CABLE FROM (Sanitized) TO PRIORITY (Sanitized) INFO (Sanitized)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP74B00836R000100040032-1
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
2
Document Creation Date: 
December 14, 2016
Document Release Date: 
October 16, 2002
Sequence Number: 
32
Case Number: 
Publication Date: 
July 1, 1966
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP74B00836R000100040032-1.pdf98.96 KB
Body: 
m mots 25X1 25X1 xulftw~s Approved For Relee 2002/101.25@836R 1. RECOMMEND THE FOLLOWING ACTIONS BE TAKEN TO CLEAN UP THE ENGINE SITUATION: A. ALL ENGINE RECORDS BE REVIEWED AND ANY ENGINE WITH A TURBINE HISTORY INDICATING REMOVAL FOR OVERHAUL DUE TO OVE BE WITHDRAWN FROM SERVICE UNLESS RECORDS INDICATE T R SC REPLACEMENT. (FYI TURBINE HISTORY RECORD FOR TURBINE DISC TURBINE DISCS ONE AND TWO HAD BEEN SUBJECTED 611434 SHOWS -F-116 INSTALLATION) TO OVERTEMP IN $. INSPECT ALL ENGINES FOR SHINGLING ON POST FLIGHT. INSP TO BE ACCOMPLISHED BY ENTERING TAIL PIPE. A LOCALLY ,MANUFACTURED CONTOUR BOARD SHOULD BE PLACED IN TAIL PIPE TO PREVENT DAMAGE AND DISTRIBUTE WEIGHT. THIS REQT TO BE 'RE-EVALUATED SUBSEQUENT TO INSTALLATION OF NEW NO I DISCS G. P- ? 17 ENGINE CONVERSIONS NOT SE FLOWN ON OVER-FLIGHTS REPRODtlG'tIAN By OTHER ~.... -' N THE ISSUING 4FI~'ICE IS PROIBITED. 2 25X1 25X1 Approved For ReI?W3e 2002/10/25: CIA-RDP74B00836ROQ00040032-1 25X1 UNTIL NO I DISCS HAVE BEEN REPLACED OR POSITIVELY CONFIRMS FAILURE IN 611434 DUE TO SHINGLING. D. REPLACE PRESENT THREE POSITION FUEL CONTROL SELECT SWITCH WITH TWO POSITION TO HELP PRECLUDE INADVERTANT SELECTION (IN-64506) T 0 P S E C R E T /PAGE 2/ 25X1 25X1 CONFIRMS THIS WOULD REDUCE RISK OF POSSIBLE OVERTEMPERATURE DURING START. F. DELETE REQUIREMENT FOR FULL POWER TAKE-OFFS FROM -6 TEST FLIGHT PROCEDURES. G. LIMIT ALL TAKE-OFFS TO GATE POWER. 2. FOR HQ RECOMMEND IMMEDIATE ADOPTION OF THESE PROCEDURES AND RELEASE OF ACFT FOR FLIGHT. REF PARA ID, THIS IS A "MURPHY" ITEM AND SHOULD NOT BE CONSIDERED A REQUIREMENT FOR RELEASE OF AIRCRAFT. 3. A NO I DISC REPLACEMENT PROGRAM SHULD BE ESTABLISHED AS SOON AS POSSIBLE WITH PRIORITY GIVEN ENGINES IN THE FOLLOWING ORDER t A. ENGINES WITH TURBINE DISC HISTORIES OF OVERTEMP. B. P-I7 ENG CONVERSIONS C. P-19W ENG CONVERSIONS D. P-2 ENG CONVERSIONS OF EMERGENCY POSITION ON START. E. INCREASE MINIMUM START RPM TO 16 PERCENT IF 25X1 HEQUE:ST II GATHER ALL REQD INFO AND ESTABLISH SCHED FOR REVIEW BY HQTS. T 0 P S E C R E T TORt '010626Z JUL 66 Approved For ReleaseT26b2?10/ ECIS4-I DANTB00836R000100040032-1