TEST PROCEDURE COVERING MOTORIZED FILING EQUIPMENT, BAY 2, SECTION 3,(Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP74-00005R000100070028-7
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 9, 2016
Document Release Date:
July 12, 2000
Sequence Number:
28
Case Number:
Publication Date:
August 27, 1971
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP74-00005R000100070028-7.pdf | 98.53 KB |
Body:
25X1C4a
n,,4?p!i~~Pr~ker2f@8#,?0fl?ROR07t}028z7t~o........... cr..........
..................
..,.. 'iofixed.. ilinS:. au" nment...._... Je:. No... .. .....................
Ya
nr,. ,; ac,t ............ I3`iY-?2....5~.ct~ os...3.,.. 'slg.. .......................................
u:dcr simulated operating conditions.
?urnose: To establish a test, procedure for the equipment now installed,
Units at start of. each test 'cycle.
20st.on and identification (for test purposes only) of Movable
T I [. I ~1~ . Z -
T
A
A t I
T
Aisle
E 2
a. Repeat Step la.,
25X1A6a
To-sit Cy'cle,: 'A complete test cycle shall consist of the movement of the equip-
ment through each of the enumerated.steps.belov,'interrupted by a simulated
filing, action..
Step' 1. Move Units A,B,C',D & E to Stationary 2 (time, 12 sec.)
a. Employee walks to the end of the. first carriage (17 ft.)
and slides a box forward to normal operating position
and returns box to original position (est,imated time, 48 sec.)
Step 2., Move Units E,D,C,B & A to Stationary 1.
Step 3. Move'Units B,C,D & E to.Stationary'2.
a. Repeat Step.la.
'Step 4. 'Move Units E,D,C & B to _Unit A.
a Repeat Step Ia..
Step 5. -Move Units'C,D & E to Stationary 2.
a., Repeat Step' la.
Step 5. Move Uni.:s E,D & C to Unit B.
a. Repeat Step Ia.
Step 7.. Move Units D & E to Stationary 2.
a. Repeat Step Ia.
Step 8. Move Units E & D, to Unit.C.
a. Repeat Step Ia.
Approved For Release 2000108/24: CIA-RDP74-00005R000100070028-7
Approved For Release 20 2P/jaP~?00007 7r:o........... o,:...........
...... D A ? S.U iii= .. ....
............
J U v ti G...................
.D. . Y......... .OA..... .................................. ... ..................................
..... .......................;.. ... ._................
stop 9., Move UnitE to Stationary 2.
a. Repeat Step la.
Step 10. Move Unit E to Unit D.
a. Repeat Step la..
Upon completion of.above cycle each possible combination of Movable Units
has bcen moved from left to right and right to left.
m~.rain : On the basis of 60 seconds per cycle step a complete test cycle will
require 10 minutes resulting in 6 test cycles per hour or 48 for an 8 hour days
Each test cycle represents 10~filing actions; an'8 hour day of testing is .
equivalent to 480 simulated actions. Normal operations would exceed time
allowed for simulated operation due to associated clerical work required after
.box is pulled out on shelf. .
Monitoring: A full time parson shall be assigned to observe the test to main-
that each step in each cycle is
l
assure
twin a continuous record which wil
completed. Record shall contain notation of any equipment malfunction as
;elated to any step in any cycle.
Test Period: Upon completion of 50 full 10 Step Cycles test shall be con-
idered complete. Copy of test record provided in 5. above shall be distri-
buted to all persons.concerned.
Approved For Release 2000/08/24: CIA-RDP74-QO.005R000100070028=7