F. Y. 1966 PRESIDENTS BUDGET
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP71B00508R000100030028-4
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
4
Document Creation Date:
December 15, 2016
Document Release Date:
October 28, 2002
Sequence Number:
28
Case Number:
Publication Date:
January 19, 1965
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 153.84 KB |
Body:
#IriU LE Y? i
Approved For Releal 2002/11/15 :?Gil'A-Rfl7~i0'0508R -
EIPARTMENT OF THE AIA FORCE
'WASHINGTON
OFFICE OF THE UNDER SECRETARY
NRO REVIEW COMPLETED
MEL ORANDUM FOR COLONEL JACK L E DID ORD ,
DIRECTOR, PROGRAM 13
SUBJECT: F.Y. 1966 President's Budget
?9JANi9 5
The F.Y. 1966 President's Budget for your directorate
as approved by OSD and the Bureau of the Budget, and
compared with your initial and revised submissions, is
as follows:
Oxcart (Excluding Engine R&D)
Initial
?evised
.1irframe Support
initial
"levised
C,msiderai ions and detail`s
-Led 17 . Dec 64 .
ngine Support
Dir. B
Submission
Initial
R evised
Considerations and details were included
dated 17 Dec 64 .
Cameras
Radar
Initial
Revised
initial
Revised
Initial
devised
~n al
-wised
Included in
FY66Budget
25X1A
25X1A
25X1A
in
25X1A
25X1A
25X1A
25X1A
25X1A
COPY_, OF- 9 -CO?lES'
0028FAGE_ / OF_
L:: .UDID FDOAp ? ~~e 6r e~ ae"2002/'11/15: CIA-RD 71 QA 08R0001000
~~
ti
_'
U
rl~l
DOD DTI,,. 5200.10 DOES NOT A2PL? [
SAF5S L 6q%-G5
U, vz..vv~:~ n
JuN `
1~ 1 Li~
Approved For Rele a 2002/11/15 : CIA-RDP71B00508R0O6600030028-4
25X1A
25X1A
(!perations and Maintenance
evised
) i.. B
SuDmi sion
'a-_rborne Electronic Equipment
revised
Wia1
Revised
Included in
FY66 Budget
Idealist
3itial (U-2L Basis)
initial (Convert
CAC A/C Basis)
The procurement of U-2L's was not approved for the
1Y1966 budget. Against the conversion basis, the primary
reduction is O for 8 Delta II cameras specifically
related in the submission to U-2L,.w,hich should not have
been included.
Initial 0 25X1A
25X1 NRO The requirement was no approved, on the basis
`=a 1 d be a spare aircraft, and in consideration
i the FY1965 availability of an additional P2V not
iicinated at the time of estimate preparation.
)-borne Collection
25X1A
I
This is a general, rather than specific reduction at
1is time.
r .tea Mass
25X1A
25X1A
25X1A
a succeeding Advanced Studies and Miscellaneous account. NRO
This item was not approved for the FY1966 budget as such.
Advanced aircraft study proposals will, be considered under
25X1
$yiyed For Release 2002/1' J 7'I, RY54A
25X1A
0PY_.f OFCO?1FS'
LjGG_ 3- _OF_Y _FAcES
rnF,T IAFSS t o~19- G s-
Approved IReleasdf
25X1
25X1
NRO
25X1
I Initial
M,
tfF p! 1' r if'A
2KI1 J~ qj PIA-RpI 7
Dir. B Included in
Submission FY66 Budget
The I I as such was not
t, .e FY1965 budget.
25X1 A The
as not approved
P:.oto Balloon
Initial
The Photo balloon was not approve or the FY1966 budget.
25X1A Photo Material and Processing
This represents a reduction from your submission of
The bud,-.et estimate is for advanced aircraft study effort
and miscellaneous costs not yet defined..
for film and chemicals and II for processing.
0
approved for
0
for the FY1966
budget.
Ac.vance Studies and Miscellaneous
Ynitial j
For purposes of advance planning on contract management
and workloads, it is anticipated that. approxima~ely the
following amounts in the F,.71966 budget for other Directors
will be processed t'hru your directorate:
These costs and considerations are as approved for
the F.Y. 1966 President's budget. All programs and costs
SR-71 Aircraft (Earning)
YF-12A Aircraft (Kedlock)
J58. Engine R&D
Tagboard
Dragon Lady
CU TR= SYSTEM
Approved For Release 2002111115': Oft=F,
TOP SECRET }}~~
SAF SS~
25X1A
25X1
25X1A
25X1A
25X1A
25X1A
co-, Fs" ' 25X1A
_FA ES 25X1 A
Approved F f2elease 206 A AQ.WR&7466 5088000100 30028-4
~I;T u? SYSTz
will be subject to rejustification cr revision, re;ieww
c.nc approval in connect: of with the F .Y. 1936 funding
program in the May-June 1 065 time r cd .