WEEKLY REPORT - WEEK ENDING 24 MARCH 1954

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP70-00211R000300270007-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
11
Document Creation Date: 
December 19, 2016
Document Release Date: 
October 12, 2005
Sequence Number: 
7
Case Number: 
Publication Date: 
March 25, 1954
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP70-00211R000300270007-1.pdf614.81 KB
Body: 
~- Approved For Release 2005/11/ CIA-2DP70-00211R0QQ390$7-1 R " i'r.r T Acting Management Officer, MIS Chief, Records Management Branch Weekly Report - Week ending 24 March 1954 25 March 1954 S 3MARY OF PROJECTS Weekly Report - Week ending 17 March 1954 Projects in Process 19 This Week: Projects in Process 19 Added during week: 0 Completed during week; 0 Change 'S CNTS PROJECTS IN PRO=S Project 4-76 Records M,sna ent Survey, Medical Office Draft of report has been prepared on maintenance and disposition phases of survey. Remaining items concern foxes, reports and correspondence. Preliminary arrangements were made to complete these Items. Project approximately 65% complete. genre previous report. Project approvim stely 15% complete. Project 4-78 - Records Nana, meat Surve, Office of General Counsel Disposition and maintenance p:# have been completed in draft form. Project approximately 65% complete. Project 4-79 - Records M ement Survey, ?BID tal,tion of filing system throughout FBII) is continuing. eat approximately 57% complete. Project 4.8E - !MM-vide Mlcr2photoEaphy Survey No change from previous report. Project 4-81 - Security Desk Trerys As a result of a memorandum received from the Security Office will be necessary to redesign the desk tray without locks. Approved For Release 2005/11/21 : ~V1k3P70-00211 R000300270007-1 cFr. Approved For Release 200511-1121 CIA-RDP70-00211 R000300270007-1 Arran rents ha been mec wit ?t the Supply Division,, Logistics Office, to proceed with the procurement of 50 trays without locks on a trial, basis, This will delay the procurement of the total eati;ted number of trays for Agency use, Project approxi- 85% complete. Project 4-82 - Handbook for the Subject C. if'ic tion and Filing . ., c~ ence Records 25X1 Informal concurrences have been obtained from all offices which submitted co*s ntss . As soon as written concurrences are re- ceived, the handbook will be ready for resubvisoion to the Regu lations Control Staff. Project approximately 93% complete. ect 4--83 - Vital. i atcrisl additional schedules is continuing. Project approxi- lete. Project 4_884, _ iital.. Materials Microfilm Projects Microfilming of vital materials in OSI and OCD/BR is continuing, Prolcct 4-85 - FI Tnfortation. Rc ports ....sue.. Twelve record copies and an offset s ter vere pr-e .a ed Single typin'., utilizin, carbon-coated record paper. This test proved successful and the results were transmitted to FI. Proj- ect approximately 25% complete. Project -86 _ Forms Index of cards by the Machine Records Division is sproxi- ~i and functional lists can be prepared. Protect epproxi.- lete . y 35% Como omplete. When this operation has been finished, alp. Records Pans. a rent Proms-rar*,, Lois No activity, Ve have been requested to discontinue work on this project by Lo istice Office for approximately two weeks. Project approximately 10% complete. Ac uiaition of Certain co a an..,rsn vious report,.. Project approximately 25% cem- Project 1-s L?ff'ice of Comptroller Ties its No change from previous report. Project approximately 1M, c plete. Approved For Release 2005/11/21 : CIA-RDP70-00211 R000300270007-1 WE . Approved For Release 2005/11/21 : CIA-RDP70-00211 R000300270007-1 Pro eca w Vital Materials fi 3 k No activity. Project approxi telY 54, complete. P eet 4- Records Djs aositioa R. ndboo r activity. Project approximately 25% complete. Project 4-q - Corres ndence 'Handbook Jo activity. Awaiting on cents from the Ae u ations Control Staff. Project approxtmatety & complete. ?irai Cop, by Port Preliminary disc=, the Primtin; a.n 10% complete. eat approximately 2 complete. 25X1 Disposal schedules, previously prepared in connection with survey of Contact Division, are now being reviewed by the National Archives *m Records Service representative sign i to this Agency. Discusaion:4> were hel*3. vithi 081 a relative to reports and corre p n rc . ;. These pba .ses of records management will be included in the survey as soon as a representative from this office has received the necessary clearance so that we can proceed with the project. ration. of Regt1ations A preliminary draft, of ;en+eral regulations pertaining to ree- ds manazemont to the correspondence and reports mana,ment phases of the program his been prepare:l. n this pro rwn continues to increase. Requi- sitiI for the current week were 28 in couLrast to 24 for the previous week; number of copies r?;apxes+ nted by these rqquisi 4i,ons d to 225,200 as compared to 5$,&0o for the previous week Approved For Release 2005/11/21 : CIA-RDP70-00211 R000300270007-1 SECRET Approved For Release 2005/11/21 : CIA-RDP70-211R000300270007-1 Deposit of Vital Mater time required to handle increased cork load trips to 1Tednesday, Thursday and Friday mornings vital materials at the Repository requires re "basis rather than on Thursday and Friday mornin 6. De l..went c if ications of riling Equimnt National Archives and Rec- ords Service, to assist in collecting Information pertaining to the use of certain types of special filing equipment manufactured by &haw-W alkcr and used in Contact Division/0O, This inf stion viii be used In connection with the revision of specifications for tii1 g equ1.p er t now being sponsored by GSA. We were requested by W. 7. Records Center Anon& the t Records Center this past week were 25X1 I I Both re impressed Witb the operations o-. the eco s era the services now rendered to their respective offices. doubles the rate of activity as compared to the sere period last fir. As of this date, 90 accessioning jobs have been handled. ears necessary to have two laborers and a truck on Acs office, through proper channels, for this service t rate afternoons each week in order to improve the accession- service of the Center. A proposal will be made to the 25X1 Approved For Release 2005/11/21 : CIA-RDP70-00211 R000300270007-1 SE Approved For Release 2005/11/21 : CIA-RDP70,Q 211 R000300270007-1 Iftwo" Report for Week Ending 214 March 1954 from FORMS MANAGEMENT SECTION Project 4*.103. Preparation of Final Type Copy by Forms Management Section. Project approved 17 March. Discussed with More detailed discussions were held 23 March wit Project 1..85. PI Information Reports. Results of tests of combination record-copy-offset master set have been gratifying. Twelve record copies and an offset master were successfully prepared in a single typing, utilizing a carbon coated back record paper. Test results transmitted to FI for study and approval. Project 4-86. Forms Index. Punching of cards by Machine Records Division, 75% complete. Project 14-95. Forms Management Handbook. Chapter 3 is about 5% completed. Development of a savings cost system for inclusion in the handbook was discussed with 25X1 25X1 will be utilized in development of this system, Ana ys,s is being ma a of other government agencies efforts, if any, in this field. Training Material. Correction of art work has been completed by Grap tcs ORR. Preparation of slides continues by Printing and Reproduction Division/L0. Study of Stocked Forms Supply System. Poster development has been delayed by priority material required for Budget presentations. 25X1 25X1 d for approval 5 March has still not cleared Mr. proposals to effect direct initial distributions of forms from GPO or commercial printers to Building Supply Officers has been sus- pended pending further study of security aspects involved. In view of strong objections raised by Logistics, 00 Information Reports. Special Activities. An equipment showing of the Coxhead Liner Approved For Release 2005/11/x.1 : CIA-RDP70-00211 R000300270007-1 Approved For ReIeaSe 2 b M4f 1" Il_1 RDP7011 R000300270007-1 Siwiary of Individual Forms Actions No, of Requisitions No, of Copies New 17 Revisions 1 Reprints 7 Overprints 1 Other Agency 2 Total 213 25X1 Approved For Release 2? 8S/i 121 + 59,5OO 10,, 000 52,, 20O 100,000 3 500 ,200 k-'QP70-00211 R000300270007-1 ONFIDtNr SAL Approved For Release 2005/11/21 : CIA-RDP70- 211 R000300270007-1 -low Report for Week Ending 24 March 1954 from RECORDS SYSTEMS SECTION Project 4-79 The FBID Survey is continuing. The analysts report that since the visit of the Administrative Officer to the Records Center there appears to be no reluctance on the part of any of the offices to release material for transfer to the Records Center. The administrative officer has indicated in her discussions with us that she is very well satisfied with the Records Cen- ter service and the manner in which the records are being kept. Project 4-80 Microphotography Survey, Agency-wide No activity. Project 4-81 Security Desk Trays Following receipt of a memorandum from the Security Office requesting that the security desk trays be made without locks, discussions were held with representatives of the Procurement and Supply Divisions of the Logistics Office to determine the action necessary in getting trays made without locks. Arrange- ments were made with the Supply Division to furnish the necessary funds and initiate the procurement action upon receipt of a memorandum from this office requesting them to do so. Tentative arrangements were also made with the Safemaster Company to make up 50 4" trays with a latch but no lock at $14.00 each. The 50 trays will be used to test the latching device before ordering the trays in quantity. Project 4-82 Filing System - Handbook For Standard Agency System A meeting was held with representatives of the Training Office who have agreed to give their concurrence to the filing manual following a discussion of the questions raised in their com- ments. This leaves only the agreements with Office of Communications, Office of Personnel, and Inspector General to be completed prior to resubmittal of the manual to the Regulations Control Staff. Project 4-84 Microfilming Microfilming of vital materials in 0SI and OCD/BR is con- tinuing. Project 4-96 Vital Materials Handbook No activity. Approved For Release 2005/11/21 : CIA-RDP7O-00211 R000300270007-1 CONFIDtN I JAL Approved For R el 0Lji4Z11 IA-RDP70 211 R000300270007-1 25X1 has requested postponement of our discussions ns a on of the filing system for his office until com- pletion of the budget hearing ending this week. Supplies of standard folders and guides have been requisitioned for storage in the Records Center, and will be used by the analysts in making file installations throughout the Agency. Our experience indicates that we cannot depend on sufficient supplies from the Building Supply Officers. The Building Supply Officers do not maintain minimum stock levels for use when reordering supplies, and when they do run out we have found that several days are re- quired for them to get additional stock from Franconia. In preparing the last order for the purchase of standard guides, a mistake was made in the stock number with the result that guides with straight tabs instead of angular tabs were re- ceived. This was not detected until the tabs had been distributed to the Building Supply Officers. The problem was brought to our attention in obtaining additional guides in FBID, and resulted in some delay in our work there. However, the vendor was contacted and agreed to deliver a special order of 1,000 of the proper guides with 200 being delivered the following day. Efforts are now being made to return all of the straight cut guides received in error. In the future all weekly trips to the Repository will be made in the morning. These trips will be made on Wednesday, Thursday or Friday on a rotating schedule. The change was made necessary because of the additional time required to handle the increased volume of material being deposited. 25X1 Approved For Release 2005/11/21 : CIA-RDP70-00211 R000300270007-1 CONFIDEN $ IAL Approved For Rel rff~I I L RDP70QQ211 R000300270007-1 Report for Week Ending 24 March 1954 from RECORDS DISPOSITION SECTION 00 C. Disposal schedules prepared in connection with the OO/C disposition study are currently being reviewed by the National Archives and Records Service. It is anticipated that this review will be com- pleted and approval recommended to the Congress within the next week. Concurrently, ction is being taken to developk an instruc- tion for the , Division This instruction will constitute the basic tool or carry ng out the approved records disposal actions. Logistics 4-91. This project is being discontinued for a period of 2-3 weeks. The Logistics Records Officer is currently involved in activities other than records management. OSI 4-77- This project is still being delayed until special clearance is obtained for the assigned analyst. Handbook 4-97. No action. General consul 4-78. Disposition and maintenance plans for the records of this office are completed in draft form. We are waiting to discuss them with Mr. 25X 25X1 25X1 Approved For Releas(" S ID UDP70-00211 R000300270007-1 gske ut X11 Ui . Approved For Release 2005/11/21 : CIA-RDP70-0,Q, 11 R000300270007-1 Report for week ending 24 March 1954 from REPORTS AND CORRESPONDENCE MANAGEMENT SECTION 1. Program Promotion a. Office of Scientific Intelligence - 25X1 the ARO, to propose conducting reports and correspondence management programs in OSI. She was enthusiastic about both programs and stated she would discuss them with the Executive Officer. Literature was provided to further their knowledge of reports and correspondence management. b. Office of Personnel - In connection with our proposal to assist in revising form and pattern correspondence now used by the Office of Personnel, arrangements were made for us to receive samples of their correspondence prepared during Sep- tember 1953. Reports management was also discussed with Mr. 25X1 d program literature was furnished. 2. Program Publicity - The illustrated prospectus on reports man- agement is 9 complete. Completion is scheduled for 25 March. 3. Program Regulations - Reviewed he over-all 25X1 regulation on records mans gemen a. a sped c ones on reports and correspondence management. Revised drafts are now being typed. These should be completed by 25 March. 4. Writing Standards - Developed additional material to support our Oarrespondence Management Program. The subjects of "Troublesome Grammar" (uses of shall and will, should and would) and "Trends in Official Writing" were covered. 5. Correspondence Handbook, PN 4-98 - No activity pending receipt of working-level comments. 'A/ I/-99' 6. Office of the Comptroller Reports Management Program Guide - No activity pending receipt of comments on the proposed program guide. 25X1 Approved For Release fMtt 4`170-00211 R000300270007-1 Approved FQ.Release 2 f I!1N fd'JP40; 00211 R000300270007-1 i-" _7715 14W Report of the RECORDS CENTER for the week ending 23 March 1954 Visitors included personnel from Graphics, FBID, and the Auditor's Office, and several searchers examined records in the Center. As of this date 90 accessioning jobs have been handled. This rate of activity is about double that of the same period last year. A request has been made for the assignment to the Center of two laborers and a truck on three alternate afternoons during eack week. Suck an arrangement would greatly improve the accessioning service of the Center. Contact is being maintained within regard to 25X1 the staff study of Center operations. The draft copy is to be examined today by the Chief of the Center. 25X1 1CONFIDENTIAL Approved For Release 2005/11/21 : CIA-RDP70-00211 R000300270007-1