OXCART AIRCRAFT CONFIGURATION AND FLIGHT TEST CONTROL BOARD (CCB)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP71B00263R000200100015-1
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
1
Document Creation Date:
November 17, 2016
Document Release Date:
February 5, 1998
Sequence Number:
15
Case Number:
Content Type:
MISC
File:
Attachment | Size |
---|---|
CIA-RDP71B00263R000200100015-1.pdf | 60.11 KB |
Body:
Approved For F~elease 2000/08/25: CIA-RDP71 ~f0263F~ 00015-1
SAMPLE LESSON PLAN ATTACHMENT TO
2186-67
LESSON TITLE: OXCART AIRCRAFT CONFIGURATION AND FLIGHT TEST
CONTROL BOARD (CCB)
OPERATIONS/OSA
PART I - OVERVIEW
1. LESSON OBJECTIVE: The objective of this lesson is for each
student to become familiar with the purpose, scope, and
procedures of the OXCART CCBo
2. INSTRUCTIONAL AIDS: Charts, Diagrams
3. TIME REQUIRED: 50 Minutes
4a PLAN OF PRESENTATION: The instructor will introduce the
lesson by a brief history of the OXCART CCB, its composition
and its general purpose, He will then explain the functions,
scopes and procedures of the CCB showing the co-ordination
necessary at all levels. The period will close with a summarX
of the major points presented,
PART II - TEACHING GUIDE
A, INTRODUCTION
1. History
2. Composition
3. Purpose
DEVELOPMENT
1.
Scope
(a) Aircraft and Systems
(b) Flight Tests
2.
Responsibilities
(a)
(b)
(c)
Full Participation
Program Projector
C onfiguration Control
3.
Procedures
(a) Standard Charts
(b) Charts for Individual Aircraft
(c) Determine Operational Deficiencies
(d) Provide General Specifications
(e) Validity of Test Requirements
(f) Test Control
(g) Co-ordination
C. CONCLUSION
Summary of principal points, i.e., Scope, Responsibilities,
and Procedures.
25X1A2g
HANDLE VIA ~
CONTROL SYSTEM
ved For Release 2000/08/25: CIA-RDP71 B00263R000200100015-1