ARCHIVES AND RECORDS CENTER SHELVING PROJECT(Sanitized)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP74-00005R000100070003-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 9, 2016
Document Release Date: 
July 12, 2000
Sequence Number: 
3
Case Number: 
Publication Date: 
December 15, 1971
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP74-00005R000100070003-4.pdf67.15 KB
Body: 
-ab DEC 1911 Approved For Release 2000/08/24: CIA-RDP74-00005R000100070003-4 JAL tJ 1 5 DE.C 197 25X1 C4a1 25X1A5a1 that in order to get an acceptab e should take over the project as a 100 per did take over the project: completing the new construction, but they i:::ROR DUU FOR Director of Logistics Chief, Real :state and Construction Division SU JECT . Archives and cords Center Shelving, Project, until 7 April 1972. 25X1A6a 1. As you know, the 1 oveable Shelving Project in the Archives and i.ecords Center building got off to a very slow start. This was due primarily to a lack of design details and the inability of the original contractor to cope with that type of shelf construction. The contract was originally scheduled for completion on 16 December 1971; however, the contractor was successful in obtaining au extension which would run the contract 25X1A5a1 2. Even with this additional time the contractor could not build an acceptable product. On 1 October 1971, he con- vinced the manufacturer of the equipment are reworking; the construction completed by the original con- tractor to bring it up to their higher standards. lnis rework is to be done without any additional cost to the Agency; however, additional time will be required. 3. I believe that, since this rework will produce a more acceptable product, it is in the best interest of the Agency to grant additional time; and I recommend that the proposed new completion date of 2 June 1972 be established. 25X1A9a ef, Support Services ;staff Approved FdrR6l&?000/04[JDP74-00005R000100070003-4 1-SSS Chrono ~5/RAB Subject DDS/SSS/i2AB/A&RC/CEii:rf (15 Dec. 71) Distribution: