WEEKLY ACTIVITY FOR OXCART PROGRAM - WEEK ENDING 9 JUNE 1963
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP71B00590R000200030005-7
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
November 16, 2016
Document Release Date:
March 16, 2000
Sequence Number:
5
Case Number:
Publication Date:
June 10, 1963
Content Type:
CABLE
File:
Attachment | Size |
---|---|
CIA-RDP71B00590R000200030005-7.pdf | 154.07 KB |
Body:
Approved For Release'!0O
as 1 7 1 4 Z 1 S E CR E T
TO t DIRECTOR
*cnorOSA ( 1-15)
W FO B Sr/ C f 16)
TOR 180,5:Z 1 0 JUN 63
xo
PRITY _ INFO
OXCART
F% 6- V; ~ To A 9
TO DR. SCOVILLE INFO JOHN PARANGOSKY FROM KELLY JOHNSON
SUBJECTZ WEEKLY ACTIVITY FOR OXCART PROGRAM ?_ WEEK ENDING
9 JUNE 1963.
TWO FLIGHTS ACCOMPLISHED THIS PERIOD. AIRCRAFT 121 AND 122 WERE
READY FOR FLIGHT FRIDAY AFTERNOON BUT DID NOT FLY DUE TO BAD
WEATHER, AIRCRAFT 124 MADE TWO FLIGHTS TO OBTAIN DATA TO BE USED
BY ACCIDENT INVESTIGATION BOARD IN STUDY Or AIRCRAFT 123 LOSS.
ACCIDENT BOARD HAS COMPLETED FORMAL REPORTS AND INTERROGATION
OF PILOT WHO BAILED OUT OF AIRCRAFT 123. AIRCRAFT RELEASED FOR
FLIGHT TO PROCEED WITH PROGRAM BASED ON REPORTS FROM ACCIDENT
BOARD. TOTAL FLIGHT TIME TO DATE 329 HRS. 14 MINUTES. TOTAL NU%!BER
FLIGHTS 238,
AIRCRAFT 121 AND 122 WERE BOTH ON STANDBY FLIGHT STATUS FRIDAY
AFTERNOON HOLDING FOR WEATHER. BOTH AIRCRAFT WILL BE UTILIZED
IN TESTS TO ESTABLISH THE OPTIMUM CONFIGURATION FOR SPEED ALTITUDE
EXTENSION TO CRUISE CONDITIONS, IT IS BELIEVED THAT SEVER At"ATTEMPTS
SECRET
Approved For Release 20L05/05: CIA-RDP71 B005 rR 005-7
'RODU "TtON BY OTHER THAN THE ISSUING OFFICE IS PRO I ~~ Copy No.
Approved For Release'9600/05/05: CIA-RDP71 B00590R 0020003OQ05-7
25X1A
S E C R E T
6974 (IN 7926$) PAGE TWO
TO ACCELERATE TO MAXIMUM MACH WILL BE REQUIRED BEFORE THE
PROPER CONFIGURATION CAN BE ESTABLISHED TO PRODUCE A MATCH BETWEEN
THE INLET DUCT AND ENGINE AIRFLOW REQUIREMENTS.
AIRCRAFT 124 MADE TWO FLIGHTS THIS PERIOD. THE FIRST FLIGHT WAS
MADE TO ESTABLISH THAT SUFFICIENT PITCH CONTROL WAS AVAILABLE TO
THE PILOT OF AIRCRAFT 123 TO NOSE OVER AND INCREASE AIRSPEED AT ANY
TIME WHEN SLOWING DOWN TO 125 KEAS HAD HE ELECTED TO DO SO. TESTS
ON AIRCRAFT 124 PROVED THIS CONCLUSIVELY. OTHER FLIGHT CONDITONS
SUCH AS CLIMBING TURNS AND DESCENTS SIMULATING WHAT THE PILOT
REPORTED HE DID PRIOR TO BAILOUT WERE SIMULATE ON THE SECOND
FLIGHT. THIS WAS DONE TO PROVE THAT IT WAS IMPOSSIBLE TO ACHIEVE THE
1.05 MACH READING HE REPORTED SEEING ON THE TRIPLE DISPLAY
INDICATOR USING ANY POWER SETTING BELOW THE AFTERBURNER REGIME,
THIS ALSO WAS PROVED TO SATISFACTION OF ALL CONCERNED, RESULTS OF
THESE TESTS WERE SUBMITTED TO THE ACCIDENT BOARD.
AIRCRAFT 125 IS STILL BEING SUBMITTED TO THE ENGINE FOREIGN OBJECT
DAMAGE CORRECTIVE NACELLE MODIFICATIONS AND INSPECTION
PROCEDURES SPECIFIED IN REPORT SP-526 DATED 7 MAY 1963. ALSO
REPLACING METAL RUDDERS WITH STANDARD TYPE, REINSTALLING REMOTE
GEAR BOXES AND ACCOMPLISHING OTHER SERVICE BULLETIN WORK. AFTER
F. O. D.4 CORRECTIVE ACTION COMPLETE,, WILL HAVE TO REINSTALL ENGINES,
ACCOMPLISH SYSTEMS CHECKOUT AND DO NORMAL PREFLIGHT PREPARATION.
NOW EXPECT TO FLY 21 JUNE 1963.
AIRCRAFT 126 EXPECTED TO BE ON FLIGHT STATUS ON 11 JUNE 1963 PROVIDED
ENGINE GROUND RUNS SUCCESSFUL PRECEDING DAY. NACELLE CLOSURE
Approved For Release 2000/05/05 ?OIACRE)Ml1b00590R000200030005-7
Approved For Re I ease IMOO/05/05 : CIA-RDP71600590E+1Q00200030Q05-7
25X1A SECRET
65974E (IN 796208) PAGE THREE
COMPLETE THIS PERIOD FOLLOWING F.O. D. CORRECTIVE ACTION SPECIFIED
IN REPORT SP-526.
AIRCRAFT 127 SCHEDULE NOT YET AVAILABLE SHOULD BE EARLY JULY.
ENb OF MESSAGE