER DISTRIBUTION THAN IS CONSIDERED NECESSARY? IF SO. EXPLAIN AND RECOMMEND CHANGES. C. IS YOUR OFFICE ABLE TO MEET THE REQUIRED SUBMISSION DATE FOR THIS REPORT WITHOUT DETRIMENT TO OPERATIONS? IF NOT, EXPLAIN. SPECIFY IF ANY OVERTIME HAS BEEN REQUIRED TO MEET DUE DATES. RECOMMEND CHANGES. D. IS THE FORM OR FORMAT PRESCRIBED FOR THIS REPORT ADEQUATE WITH REGARD TO: (1) SPACING - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - (2) WEIGHT OF PAPER? (Can sufficient copies be made at one typing?)_ - _ - _ - - (3) POSSIBLE ELIMINATION OF TRANSMITTAL LETTERS? - _ _ _ - _ - _ _ - - - - _ _ - - E. IF THE REPORT IS REPRODUCED BY MIMEOGRAPH. DITTO, MULTILITH.ETC.. DO THE MASTERS CONTAIN THE MAXIMUM AMOUNT OF PREPRINTED DATA (headings, lines, etc.)? F. ARE INSTRUCTIONS FOR THE PREPARATION OF THIS REPORT CLEAR AND COMPLETE? G. WOULD YOUR OFFICE CONTINUE TO: (1) MAINTAIN - - - - - - - - - - - - - - - - - - - (2) COMPILE - - - - - - - - - - - - - - - - - - - THE DATA BEING SUBMITTED IN THIS REPORT. IF THE DIRECTIVES FOR ITS SUBMISSION WERE RESCINDED? IF SO, EXPLAIN. 10. WHAT IS YOUR APPRAISAL OF THIS REPORT? RECOMMEND ANY IMPROVEMENTS INCLUDING REVISED PREPARATION PROCEDURES. r----~ .11,"""'.'~~ I., .............................................................. . ..... D. IS THE INFORMATION REQUIRED BY YOUR OFFICE APPROPRIATE TO ITS ASSIGNED FUNCTIONS, RESPONSIBILITIES, AND AUTHORITY? E. IS THE INFORMATION REQUIRED ACTUALLY AND ACTIVELY USED AS A BASIS FOR ACTIONS. PLANS. OR DECISIONS. AND DOES SUCH USE FULLY JUSTIFY THE COST OF PREPARING THE REPORT? F. DOES THE NEED FOR THIS REPORT RESULT FROM ADMINISTRATIVE OR PROCEDURAL PROBLEMS WHICH SHOULD BE CORRECTED RATHER THAN REPORTED? IF SO,, RECOMMEND CHANGES. G. IS THE REPORT DESIGNED TO SERVE A PURPOSE WHICH COULD BE ACCOMPLISHED MORE EFFECTIVELY SOME OTHER WAY SUCH AS THROUGH DIRECT SUPERVISION OR INSPECTION? IF SO. RECOMMEND REVISIONS. Approved For Release 2006/12/27: CIA-RDP75-00399R000100020006-9 Approved For Release 2006/12/27: CIA-RDP75-00399R000100020006-9 STEP 3 - THE REPORTS REVIEW FINDINGS AND RECOMMENDATIONS WHICH RESULT FROM THE WORKING-LEVEL REPORTS ANALYSIS GENERALLY REQUIRE STUDY OR RESOLVING BY HIGHER AUTHORITY. THIS IS THE PURPOSE OF THE REPORTS REVIEW. THE AREA RECORDS OFFICER AND REPRESENTA- TIVES OF THOSE UNITS CONCERNED WITH THE REPORTS UNDER REVIEW SHOULD PARTICIPATE. IN ADDITION, A MEMBER OF THE REPORTS AND CORRESPONDENCE- MANAGEMENT BRANCH WILL BE MADE AVAILABLE TO SERVE IN AN ADVISORY CAPACITY. IF DESIRED, A PANEL MIGHT BE ESTABLISHED FROM WHICH COMMITTEES COIJLD BE APPOINTED TO REVIEW REPORTS. ON THE BASIS OF THIS REVIEW... SOME REPORTS WILL BE FOUND ESSENTIAL IN EVERY RESPECT. OTHERS WILL BE CORRECTED IMMEDIATELY... OR CANCELLED! ...WHILE STILL OTHERS MAY REQUIRE FURTHER STUDY. Approved For Release 2006/12/27: CIA-RDP75-00399R000100020006-9 Approved For Release 2006/12/27: CIA-RDP75-00399R000100020006-9 STEP 4 - ESTABLISHMENT OF PROGRAM RECORDS CASE FOLDERS AND REFERENCE FILES SHOULD BE ESTABLISHED CENTRALLY ON EACH REPORTING REQUIREMENT AS A BASIS FOR CONTINUING THE PROGRAM. RECORD MA- TERIAL WILL RESULT FROM THE INVENTORY, ANALYSIS, AND REVIEW. TO BE SUCCESSFUL, THE PROGRAM MUST PRO- VIDE FORA CONTINUING REVIEW OF REPORTS. EACH NEW OR REVISED REPORTING REQUIRE- MENT SHOULD BE SCREENED FOR NECESSITY BY APPROPRIATE AUTHORITY PRIOR TO BEING ESTABLISHED. EACH CURRENT REPORTING REQUIREMENT SHOULD BE RE-EXAMINED AT LEAST ANNUALLY TO ENSURE THAT ITS CONTINUANCE IS FULLY JUSTIFIED. THESE RE- REVIEWS SHOULD BE STAGGERED THROUGHOUT THE YEAR TO DISTRIBUTE THE WORKLOAD. THE RE-EVAL- UATION PROCESS CAN BE SIMILAR TO THAT USED TO ANALYZE THE REPORTS DURING THE INSTALLATION PHASE. THAT IS, OPERATING PEOPLE EXAMINE THEIR REPORTING REQUIREMENTS AND SUBMIT RECOMMENDA- TIONS TO A REVIEW BODY FOR ACTION. IT SHOULD BE REMEMBERED THAT AN ANNUAL REVIEW IS ADEQUATE ONLY IF CONDI- TIONS REMAIN STABLE. PROGRAMS ON WHICH INFORMATION IS REPORTED MAY AC. CELERATE OR DECELERATE RAPIDLY. CHANGES IN ORGANIZATION AND FUNCTIONS TAKE PLACE. NEW FORCES OR TRENDS COME INTO BEARING. UNDER THESE CONDI- TIONS REPORTS SHOULD BE CONTINUALLY APPRAISED TO ASSURE THAT THEY ARE ECONOMICALLY SERVING THE PURPOSES FOR WHICH THEY WERE ESTABLISHED. IF THIS IS DONE YOU CAN BE ASSURED OF.... FEWER REPORTS, BETTER REPORTS, AT LESS COST! A STAFF REPRESENTATIVE WILL BE PLEASED TO DISCUSS REPORTS MANAGEMENT FUR- THER WITH YOU. CALL EXTENSION 3742. Approved For Release 2006/12/27: CIA-RDP75-00399R000100020006-9