ARCHIVES AND RECORDS CENTER SHELVING PROJECT(Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP74-00005R000100070003-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 9, 2016
Document Release Date:
July 12, 2000
Sequence Number:
3
Case Number:
Publication Date:
December 15, 1971
Content Type:
MF
File:
Attachment | Size |
---|---|
CIA-RDP74-00005R000100070003-4.pdf | 67.15 KB |
Body:
-ab DEC 1911 Approved For Release 2000/08/24: CIA-RDP74-00005R000100070003-4
JAL tJ
1 5 DE.C 197
25X1 C4a1
25X1A5a1
that in order to get an acceptab e
should take over the project as a 100 per
did take over the project:
completing the new construction, but they
i:::ROR DUU FOR Director of Logistics
Chief, Real :state and Construction
Division
SU JECT . Archives and cords Center Shelving,
Project,
until 7 April 1972.
25X1A6a
1. As you know, the 1 oveable Shelving Project in the
Archives and i.ecords Center building got off to a very slow
start. This was due primarily to a lack of design details and
the inability of the original contractor to cope with that type
of shelf construction. The contract was originally scheduled
for completion on 16 December 1971; however, the contractor was
successful in obtaining au extension which would run the contract
25X1A5a1
2. Even with this additional time the contractor could
not build an acceptable product. On 1 October 1971, he con-
vinced the manufacturer of the equipment
are reworking; the construction completed by the original con-
tractor to bring it up to their higher standards. lnis rework
is to be done without any additional cost to the Agency; however,
additional time will be required.
3. I believe that, since this rework will produce a more
acceptable product, it is in the best interest of the Agency to
grant additional time; and I recommend that the proposed new
completion date of 2 June 1972 be established.
25X1A9a
ef, Support Services ;staff
Approved FdrR6l&?000/04[JDP74-00005R000100070003-4
1-SSS Chrono
~5/RAB Subject
DDS/SSS/i2AB/A&RC/CEii:rf (15 Dec. 71)
Distribution: