WEEKLY REPORT - WEEK ENDING 1 DECEMBER 1954

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP70-00211R000300240005-6
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
9
Document Creation Date: 
December 19, 2016
Document Release Date: 
September 19, 2005
Sequence Number: 
5
Case Number: 
Publication Date: 
December 2, 1954
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP70-00211R000300240005-6.pdf454.44 KB
Body: 
Approved For Rele t: (CIA-RDP70-00211 R000300240005-6 nt staff 2 17eabe Chief, Records Management Division weekly Report -, Week Ending 1 December 1954 1. The review of the 1711,/ records control schedule has been completed.. Action can now be taken by M /P to dispose of 11.7 categories of records. Since the schedule prepared by DD/P did not disclose the volume of records, it is not possible to determine in terms of filing equipment bow much material can be eliminated from active office space. A request has been sub- mitted for this information and as soon as it is received a furtlutr report will be given to you. It appears, however, based on the schedule, that a substantial amount of material will not be retained permanently. 2. Some activity is nov taking place in the Security Office with respect to the preparation of a records control our pie who are working with him that a substantial volume of records can be transferred to the Records Center if the officials of the security Office agree with our recom endations . advised by i111/P that a shipment of epproxi _ e cabinets of inactive records vill be received in am overseas for storage in the Center. 4. A representative of the Logistics Office advised us that the new Records Center building in scheduled for completion on 13 January 1955. The equivalent of 15 cabinets of inactive records transferred to the Records Center. The total records in the Center are now equivalent to 2,108 file cabinets. 25X1 Approved For Release 2005/11/21 : CIA-RDP70-00211 R000300240005-6 NFIDLN ,v AL Approved For Rele O D# l:IAI-RDP70-QQ11R000300240005-6 Report for Week Ending 1 December 1954 from RECORDS SYSTEMS BRANCH Project I80 Agency Wide Microphotography Survey Project is continuing and is approximately 37% complete. Project 4-81 - Security Desk Trays Project is continuing and is approximately 90% complete. Records Company submitted a sample tray of a simplified design which they indicated could be made for approximately 5.00. Re- quirements for actual procurement and distribution of the trays were discussed with representatives of the Logistics Office and it is anticipated that procurement action will be initiated within the next week. Project 4.-82 - Filing System - Handbook for the Subject Classification ~" and Filing of orrespondence Records, HB 0-1 0 No change from previous report. Project is approximately 99% complete. Project 483 - Vital Materials Deposit Schedules for All Offices Project is continuing and is approximately 65% complete. Project 4-84. - Vital Materials Microfilm Project Microfilming of the OCD/BR dossiers continues. This project is approximately 67% complete. Microfilming of special material in OSI has been completed. Microfilming of vital materials in the Security Office continues. This project is approximately 80% complete. Project 4-96 - Vital Materials Handbook No change from previous report. Project is approximately 12`;0 complete. Project 5-56 - Surve of Cable Reference Dis osition and Vital Materials equirements A meeting with representatives of the Office of Comrainications, Cable Secretariat and RI/FI has been scheduled to discuss the recommendations contained in the report. Project is approximately 99% complete. Approved For Release G I1f1 ALP70-00211 R000300240005-6 Approved For ReIefNF1 !AL-RDP70-QQ11 R000300240005-6 low, Project 5-59 -Revised courier Receipt and Logging System No change from previous report. Project is approximately 5% complete. Project 5-60 - Cable Receipting System No change from previous report. Project is approximately 5% complete, General Information of this office met wi tit d f OSI to instruct I in the operation of the new Diebold Portable Microfilm machine. This meeting resulted from a request from for the loan of a microfilming machine n, n of OSI As o 25X1 . to film vital materials in the Nuclear tmergy lvisi only can film these documents, it was necessary to ac- quaint him with the operation of this new camera. Chef of Sovmat Staff and the Area Records 25X1 1 .9 Officer, visited the Repository this week to review their vital materials holdings. Resulting from this review, one (1) cubic foot of superseded material was destroyed. I Istated that in the future more adequate disposition instructions irn e provided the Custodian which will permit the destruction or withdrawal of superseded material upon receipt of a more current deposit or finished report. We were requested b OCD/BR, to train one of his men in the use of a Model E Recorc ' crofilm Machine. I e arrangements for obtaining the machine and spent about 6 hours in instructing the man how to use it, in making tests, and in assembling supplies for a proposed field trip. Arrangements have been completed with the Machine Records Division to prepare tabulating cards for use in preparing a listing of Management Staff reference material. As accretions are added, new listings will be prepared from the cards and distributed throughout the Management Staff. A proposed notice is being prepared which will require a certification from the Area Records Officers that existing filing cabinets are being properly utilized before ordering additional ones. This notice con- formcwith the intent of the GSA regulation which requires a similar certi- fication from the Agency's Records Officer for the purchase of new equip- ment. Approved For Release 2005/11 /?1 : CIA-RDP70-00211 R000300240005-6 25X1 25X1 25X1 CONFIDENTIAL Approved For Re1gag1f6@FFflA-RDP70;Q,p211 R000300240005-6 Report for Week Ending 1 December 1954 from REPORTS AND CORRESPONDENCE MANAGENIEN T BRANCH Project L-91 - Review of Records Management Program Logistics Office Reports and orrespondence ;anagement No change in project status. The correspondex is 90% complete insofar as the Logistics Office is concerned--60% complete with respect to promoting its use throughout Headquarters. The re- ports management phase is 20% complete. Project 4-914 - Office of the comptroller Reports Management Program No change in program status. Project is 23% complete. Project-98 -Correspondence Handbook Handbook is being reviewed by Miss Dove. Project is 95% complete. General Information a. Glossary of Administrative Terminology - Card indexing and cross referencing of terms was completed. Typing of the draft for approval by DD/A will commence today or tomorrow. Project is 53% complete. b. Employee Suggestions (1) No. 1038, Indicating the Sterility of Correspondence on File Copies - Replies have been received from t, of the ARO's requested to comment on the suggestion. `~ (2) No. 1357, Headquarters - Wide use of Commercial Size and Legal Size Letterex, and No. 1358, Procurement of Standard Form No. 611. (Short Form Office hemorandum) in Pads of Bond and Tissue Sets - Fact gathering on these suggestions has been completed. c. Guides to Effective Writing Chief of OTR Plans and esearc STaff, reported his staff is reviewing the pamphlet material we furnished. In response to a request byl staff, we developed a guide to minutes writing. She has also requested an analysis of her writing.. 25X1 25X1 25X1 Approved For Relea Tf J ERDP70-00211 R000300240005-6 Approved For Re i"e se11 )2 CIA-RDP70-Q 11 R000300240005-6 REPORT FOR WEEK ENDING 30 NOVEMBER 1954 RECORDS CENTER BRANCH Acces iaoning Information has been received from the Area Records Officer, DD/P, that shipment of approximately 410 cubic feet of records has been started from an overseas installation. The time of arrival in the Records Center has not yet been determined. The Center received 33 Archives b@xes (14 cubic feet) of Captured Japanese documents returned from the Federal Records Center on a permanent withdrawal. These records are being held pending completion of arrangements for trans- ferring them to Army, G2. Total holdings of records retired to the Center from active files in expensive office space is now 8,050 cubic feet. Accessioning transactions are averaging more than 1 per working day for this calendar year. During this week the following accessions were made: 0 0 Logistics Comptroller OCI ORR OCD OSI Training Sub-total Finished Intelligence Total Total accessions to date - 353. General 67 Cubic Feet 17 :O 10 4 2 2 113 Cubic Feet 8 -t It 121 Cubic Feet of LO/TD conferred with egarding details of the Center move. It was agreed that o d furnish 5 laborers to unload and shelve fifty pallets per day. At this rate, the move will take 20 working days. A visit was made to the new Center building where nspected the receiving area layout. Completion date for the construction as now been moved to January 13, 1955. After conferring with O/RE, it appears that the tentative move date in staff study will be February 1, 1955. 25X1 25X1 25X1 / Approved For I /21 :CIA-RDP70-002118000300240005-6 Approved For Release 2 1 / : *970-0041 R000300240005-6 Report for Week Ending 1 December 1954 from FORMS MANAGEMENT BRANCH Project 4-85 - FI Information Reports Discussions with DD/P and Logistics Office personnel con- cerning a distinctive modified format for the FI Infor- mation Report continued during the week with several differ- ent versions being developed in an effort to meet that office's requirement for a distinctive format which will, at the same time, meet our objective more efficient oper- ations at less cost." Three final proposals have been developed for submission today. Project 74.2% complete. Project 4-86 - Forms Index A total of 130 forms have to date been obsoleted as a re- sult of this project. 110 are CIA forms and 20 are forms of other government agencies. Of this amount, 39 were dis- continued by this office because of inactivity. Project is 78.76% complete. Project 4-95 - Forms Management Handbook No change. Project is 10% complete. Project 4-103 - Preparation of Final-Type Forms Copy by Forms Management Branch No change. Project is 11% complete. 00 Information Report Unsatisfactory test conditions reported last week have now been entirely resolved. Arrangements have been made with the printer to obtain a price adjustment on a new order just submitted which will compensate the Agency for inconvenience and delays suffered by the printer's error. Individual and Group Information Reports Proofs have been approved by the office of primary interest and returned to the printer delivery. Extra ozalid copies were furnishe for use in discussions with representatives o e ommittee. Forms Management Program Booklet Printed copies of the booklet were received yesterday and will be distributed to Area Records Officers and other interested individuals in the near future. Approved For ReleaG i -1RDP70-00211 R000300240005-6 ONFIDEN i lI. Approved`For Release 2005/11/21 : CIA-RDP70-0Q1R000300240005-6 Forms Management Poster - "Don't Waste Forms" Rerun of a previously unsatisfactory printing was received today. The new poster is considerably easier to read be- cause of a better use of color. Posting in all Agency buildings will be accomplished as soon as possible. Summary of Individual Actions New Reprints Revisions Other Gov't. Forms Overprints 12 Redesignated 2 1,000 4 42,000 14 36,400 79,400 25X1 Approved For Release 2005/1-1121 : CIA-RDP70-00211 R000300240005-6 CONFIDENTIAL Approved r ReIE g 1 T1 -RDP70-04,21 R000300240005-6 Report for Week Ending'1 December 1954 from RECORDS DISPOSITION BRANCH Project 4-77 - Office of Scientific Intelligence No change from previous report. Project is 99% complete. Project 4-78 - Office of General Counsel The training of personnel in the use of the file plan is complete. It is anticipated that the disposition plan will be approved and signed by the General Counsel within a few days. Project is 99% complete. Project 4-97 - Records Dis osition Handbook The Handbook is still in the coordination process and comments are to be submitted to Regulations Control Staff by 3 December 1954. Project is 85% complete. Project 4-116 - Security Office The Records Control Schedule is being prepared by the Area Records Officer and will be submitted to the Office staff for formal approval. Project is 87% complete. Project 5-2 - Office of National Estimates No change from previous report. Project is 99% complete. Project 5-32 - Office of Research and Reports As of this date, 213 describable items covering an estimated 24.03 linear feet of records have been listed. Project is continuing and is approximately 29% complete. An estimated 10 linear feet of correspondence, reports, surveys and other papers documenting the "Janis" intelligence production program have been collected and will be retired to the Records Center. This material will be consolidated with the Janis publications already in the Center and will provide a complete history of the entire Janis program. Project 5-40 Office, Chief of Operations A discussion will be held with the Area Records Officer the latter part of this week regarding the Records Control Schedule for the Office. A few changes in the Schedule may be necessary and it is anticipated that the signature of the Chief of Operations will be obtained within the week. Project is 75% complete. Approved For jjJlT - j41-RDP7O-OO2l1 R000300240005-6 D N T TIAL Approver ReltOM#;I A-RDP70-0WlR000300240005-6 General Information An appraisal was made of the consolidated Records Control Schedule as requested by the DD/P Area Records Officer. The Schedule consisted of 117 items and was above average in coverage and detail. The Schedule was approved and the disposal standards can be applied immediately. As it was a consolidated schedule the figures for the amount of records covered and equipment used are not immediately available. This omission was discussed with of DD/P and we were in- formed that if permission was granted for the disclosure of that information we would be notified immediately. A permanent withdrawal of 37 boxes of captured Japanese Ordnance documents has been made from the National Archives. The request for these documents was received from the Assistant Chief of Staff, G-2. Plans are now being coordinated for shipment of these documents to the Army. 25X1 11 ffifflEP70-0021 1 R000300240005-6 Approved For Release F 41