WEEKLY REPORT - WEEK ENDING 14 APRIL 1954

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP70-00211R000300270004-4
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
16
Document Creation Date: 
December 19, 2016
Document Release Date: 
October 12, 2005
Sequence Number: 
4
Case Number: 
Publication Date: 
April 14, 1954
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP70-00211R000300270004-4.pdf812.9 KB
Body: 
Approved For Release 2005/11/21: CIA-RDP7 211RQW. , ,027 Chief, Manasemnt Staff Chief, Records Management Branch Weekly Report ., Week ending li+ April 1954 'DIVISION 14 April 195 Buxom OF PROJECTS Weekly Report - Week ending 7 April 1954 Projects in Process 1.9 This Week: Added during week. 2 Compie ii luring week: 0 Change This includes inventory of records, devel ent of records control schedule, records disposal authority, installation of filing system and schedule for depositing vital Materials. CTS ADDED DURING WEEK 25X1 Records Survey of Audit Office ,This includes inventory of records, development of records control schedule, records disposal authority, installation of filing system and schedule for depositing Vita.l Materials. Discussion took place with medical Office representative who has just returned from an extensive field trip. It was tentatively agreed that .ditio.ai Vital Materials should be deposited and steps will be taken to proceed with this final phase of the survey. It is expected that it will be completed by 23 April. Project is approximately 75% complete. et -r CONFIDENTIAL FILED Pro ects in Process 21 office of scientific Project resumed. 163 items covering an estimated 502 linear feet of records have been identified and listed. Preliminary appraisals and disposition plans have been wade for each describable item. Project is approximately 22% complete. Approved For ReleaseQQ~/,7 12';C~A P70-00211 R000300270004-4 Approved For Ree ,L t d1 A-RDP70-Q 11 R000300270004-4 Report for week ending iii April 1954 from REPORTS AND CORRESPONDENCE MANAGE14ENT PROGRAM Project I-91 - Review of Records hanagement Program Logistics Office, Correspon ence Management Phase) 25XlMet with and discussed plans for an Office-wide correspondence management program. It was tentatively agreed that we will be furnished reading files from each division. After informal discussions on this material we will spot check in each division preparatory to a thorough survey. is very en- 25X1 thusiastic and cooperative. We anticipate a successfTil survey. Project 4-91 - Office of the Comptroller Reports Management Program No change from previous report. Project is approximately 10% complete. Project 4-98 - Correspondence Handbook Comments on the Handbook from all coordinating elements but the Inspector General were received from Regulations Control Staff. We also anticipate comments from the Office of the Director and the Executive Registry. A card index of these comments is being prepared to facilitate our analysis. General Information: a. Employee Suggestions: (1) No, 801, Procurement of EZERASE Stationery; and 818, Agency- wide use of Del-E-Tape Typewriter Ribbons and Correction Fluid - Tests were made of these products and their merits discussed with office suppliers, and representatives of the General Services Agency, Bureau of Standards, and the Navy Department. (2) No. 817, Manifold Carbon Interleaved Dispatch Form - Discussed 25X1this suggestion tirith and examined his report on a proposed pouch, tram procedure. it is believed that an analysis of this suggestion will assume the scope of a Management Staff project. b. Program Promotion: Our proposal to assist the Office of Personnel with the streamlining of their form and pattern correspondence is gaining acceptance. Our sug- gestions for improving a form letter given to us as a "test" were re- ceived favorably. Approved For Release 0 1 21 70-00211 R000300270004-4 Approved For Rsae 2GbI%~I 1/21 :CIA-RDP70-Q,Q211 R000300270004-4 low c, Standard Agency Correspondex: Plans to develop an index of routine repetitive internal corres- pondence were discussed with representatives of OSI and ORR. Both of these offices have developed pattern memoranda for some of the more common administrative requests. 25X1 Approved For Release '/ j~ C `ADP70-00211 R000300270004-4 d61 A* Approved For Release 2015111/21 C l`A- DP70-Q 11 R000300270004-4 Report for week ending iL April 1951 from FOi3MS MANAGEMENT SECTION Project 11-85 -? FI Information Reports Proofs of the dual-master set were received from the printer, corrected, approved and returned. Specifications are being written for the combination record copy-offset master set. Project L-86 - Forms Index Verification of first run data continues. New items are being integrated upon approval. Project L-95 - Forms Management Handbook No action this week. Project 4-103 - Preparation of Final-type Copy by Forms Management ion No action this week. Training Material Material borrowed from the Air Force has been returned. Study of Stocked Forms Supply System No action this week. 00 Information Reports No action - awaiting approval of revised form by 00/C. 25X1 No change in status,. Clearance for Civilian Contractors 25X1 Flo ee Sug estion #799 - Multiple Copy Carbonless Form Paper No change in status - awaiting additional information and paper samples to be furnished by NCR representative. Approved For Release 2005/11/21 : CIA-RDP70-00211 R000300270004-4 CONFIDENTIAL Approveor Release 2005/11/21 : CIA-RDP70-E11R000300270004-4 Report is in f ina 85% complete. s of preparation. Project is approximately filing system is continuing. Project Is ev. Office of General Counsel P r o s ect 4- 0 .. nc - ride 1 E.c oto a :Survey No change from previous report. Pro sect is approximately 5% complete. Project 4-8i - Security Desk ''rays No change from previous report. Project is approximately 85% complete. 4-82 - Handbook for the Sub ect Classification and Filing No change es ra._ence R Como - 25X1 previous report. Project is approximately 97% cOmPle' .es ft Review of the schedule for the Security Office resulted in a frequent deposit of records of employee badges issued. Arrangements were completed with ONE providing for a listing of all materials originating in other offices Which they considered essential for emergency use. Arrangements are now being made with the appropri- ate originating offices to deposit these materials. A deposit schedule for the Office of the General Counsel has developed and agreed upon with the Administrative Officer. . As the signature of the General Counsel is obtained.. the schedule will be complete. wProlect is approximately 4_84 - Vital.. Mss teriale Microfilm Prole Filming of records in OCD dossier file continues. Project is approximately 5% complete. Filming of, the `Personnel Office Vital Materials for this quarter is has requested that the filming of the remaining .o% be postponed until 19 mil, because of the excessive number of references being amde to these records. Filming in 0Sl is approximately 9% co fete and should be completed by 16 April. Approved For Release 2005/11/21 : CIA-RDP70-00211 R000300270004-4 R: Ar J, NF1t NTIAL Approved.or Release 2005/11/2 A=RDP70-0 Q11 R000300270004-4 4-85 - PI Tnfor st~ Proof of revised report farm received from Winter, corrected and returned for printing. Project to approximately 33% c mplete Project-4-86 - Forms Index Nev Items are being added to the Forms Index as necessary. Project is approximately complete. Pro,lecti 4-91 Review or Becordr, T,: na re nt Prog am eties offlee Mans- Discussed plans ?4 th Area Records Officer for Correspondence sent Pror . Plans have. been made to review reading, files from Div1sion.. Project is approximately 17% complefe. Pro et 4 9 - Acquisition of Certain Records from the Securities and Exchange ; cs car.: No change plete. Project 4- b change fr vious report. Project is approximately 754 com ce of Ca ptroller R previous repor . project is approximately I Project 4-22 _ Forms Management Handbook k1Yk YIo?M No change from previous report. Project is approxi . 1. piete . No cam, pl,e to . repor 4 . Project is approximately 5% complete. Records Disposition Handbook ous report. Project is approximately 2 Pro~eat 4::23 Corr-as irlencc Handbook the Handboo from all coordinating elewnts but t I were received from the Re ?.xlations Control Starr. also anticipate comments from the Office of the Director and the iiecutive Registry. A card index of these comments is being prepared to facilitate our analysis. Project is approximately complete. Approved For Release 20+055/11/2 Y F1 Vqgq0-0021 R000300270004-4 COa 4FIDEN I LAL Approved r Release 2005/11/21 : CIA-RDP70-00a11R000300270004-4 Tentative plans and specifications for the construction Of the new Records Center were discussed several times during the weel' with the architect assigned to I the by Logistics Office -- 25X1 I I Teas discussions concerned lighting, general layout or orrice space and telephone requirements. Also, security aspects of the. project were discussed vi , . a the Physical Security Branch, Security Officel an4 the 25X1 arc:hi.tect. As the result of a request fits lw are contact- ing the appropriate Records naze::aent people in the Impartments of the Army, Air Force and Navy, to determine their present inven- tories of JANIS material. 5 additional groups of records were received during the week, totaling 95 cu. 't. Accessioning of records continues at the rate of better than 1 job per day. Total accessions to date - .119. 25X1 quarterly inventory of materials. on deposit in the Repository was completed and distributed to each office. This inventory is pre- pared at the end of each calcandar quarter and reflects the materials which are currently in the Repository. 3. Review of Disposal Schedules - Contact Di-vision/00 Disposal plans developed in connection with the study of the records of this Office have been submitted to the National Archives for review. The schedule covering Field, Office records has been ap- proved. This bas been submitted to Congress. # Fors M na a nt: 'Where has been little opportunity to work on projects other than the 25 fog required by the Comptroller's Office for use in establish- ing accounting procedures at Class A field stations. Coordinated effort on th_- part of representatives from the Regulations Control Staff, Office of the Comptroller and the Forms Management Staff rapulltad In completion of this assignment. The 25 forms and 25X1 We been approved and sent to the Printing and Repro- auction Div sion. 49 requests for new, revised, reprinted or rprinted farms were received. 5. Correspondence Management: Fla to develop an index of routine repetitivo internal correspondence Approved For Release 2005/11/21: CIA-RDP70-00211 R000300270004-4 r(Th JFI flFN ! IAL CONFIrCN IAL Approved For Release 2005/11/21 : CIA-RDP70-0U11R000300270004-4 discussed vith representatives of 0SZ a e offices have developed tatteru memora for some of the 25X1 Attecntts Project Sheet Audit Office Project Sheet - FDD Approved For Release 2005/11/21 : CIA-RDP70-00211 R000300270004-4 'nme r*NTIAL Approved Foreleasr ?1 1 i_114!ADP70-0021 W00300270004-4 .2A 64i Report for week ending 14 April 1954 from REPORTS AND CORRESPONDENCE MANAGEI'JENT PROGRAM Project 1-91 - Review of Records Management Prograt, Logistics Office, kuorressonaence anagement P ase 25X1Met with and discussed plans for an Office-:L e corresponence managemen program. It was tentatively agreed that we will be furnished reading files from each division. After informal discussions on this material we will spot check in each division preparatory to a thorough survey. is very en- 25X1 thusiastic and cooperative. We anticipate a successful survey. Project 4-91 - Office of the Comptroller Reports Management Program No change from previous report. Project is approximately 10% complete. Project 4-98 - Correspondence Handbook Comments on the Handbook from all coordinating elements but the Inspector General were received from Regulations Control Staff, We also anticipate comments from the Office of the Director and the Executive Registry. A card index of these comments is being prepared to facilitate our analysis. General Information: a. Employee Suggestions: (1) No. 801, Procurement of EZERASE Stationery; and 818, Agency- wide use of Del-E-Tape Typewriter Ribbons and Correction Fluid - Tests were made of these products and their merits discussed with office suppliers, and representatives of the General Services Agency, Bureau of Standards, and the Navy Department. (2) No. 817, Manifold Qnrbon erleaved Dispatch Form - Discussed 25X1 this suggestion with and examined his report on a proposed pouchgram procedure. is be ieve that an analysis of this suggestion will assume the scope of a Management Staff project. b. Program Promotion: Our proposal to assist the Office of Personnel with the streamlining of their form and pattern correspondence is gaining acceptance. Our sug- gestions for improving a form letter given to us as a "test" were re- ceived favorably. Approved For Release 2001M11g00211 R000300270004-4 -1 NL Approved For Rele 009ff1122 k:UC A-RDP70-00211jZ000300270004-4 c. Standard Agency Correspondex: Plans to develop an index of routine repetitive internal corres- pondence were discussed with representatives of OSI and ORR. Both of these offices have developed pattern memoranda for some of the more common administrative requests. 25X1 Management Section Approved For Release 2 01112{1 ,QIA-RQp70-00211 R000300270004-4 pPp' 4+t k 14,5 I ~ ~ ~ ~~~ Approved For Releasd'2005/11:/21-: CIA- 7b-00214D00300270004-4 low Report for week ending 14 April 1954 from FORMS MANAGEMENT SECTION Project Li-85 FI Information Reports- Proofs of the dual-master set were received from the printer, corrected, approved and returned. Specifications are being written for the combination record copy-offset master set. Project 4-86 Forms Index Verification of first run data continues. New items are being integrated upon approval. Project 4-95 - Forms Management Handbook No action this week. Project 1??103 - Preparation of Final-type Copy Forms Management Section No action this week. Training Material Material borrowed from the Air Force has been returned. Study of Stocked Forms Supply System No action this week. 00 Information Reports No action - awaiting approval of revised form by OO/C. 25X1 No change in status,. Clearance for Civilian Contractors 25X1 Employee Suggestion ##799 -Multiple Copy Carbonless Form Paper No change in status - awaiting additional information and paper samples to be furnished by NCR representative. Approved For Release 2005/11/21 : CIA-RDP70-00211 R000300270004-4 CONFIDENItAL Approved For Release 2005/11/21: CIA-RDP70-00211 R000300270004-4 Report for week ending iI April 1,054 from RECORDS SYSTEMS SECTION Project L-76 - Records Management Survey, Medical Office No action this week, Project is approximately 75% complete, and will be completed about 23 April. Now awaiting decisions by medical office personnel regarding the deposit of certain vital materials in order to complete development of the vital 25X1 materials schedule - has returned from his trip and states that both he and Dr. Tietjen feel that additional materials should be deposited, and that he will meet with us upon completion of the numerous briefing and reports resulting from his recent field trip. Project 4-79 - Records Management Survey, FB1D Installation of the filing system throughout FB]D is continuing. Project is approximately 65% completed. Project 4-80 -Agency wide Microphotography Survey No change from previous report. Project It-81 - Security Desk Trays No change from previous report. Project !-82 - Handbook for the Subject Classification and Filing of Correspondence Records - 25X1 No change from previous report. Project I-83 - Vital Materials Deposit Schedules for all Offices 25X1 visited the repository as week or the purpose of inspecting their vital materials deposits. Each of these offices recently provided the repository with filing instructions and were well pleased with the arrangement of their vital materials,. 25X1 semi-annually, but it was agreed all concerned that quarterly deposits will be more practical. Each deposit will consist of a complete file and will authorize the destruction of the previous deposit. Approved For Release 2015/11/21 : CIA-RDP70-00211 R000300270004-4 - CONFIDENT-Al- Approved For Release 2000 *1.1*l t 70-0021 $,p00300270004-4 ONE has supplied us with a listing of materials originating in other offices which they consider essential for their use in an emergency. Arrangements are now being made with the appropriate offices to schedule the deposit of these reference materials. This scheduling will permit establishment of a complete schedule for ONE. The deposit schedule for the Office of General Counsel has been developed and agreed upon with the Administrative Officer, but is still held by that office awaiting the signature of Mr. Project 4-81 - Vital Materials Microfilm Projects Filming of the OCD/BR dossier file continues. This project is approximately 25% completed. Filming of the Personnel Office vital materials for this quarter is approximately 60% completed. The Area Records Officer for Personnel has requested that the filming of the remaining 40% be postponed until the 19th of April because of the excessive number of references being made to these records, Filming in OSI is approximately 98% completed, and should be completed the 16th of April. General Information A representative of Remington-Rand was referred to this office 25X1 by f the Procurement Division/LO to discuss their stock items which could meet our specifications for standard folders and guides. .-Answers were prepared and. forwarded on three Enployee Suggestions. The inventory of Vital Materials for the quarter ending 31 March 54 has been distributed. 25X Approved For Release 2005/11/21 : CIA-RDP70-00211 R000300270004-4 "At Approved For ReleaGON1fl9NUAIRDP70-00211 8000300270004-4 Report for Week Ending 14 April 1954 from RECORDS DISPOSITION BRANCH Project 4-77 - Records Management Survey,, Office of Scientific Intelligence This project is again progressing in a satisfactory manner. 163 items covering are estimated 502 linear feet of records have been listed. Preliminary appraisals and disposition plans have been made for each item. Project 4-78 - Records Management Survey, Office of General Counsel Report is prepared and is being submitted for consideration and approval. Project 4I.-91 - Records Management Program, Logistics Office No change from previous report. Project 4-92 - Acquisition of Records from the Securities and Exchange Commission No change from previous report. Project 4-97 - Records Disposition Handbook No change from previous report. Office of Operations, Contact Division Disposal plans developed in connection with the study of the records of this Office have been submitted to the National Archives for review. The schedule has been approved and submitted to the Congress. Two items on the head- quarters schedule have been the subject of continuing debate for the past two weeks. The Archives Analyst that prepared the appraii0al report was in complete agreement with our proposal. His Chief, how- ever, is in disagreement. 25X1 25X1 Approved For Release 2005/11/21 : CIA-RDP70-00211 R000300270004-4 CONFIDENTIAL UUNHLJENT~ Approved For Releasf' 305131/2 70-0021m1Rp00300270004-4 Report of the RECORDS CENTER for the week ending 13 April 1954 Modifications in plans for the new Records Center were discussed 25X1 with here appears to be some concern on the part that funds allotted for construction may not be adequate. he eels that alternative plans cutting costs must be developed. In line with this thinking, the proposed dark room area has been deleted and incandescent stack lighting is being adopted rather than fluorescent. Other details discussed included lay-out of office space and telephone conduits; physical security factors and physical disposal processes. More details on these discussions will be submitted in a memo for the record. 25X Apparently earlier reports on holdings made to dad not include materials held in bulk storage. furnishing a statement of their holdings of JANIS material. Both the Army and Air Force have been contacted in regard to To date 119 accession transactions have been handled during the calendar year. This activity continues at the rate of better than one job per working day. During this week the following accessions were received: CCD 23. cubic feet CC 62 Logistics 1 Co troller 5 DD/P 4 25X 25X1 CONFIDENTIAL Approved For Relea a 0~.5/j 1t . C1A=## P70-00211 R000300270004-4 Approved For Release 2005/11/21 CIA-RDP70-00211 R000300270004-4 Standardization of Forms and Procedures, Class A Finance Offices 25X1 Printing and Reproduction Division/LO. 81 man hours were expended y our staff to complete this priority project. Both forms and directive were considerably improved as a direct result of our review. Summary of Individual Forms Actions No, of Requisitions New 33 Revised 9 Reprint 6 Overprint 1 Other Agency - Total 149 25X1 No, of Copies 203, 225 !7,100 39,000 3,000 292 325 Approved For Release 2005/11/21 : CIA-RDP70-00211 R000300270004-4